Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 37 ]
|
Working document towards a revision of Recommendation ITU-R F.1777 - Digital system characteristics of television outside broadcast, electronic news gathering and electronic field production in the fixed service for use in sharing studies
|
Australia
|
225/9
|
2012-05-15 |
|
[ 36 ]
|
Agenda item 1.17 - Proposed liaison statement to Working Party 5B
|
United States of America
|
|
2012-05-14 |
|
[ 35 ]
|
Agenda item 1.15 - Proposed liaison statement to Working Party 5B
|
United States of America
|
|
2012-05-14 |
|
[ 34 ]
|
Agenda item 1.13 - Proposed liaison statement to Working Party 7B
|
United States of America
|
|
2012-05-14 |
|
[ 33 ]
|
Agenda item 1.12 - Proposed liaison statement to Working Party 7B
|
United States of America
|
|
2012-05-14 |
|
[ 32 ]
|
Agend item 1.11 - Proposed liaison statement to Working Party 7B
|
United States of America
|
|
2012-05-14 |
|
[ 31 ]
|
Agenda item 1.10 - Proposed liaison statement to Working Party 4C
|
United States of America
|
|
2012-05-14 |
|
[ 30 ]
|
Agenda item 1.9.2 - Proposed liaison statement to Working Party 4C
|
United States of America
|
|
2012-05-14 |
|
[ 29 ]
|
Agenda item 1.9.1 - Proposed liaison statement to Working Party 4A
|
United States of America
|
|
2012-05-14 |
|
[ 28 ]
|
Agenda item 1.8 - Proposed liaison statement to Working Party 4A
|
United States of America
|
|
2012-05-14 |
|
[ 27 ]
(Rev.1) |
Agenda item 1.6.2 - Proposed liaison statement to Working Party 4A
|
United States of America
|
|
2012-05-14 |
|
[ 26 ]
|
Agenda item 1.6.1 - Proposed liaison statement to Working Party 4A
|
United States of America
|
|
2012-05-14 |
|
[ 25 ]
|
Agenda item 1.4 - Proposed liaison statement to Working Party 5A
|
United States of America
|
|
2012-05-14 |
|
[ 24 ]
|
Proposed liaison statement to JTG 4-5-6-7 - Agenda item 1.1
|
United States of America
|
|
2012-05-14 |
|
[ 23 ]
|
Proposal for modification of working document towards a preliminary draft new Handbook ITU-R F.[CROSS-BORDER] - Guidance for bilateral/multilateral discussions on use frequency range 29.7 MHz-[43.5 GHz] by fixed/land mobile systems
|
Russian Federation
|
|
2012-05-12 |
|
[ 22 ]
|
Draft liaison statement to Working Party 7C - WRC-15 Agenda item 1.12 - Characteristics of and protection criteria for stations operating in the fixed service in the frequency bands 8 700-8 750 MHz and 10-10.5 GHz
|
France
,
Germany (Federal Republic of)
|
|
2012-05-11 |
|
[ 21 ]
|
Proposed modifications to preliminary draft revisions of Recommendations ITU-R F.1247-2, F.1249-2 AND F.1509-1
|
Japan
|
|
2012-05-11 |
|
[ 20 ]
|
Working document towards preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
Japan
|
|
2012-05-11 |
|
[ 19 ]
|
Applicability of the sectoral antenna pattern approximations in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz
|
Japan
|
|
2012-05-11 |
|
[ 18 ]
|
Proposals for updating of Recommendations ITU-R F.383-8, ITU-R F.635-6 and ITU-R F.1099-4
|
Japan
|
247/5
|
2012-05-11 |
|
[ 17 ]
|
Proposed suppression of certain F-series Recommendations
|
Japan
|
|
2012-05-11 |
|
[ 16 ]
|
Proposed suppression of Question ITU-R 245/5 on fixed service applications using frequency bands above 3 000 GHz
|
Japan
|
245/5
|
2012-05-11 |
|
[ 15 ]
|
Summary of results of the RA-12 and CPM15-1
|
Chairman, SG 5
|
|
2012-05-08 |
|
[ 14 ]
|
Attribution of the Study Group 5 texts to the Working Parties
|
Chairman, SG 5
|
|
2012-05-08 |
|
[ 13 ]
|
Future updating of the Recommendations and other ITU-R texts under joint responsibility of Study Groups 4 and 5
|
Chairmen, SGs 4 and 5
|
|
2012-05-08 |
|
[ 12 ]
|
Proposed draft liaison statement to Working Party 5A and Working Party 5B on vehicular collision avoidance radars and fixed services within the 71-86 GHz frequency range
|
Canada
|
|
2012-05-07 |
|
[ 11 ]
|
Proposed modifications for the preliminary draft revision of Recommendation ITU-R F.339-7 - Bandwidths, signal-to-noise ratios and fading allowances in HF fixed and land mobile radiocommunications systems
|
Canada
|
|
2012-05-07 |
|
[ 10 ]
|
Proposed modifications to preliminary draft new Report ITU-R F.[HF-NETWORK RELIABILITY] - Reliability calculations for adaptive HF fixed service network
|
Canada
|
|
2012-05-07 |
|
[ 9 ]
|
Liaison statement to ITU-T Study Groups 9 and 5 and to ITU-R Study Groups 1 and 5 for information - Coexistence of wired and wireless communications systems
|
WP 6A
|
|
2012-05-02 |
|
[ 8 ]
|
Progress report on Joint Correspondence Group activity
|
Chairman, JCG 5A/5C
|
|
2012-04-27 |
|
[ 7 ]
|
Recommendation ITU-R P.1817-1 to be brought to the attention of study groups 1 and 5
|
SG 3
|
|
2012-04-20 |
|
[ 6 ]
|
WRC Resolutions and Recommendations related to the work of Study Group 5
|
Chairman, SG 5
|
|
2012-04-03 |
|
[ 5 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1
|
Chairman, JTG 4-5-6-7
|
|
2012-03-26 |
|
[ 4 ]
|
Liaison statement to ITU-R Working Party 5C
|
ITU-D SG 2
|
|
2012-03-21 |
|
[ 3 ]
(Rev.1) |
List of Questions - Completion dates of studies to be updated editorially
|
Chairman, SG 5
|
|
2012-03-21 |
|
[ 2 ]
|
Liaison statement on draft Recommendation Y.energyMRM "Energy Measurement Reference Model"
|
ITU-T SG 13
|
|
2012-02-23 |
|
[ 1 ]
|
Documents to be carried over from the 2007-2011 study period
|
WP 5C
|
|
2012-01-26 |
Resultats:437 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):