Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 362 ]
(Rev.1) |
Updates to draft revised G.698.2 to include 800G application codes
|
Ciena Canada
|
Q6/15
|
2025-03-04 |
|
[ 361 ]
|
Thoughts on the intelligence transport network architecture
|
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2025-03-04 |
|
[ 360 ]
|
Considerations of fgMTN hitless bandwidth adjustment management requirements
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q14/15
|
2025-03-04 |
|
[ 359 ]
|
G.8275 Appendix XIII Security Editorial enhancements
|
Nokia Corporation (Finland)
|
Q13/15
|
2025-03-04 |
|
[ 358 ]
(Rev.1) |
G.781.1 Holdover terminology
|
Nokia Corporation (Finland)
,
Swisscom SA (Switzerland)
|
Q13/15
|
2025-03-04 |
|
[ 357 ]
|
G.Suppl68, G.781, G.781.1, alarm and event reporting
|
Nokia Corporation (Finland)
|
Q13/15
|
2025-03-04 |
|
[ 356 ]
|
Draft new ITU-T Recommendation on establishing network resilience centers before occurring disasters nationally and regionally
|
Iran (Islamic Republic of)
|
Q7/15
|
2025-03-04 |
|
[ 355 ]
|
G.8275.1 PRTC-B OffsetScaledLogVariance value
|
Nokia Corporation (Finland)
|
Q13/15
|
2025-03-04 |
|
[ 354 ]
|
New work item proposal of Beyond 1T Flexible OTN short reach interfaces
|
Algérie Télécom SPA (Algeria)
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-03-04 |
|
[ 353 ]
|
Considerations on B1T network architecture
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 352 ]
|
G.8275.2 Time Transmitter Enhancement
|
Nokia Corporation (Finland)
|
Q13/15
|
2025-03-04 |
|
[ 351 ]
|
Considerations on B1T network requirements
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 350 ]
|
Time Synchronization Use Cases for Data centers
|
Calnex Solutions plc. (United Kingdom)
,
Meta Platforms, Inc. (United States)
,
Nvidia (Israel)
|
Q13/15
|
2025-03-04 |
|
[ 349 ]
|
B1T NewP path multiplexing to section
|
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 348 ]
|
Client mapping and multiplexing to B1T NewP path layer
|
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 347 ]
|
Consideration on B1T OTN
|
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 346 ]
|
Considerations on G.798 splitting
|
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 345 ]
|
G.uvs-XR: Proposed revisions, clarifications and supplements on draft for Consent
|
China Unicom
|
Q3/15
|
2025-03-04 |
|
[ 344 ]
|
Analyzing AI for home networking:challenges,opportunities, and possible way
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2025-03-04 |
|
[ 343 ]
|
G.Sup.Edge4home:Item tracking enabled by enhanced on-premise device
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2025-03-04 |
|
[ 342 ]
|
G.Sup.TwinHome:Proposal on use cases enabled by digital twin technologies
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2025-03-04 |
|
[ 341 ]
|
Considerations on dumb resource management capabilities of MCS
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q12/15
|
2025-03-04 |
|
[ 340 ]
|
Reuse G.8275.1 PTP over Ethernet profile as baseline of a PTP profile for Data Centers
Reuse G.8275.1 PTP over Ethernet profile as baseline of a PTP profile for Data Centers
|
Nvidia (Israel)
|
Q13/15
|
2025-03-04 |
|
[ 339 ]
|
Proposal on outline and network requirements for MTN technical paper
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 338 ]
|
Consideration on data hierarchical processing for the integrated sensing and communication system of optical network
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q6/15, Q12/15
|
2025-03-04 |
|
[ 337 ]
|
Proposal on MTN applications for MTN technical paper
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 336 ]
|
Considerations on Improving Optical Network Operation and Maintenance Efficiency by Introducing AI
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q6/15, Q14/15, Q12/15
|
2025-03-04 |
|
[ 335 ]
|
Proposal on the new work item of fgMTN DNI protection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
State Grid Corporation of China
,
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 334 ]
|
Discussion on the study on satellite free-space optical transport networks
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q12/15
|
2025-03-04 |
|
[ 333 ]
|
Consider improving the robustness for optical network by combining electrical layer performance with optical layer switching
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 332 ]
|
Analysis of the impact of IMT-2030 on transport networks and the initial thought of IOT-2030 transport
|
China Mobile Communications Co. Ltd.
|
Q6/15, Q12/15, Q11/15
|
2025-03-04 |
|
[ 331 ]
(Rev.1) |
VC-12 over fgMTNP mapping consideration
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-03-04 |
|
[ 330 ]
|
Proposal for revision of ITU-T L.107
|
China Information Communication Technologies Group
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2025-03-04 |
|
[ 329 ]
|
Proposal of revision to Recommendation L.361
|
China Information Communication Technologies Group
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q7/15
|
2025-03-04 |
|
[ 328 ]
|
Update to section 8 of G.wmci draft
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q3/15
|
2025-03-04 |
|
[ 327 ]
|
Proposals on adding SyncE interfaces for ePRC in G.811.1 and G.8272.1
|
China Information Communication Technologies Group
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2025-03-04 |
|
[ 326 ]
|
Some text modification suggestions for G.781.1
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2025-03-04 |
|
[ 325 ]
|
Proposal of updating Clause 8 and 9 in G.7716
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q14/15
|
2025-03-04 |
|
[ 324 ]
|
Discussion on the existence form and location of data collection and processing
|
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2025-03-04 |
|
[ 323 ]
|
Application of LLMs in transport network management and control
|
China Information Communication Technologies Group
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2025-03-04 |
|
[ 322 ]
|
Consideration of new requirements on reliability and availability of fiber optic systems for AI applications
|
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2025-03-04 |
|
[ 321 ]
|
Considerations on G.8264 and G.781
|
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q13/15
|
2025-03-04 |
|
[ 320 ]
|
G.9804.3 : required margin for ROSA receiver sensitivity in PON system
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2025-03-04 |
|
[ 319 ]
|
T-BCs with different classes of interfaces (G.8273.2)
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-03-04 |
|
[ 318 ]
|
G.9804.3 : 50Gb/s C+ symmetric ONU cost analysis
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2025-03-04 |
|
[ 317 ]
|
Ideas about synchronization network resiliency [G.8274]
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-03-04 |
|
[ 316 ]
|
Frame size of ESMC message [G.8264]
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-03-04 |
|
[ 315 ]
|
G.9804 Deprecation 12.5G upstream line rate in HSP
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2025-03-04 |
|
[ 314 ]
|
Text proposal for G.Sup.DCSync
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-03-04 |
|
[ 313 ]
|
Posted as TD53/WP1
|
N/A (no se aplica)
|
Q3/15
|
2025-03-04 |
Resultados :761 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):