Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 256 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments
|
WP 5D
|
|
2013-07-17 |
|
[ 255 ]
|
Liaison statement to Study Group 4, Working Party 5B, Study Group 7 and ICAO - Request for measured data in connection with Question ITU-R 233/3 and Recommendation ITU-R P.528
|
WP 3K
|
233/3
|
2013-07-05 |
|
[ 254 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities
|
WP 1B
|
|
2013-06-21 |
|
[ 253 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station
|
WP 1B
|
|
2013-06-21 |
|
[ 252 ]
|
Liaison statement to Working Party 4C (copy to Working Party 4A) - WRC-15 agenda item 1.10
|
WP 5B
|
|
2013-06-12 |
|
[ 251 ]
|
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6
|
WP 5B
|
|
2013-06-12 |
|
[ 250 ]
|
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.8
|
WP 5C
|
|
2013-06-05 |
|
[ 249 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1
|
WP 5C
|
|
2013-06-05 |
|
[ 248 ]
|
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6
|
WP 5C
|
|
2013-06-05 |
|
[ 247 ]
|
Liaisons statement to Working Party 4A - Proposed suppression of certain SF-series Recommendations
|
WP 5C
|
|
2013-06-05 |
|
[ 246 ]
|
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6
|
WP 5A
|
|
2013-06-05 |
|
[ 245 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 agenda item 1.1
|
WP 5A
|
|
2013-06-04 |
|
[ 244 ]
|
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16]
|
ITU-T JCA-AHF
|
|
2013-05-23 |
|
[ 243 ]
|
Liaison statement on nomination of JCA-AHF representatives
|
ITU-T JCA-AHF
|
|
2013-05-14 |
|
[ 242 ]
+Ann.1-36 |
Report on the meeting of Working Party 4A (Geneva, 2-10 May 2013)
|
Chairman, WP 4A
|
|
2013-05-10 |
|
[ 241 ]
|
Final list of participants - Working Party 4A (Geneva, 2-10 May 2013)
|
Director, BR
|
|
2013-05-10 |
|
[ 240 ]
|
Clarification to the survey of status of FSS assignments in the MIFR in the 10.95-30.0 GHz bands (WRC-15 Agenda item 1.5)
|
Director, BR
|
|
2013-05-06 |
|
[ 239 ]
|
Liaison Statement to Working Party 4A - [Preliminary] draft new Report ITU-R S.[VSAT]
|
WP 4B
|
|
2013-05-03 |
|
[ 238 ]
|
Reply liaison statement to Working Party 5B (copy for information to Working Party 4A) - WRC-15 Agenda item 1.5
|
WP 4B
|
|
2013-05-03 |
|
[ 237 ]
|
List of documents issued (Documents 4A/125 - 4A/237)
|
Br Study Groups Department
|
|
2013-05-01 |
|
[ 236 ]
|
Working document - Examination under § 2.2 of Annex 4 of Appendix 30B
|
Luxembourg
|
|
2013-04-25 |
|
[ 235 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)
|
Luxembourg
|
|
2013-04-25 |
|
[ 234 ]
|
WRC-15 Agenda item 1.6.1/1.6.2: Consideration of the band 14.5 - 14.8 GHz
|
Intelsat, LLC
|
|
2013-04-25 |
|
[ 233 ]
|
US broadcasters'submission in response to the FCC's notice of proposed rule making concerning the amendment of the Commission's rules with regard to commercial operations in the 3 550-3 650 MHz band
|
North American Broadcasters Association (NABA)
|
|
2013-04-24 |
|
[ 232 ]
|
Technical criteria used in application of RR No.9.41 in respect of coordination under RR No.9.7
|
Telenor ASA
|
|
2013-04-25 |
|
[ 231 ]
|
Initial evaluation of the 8 degree coordination arc between geostationary fixed-satellite service networks in 17.7-20.2 GHz and 27.5-30 GHz
|
United Kingdom of Great Britain and Northern Ireland
,
France
,
Germany (Federal Republic of)
,
Norway
|
|
2013-04-25 |
|
[ 230 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO E/S IN 29.5-30.0//19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7 - 20.2 GHz and 29.5 - 30.0 GHz
|
United Kingdom of Great Britain and Northern Ireland
,
France
,
Germany (Federal Republic of)
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
|
|
2013-04-25 |
|
[ 229 ]
|
Proposed changes to draft revision of Recommendation ITU-R S.1503-1
|
