International Telecommunication Union   ITU
Franįais  Espaņol
 
Site map Contact Us Print version
  Home : ITU-R : TG5.1 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R TG5.1  C 

ITU-R TG5.1

Task Group 5/1 - WRC-19 agenda item 1.13

Results:478 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 28 ]  
 
Reply liaison statement to Task Group 5/1 on parameters for WRC-19 agenda item 1.13 (copy for information to Working Parties 5C and 5D)     WP 7B   AI1.13   2016-11-01
[ 27 ]  
 
Liaison statement to Task Group 5/1 on parameters concerning the radio astronomy service for WRC-19 agenda item 1.13     WP 7D   AI1.13   2016-11-01
[ 26 ]  
 
Liaison statement to Working Party 4A (copied for information to Working Parties 3J, 3K, 3M, 4C, 5A, 6A, 7B and Task Group 5/1) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 5D     2016-10-17
[ 25 ]  
 
Liaison statement to Task Group 5/1 (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.13     WP 4A   AI1.13   2016-10-14
[ 24 ]  
 
Liaison statement to Working Party 5D (copied for information and action (if any) to Working Parties 4C, 5A, 6A, 7B and Task Group 5/1 and copied for information only to Working Parties 3J, 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 4A     2016-10-06
[ 23 ]  
 
Reply liaison statement to Task Group 5/1 - MSS parameters for studies under WRC-19 agenda item 1.13     WP 4C   AI1.13   2016-09-29
[ 22 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-19     Chairman, CPM-19     2016-09-19
[ 21 ]  
 
Information document on the updated tentative meeting schedule of Task Group 5/1     Chairman, TG 5/1     2016-08-12
[ 20 ]  
(Rev.1) 
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz     WPs 3K and 3M     2016-07-04
[ 19 ]  
 
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS)     WP 3M     2016-07-04
[ 18 ]  
 
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 5D     2016-06-28
[ 17 ]  
(Rev.1) 
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D     WP 5D   AI1.13   2016-06-20
[ 16 ]  
 
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D     Chairmen, SG 3, WP 3J, WP 3K, WP 3M   AI1.13   2016-06-01
[ 15 ]  
+Ann.1-2 
Report on the meeting of Task Group 5/1 (23-25 May 2016)     Chairman, TG 5/1     2016-05-24
[ 14 ]  
 
Final list of participants - Task Group 5/1 (Geneva, 23-25 May 2016)     Director, BR     2016-05-24
[ 13 ]  
 
List of documents issued (Documents 5-1/1 - 5-1/13)     BR Study Groups Department     2016-05-20
[ 12 ]  
 
Liaison statement to ITU-R Working Parties 3M, 4A, 4C, 5A, 5D, 7B, 7C and 7D (for information to Task Group 5/1) - WRC-19 agenda item 1.14     WP 5C     2016-05-20
[ 11 ]  
 
Proposed liaison statement concerning WRC-19 agenda item 1.13     Canada     2016-05-16
[ 10 ]  
 
Considerations on the working methods within Task Group 5/1     Canada     2016-05-16
[ 9 ]  
 
Proposal for organisation of the work within ITU-R Task Group 5/1 for the preparation of the studies relevant to WRC-19 agenda item 1.13     Brazil (Federative Republic of)     2016-05-16
[ 8 ]  
 
Selection of the sharing and compatibility study scenarios on WRC-19 agenda item 1.13     European Space Agency     2016-05-13
[ 7 ]  
 
Down selection the sharing and compatibility study scenarios on WRC-19 agenda item 1.13     China (People's Republic of)     2016-05-13
[ 6 ]  
 
Proposed work method and work plan for Task Group 5/1 on agenda item 1.13     China (People's Republic of)     2016-05-13
[ 5 ]  
 
Terms of reference, allocation of work and draft CPM Report structure     Chairman, TG 5/1     2016-05-13
[ 4 ]  
 
Note to Study Group 5 - Working Party 5D work on agenda item 1.13     SG 5     2016-05-09
[ 3 ]  
 
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)     SG 5     2016-05-09
[ 2 ]  
 
Organization of ITU-R Task Group 5/1 for the preparation of the studies relevant to agenda item 1.13 of WRC-19     United Kingdom of Great Britain and Northern Ireland     2016-05-03
[ 1 ]  
 
Considerations on working method of Task Group 5/1     Japan     2016-04-28
Results:478 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright Š ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-16