Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 153 ]
|
ITU-R Study Group 7 Recommendation to be brought to the attention of Study Group 5
|
BR Study Group Department
|
|
2009-03-10 |
|
[ 152 ]
|
Liaison statement to Working Parties 5A and 5C - Copy to Working Party 5B for information -
Use of Recommendation ITU-R F.1336-2 for the 790 862 MHz band
|
WP 5D
|
|
2009-03-10 |
|
[ 151 ]
|
Liaison statement to Working Party 5C - Information regarding studies under Question ITU-R 232-1/7
|
WP 7C
|
232/7
|
2009-02-27 |
|
[ 150 ]
|
Reply liaison statement to Working Party 5C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz
|
WP 7C
|
|
2009-02-27 |
|
[ 149 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 3L and 7A for information) - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671 (WRC-07))
|
WP 7C
|
|
2009-02-27 |
|
[ 148 ]
|
Liaison statement to Working Parties 5C, 4A (copy to Working Parties 1A, 7B, 7C for information) - WRC-11 Agenda item 1.8 - Consideration of technical and regulatory issues relative to the fixed service in the bands between 71 GHz and 238 GHz
|
WP 7D
|
|
2009-02-24 |
|
[ 147 ]
|
Draft revision of Recommendation ITU-R F.1249-1 - Maximum equivalent isotropically radiated power of transmitting stations in the fixed service operating in the frequency band 25.25-27.5 GHz shared with the inter-satellite service
|
Chairman, SG 5
|
|
2009-02-24 |
|
[ 146 ]
(Rev.1) |
Result of the Study Group 5 meeting in relation to Document 5/114 proposing the texts for scopes of certain Recommendations
|
Chairman, SG 5
|
|
2009-02-24 |
|
[ 145 ]
|
Liaison statement - Establishment of Focus Group on Future Networks (FG-FN)
|
ITU-T SG 13
|
|
2009-02-16 |
|
[ 144 ]
|
Results of the meetings of the CVC and the RAG
|
Chairman, SG 5
|
|
2009-02-06 |
|
[ 143 ]
|
Further information for the preparation of the draft CPM Report to WRC-11
|
Chairman, CPM-11
|
|
2009-01-27 |
|
[ 142 ]
|
Liaison statement to Working Parties 5A, 7D and 6A (copy to Working Parties 5C and 7B for information) on studies related to WRC-11 Agenda item 1.15
|
WP 5B
|
|
2008-12-03 |
|
[ 141 ]
|
Liaison statement to Working Party 5B (copy to WP 5C for information) - Land mobile radio use of the 138-174 MHz band related to WRC-11 Agenda item 1.14
|
WP 5A
|
|
2008-12-02 |
|
[ 140 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 5B, 5C and 5D) - Information on short-range devices related to WRC-11 Agenda item 1.22
|
WP 5A
|
|
2008-12-02 |
|
[ 139 ]
|
Liaison statement to Working Party 1B - On the study of software-defined radio and cognitive radio systems (copy for information to WPs 5B and 5C)
|
WP 5A
|
|
2008-12-02 |
|
[ 138 ]
|
Note from the Chairman of Joint Task Group 5-6 - Sharing studies under Resolution 749 (WRC-07) and Resolution 224 (Rev. WRC-07)
|
Chairman, SG 5
|
|
2008-11-28 |
|
[ 137 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Progress on the working document towards a preliminary draft new Recommendation ITU-R BT.[ENGUSER]
|
WP 6B
|
|
2008-11-21 |
|
[ 136 ]
|
Liaison statement to Working Parties 7B, 4A and 5C - Information regarding aeronautical mobile applications used or planned in the band 37-38 GHz, including technical characteristics and protection criteria
|
WP 5B
|
|
2008-11-18 |
|
[ 135 ]
|
Reply liaison statement to Working Party 5A, copies to Working Parties 5C, 6A on studies realted to WRC-11 Agenda item 1.23
|
WP 5B
|
|
2008-11-17 |
|
[ 134 ]
|
Liaison statement to Working Party 7B (copy to Working Parties 5A, 5C and 6A) - Compatibility studies between radiolocation and space research service
|
WP 5B
|
|
2008-11-17 |
|
[ 133 ]
|
Liaison statement to Working Party 6A (copies to Working Party 5A, Working Party 5C, Working Party 7B and Working Party 7D for information) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications
|
WP 5B
|
|
2008-11-17 |
|
[ 132 ]
|
Liaison statement to ITU-R Working Parties 5A and 5C (copy to Working Parties 6A and 7B) - Initial considerations on compatibility between proposed new systems in the radiolocation service in bands 138-144 MHz and 154-156 MHz and other services operating in these bands
|
WP 5B
|
|
2008-11-17 |
|
[ 131 ]
|
Liaison statement to Working Party 6A (copy to Working Parties 5A and 5C) - On a primary allocation to the radiolocation service in the portion of the band 30-300 MHz
|
WP 5B
|
|
2008-11-17 |
|
[ 130 ]
|