United Kingdom of Great Britain and Northern Ireland
|
|
2013-04-25 |
|
[ 228 ]
|
Working document towards draft CPM text on WRC-15 Agenda item 9.1.5
|
International Civil Aviation Organization
|
|
2013-04-25 |
|
[ 227 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UAS] - Technical and operational characteristics of typical satellite communication links for potential use by UA Control and non-payload communication (CNPC) Agenda Item 1.5 (WRC15)
|
Germany (Federal Republic of)
|
|
2013-04-25 |
|
[ 226 ]
|
Protection criterion for FSS in sharing studies related to Agenda item 1.5
|
Germany (Federal Republic of)
|
|
2013-04-25 |
|
[ 225 ]
|
Proposal for liaison statement to Working Party 5D and Joint Task Group 4-5-6-7 - Suitable frequency ranges for IMT above 6 GHz
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
|
2013-04-25 |
|
[ 224 ]
|
Proposal for liaison statement to ITU-R Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
|
2013-04-25 |
|
[ 223 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the GSO fixed-satellite service in Regions 2 and 3
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
|
2013-04-25 |
|
[ 222 ]
|
Working document on guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services
|
United States of America
|
|
2013-04-25 |
|
[ 221 ]
|
Working document on the guidelines that could be used by Administrations wishing to license airborne ESOMPs operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services
|
United States of America
|
|
2013-04-25 |
|
[ 220 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7-20.2 GHz and 29.5 - 30.0 GHz
|
United States of America
|
|
2013-04-25 |
|
[ 219 ]
|
Working document - Technical and operational studies towards the preparation of a preliminary draft new Report regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satellite orbit fixed-satellite service
|
United States of America
|
|
2013-04-25 |
|
[ 218 ]
|
Feasibility of FSS/AMS/Mobile sharing in the frequency band 14.5-15.35 GHz
|
United States of America
|
|
2013-04-25 |
|
[ 217 ]
|
Working document towards a preliminary draft new Report ITU-R S.[RES756] - Studies on possible reduction of the coordination arc and technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7
|
Canada
|
|
2013-04-24 |
|
[ 216 ]
|
Proposed elements for the Director's Report related to the experience in the application of the Radio Regulatory procedures and other relates matters - Review of the provisions associated with the use of the band 15.4-15.7 GHz by the FSS (Earth-to-space and space-to-Earth)
|
Canada
|
|
2013-04-24 |
|
[ 215 ]
|
Proposed modifications to the working document towards draft CPM text on WRC-15 Agenda item 1.7
|
Canada
|
|
2013-04-24 |
|
[ 214 ]
|
Sharing study between FS and FSS (space-to-Earth) in the band 7 150-7 250 MHz
|
France
|
|
2013-04-24 |
|
[ 213 ]
|
Sharing study between FSS (space-to-Earth) and SRS (Earth-to-space) in the band 7-8 GHz range
|
France
|
|
2013-04-24 |
|
[ 212 ]
|
Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range
|
France
|
|
2013-04-24 |
|
[ 211 ]
|
Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range
|
France
|
|
2013-04-24 |
|
[ 210 ]
|
Protection of SRS near-Earth missions in highly elliptical orbits (HEO) from proposed FSS (space-to-Earth) emissions in the band 7 190-7 235 MHz
|
France
|
|
2013-04-24 |
|
[ 209 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3
|
United States of America
|
|
2013-04-24 |
|
[ 208 ]
|
Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 Agenda Item 1.7
|
United States of America
|
|
2013-04-24 |
|
[ 207 ]
|
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - WRC Agenda item 1.5 WD PDNR [UAS-FSS] FSS assumptions and characteristics
|
United States of America
|
|
2013-04-24 |
Results:681 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):