Liaison statement to Working Party 4A (copy for information to WP 5C) - BWA characteristics for use in compatibility studies with fixed-satellite service systems in the 3 400-4 200 MHz band
|
WP 5A
|
|
2008-11-07 |
|
[ 129 ]
+Ann.1-23 |
Report on the meeting of Working Party 5C
|
Chairman, WP 5C
|
|
2008-11-05 |
|
[ 128 ]
|
Final List of Participants (Geneva, 27 October - 5 November 2008)
|
Director, BR
|
|
2008-04-11 |
|
[ 127 ]
(Rev.1) |
Liaison statement to Working Parties 5B, 5C and 6A - Working document towards draft CPM text for WRC-11 Agenda item 1.23
|
WP 5A
|
|
2008-10-31 |
|
[ 126 ]
|
Liaison statement to Working Parties 5B, 5C and 6A - Work plan for studies related to WRC-11 agenda item 1.23
|
WP 5A
|
|
2008-10-31 |
|
[ 125 ]
|
Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20)
|
WP 5A
|
|
2008-10-31 |
|
[ 124 ]
|
Liaison statement to Working Party 5B - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications (WRC-11 Agenda item 1.15)
|
WP 6A
|
|
2008-10-31 |
|
[ 123 ]
|
Liaison statement to Working Party 5C - Progress on WRC-11 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 6A
|
|
2008-10-31 |
|
[ 122 ]
|
Liaison statement to ITU-R Working Party 5A (and copy to WP 5C for information) on the study of Software-Defined Radio and Cognitive Radio Systems and their potential impact to the maritime mobile service including Global Maritime Distress and Safety System (GMDSS); Aeronautical mobile service and radiodetermination service
|
WP 5B
|
|
2008-10-31 |
|
[ 121 ]
|
List of documents issued (Documents 5C/26 - 5C/121)
|
BR Study Group Department
|
|
2008-10-24 |
|
[ 120 ]
|
Renumbered Questions within Study Group 5
|
Director, BR
|
|
2008-10-23 |
|
[ 119 ]
|
Liaison statement to Working Party 5C - Methodology for statistically calculating the interference received by the fixed service form space-to-earth emissions for frequency bands above about 17 GHz
|
WP 4A
|
|
2008-10-23 |
|
[ 118 ]
|
Liaison statement to Working Party 5A (copy to Working Party 5C for information) - Studies on compatibility of broadband wireless access (BWA) networks and fixes-satellite service (FSS) networks in the 3 400-4 200 MHz band
|
WP 4A
|
|
2008-10-23 |
|
[ 117 ]
|
Liaison statement to Working Parties 7B, 5B and 5C - WRC-11 Agenda item 1.12
|
WP 4A
|
|
2008-10-23 |
|
[ 116 ]
|
Liaison statement to ITU-R Working Parties [5A], 5B and [5C] - WRC-11 Agenda item 1.18
|
WP 4C
|
|
2008-10-22 |
|
[ 115 ]
|
Liaison statement to ITU-R Woking Party 5C - Proposed revisions to Recommendations ITU-R M.1319-2, ITU-R M.1469-1, ITU-R M.1472, ITU-R M.1473 and ITU-R M.1474
|
WP 4C
|
|
2008-10-22 |
|
[ 114 ]
|
Liaison statement to WPs 3L, 5B and 5C - Arrival time difference lightning detection systems in the meteorological aids service in operation below 20 kHz (WRC-11 Agenda item 1.16)
|
WP 7C
|
|
2008-10-22 |
|
[ 113 ]
|
Report of correspondence group for the analytical list and the scopes of the F-Series Recommendations
|
Rapporteur of CG-anlist
|
|
2008-10-22 |
|
[ 112 ]
|
Report of correspondence group for the analytical list and the scopes of the SF-Series Recommendations
|
Rapporteur of CG-anlist
|
|
2008-10-22 |
|
[ 111 ]
|
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20)
|
WP 4A
|
|
2008-10-22 |
|
[ 110 ]
|
Liaison statement to interim Working Party 5C - Results of the consideration on the SF-Series Recommendations
|
WP 4A
|
|
2008-10-22 |
|
[ 109 ]
|
Liaison statement to Working Parties 4A, 5A, 5B and 5C on WRC-11 Agenda item 1.12
|
WP 7B
|
|
2008-10-21 |
|
[ 108 ]
|
Liaison statement to Working Party [5C] - Information for studies related to WRC-11 Agenda item 1.25
|
WP 4C
|
|
2008-10-21 |
|
[ 107 ]
|
Liaison statement to Working Parties 5B and 5C - Organization of AMS(R)S spectrum requirement studies (WRC-11 Agenda items 1.3 and 1.7)
|
WP 4C
|
|
2008-10-21 |
|
[ 106 ]
|
Proposal for establishing a draft new ITU-R Question and framework of corresponding draft new ITU-R Report
|
Russian Federation
|
|
2008-10-21 |
|
[ 105 ]
|
Cross-border sharing and compatibility
|
Brazil (Federative Republic of)
|
|
2008-10-20 |
|
[ 104 ]
|
Draft revision of Question ITU-R 234/9 - Technical and operational characteristics of fixed wireless systems for frequency bands between 71 and 238 GHz
|
Brazil (Federative Republic of)
|
|
2008-10-20 |
Results:603 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):