Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP4A : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R R23-WP4A  C 

UIT-R R23-WP4A

Utilización Eficaz de la Orbita y del Espectro para el SFS y el SRS

Resultados :588 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 188 ]  
 
Proposed topic to be considered under WRC-23 agenda item 7 - To develop possible regulatory measures to implement RR No. 4.4     China   AI7   2024-09-27
[ 187 ]  
 
Draft contribution to Working Party 4A on WRC-27 agenda item 1.6     China   AI1.6   2024-09-27
[ 186 ]  
 
Technical and operational characteristics of non-geostationary-satellite orbit systems in the fixed satellite service (Earth-to-space) for studies to be conducted under WRC-27 agenda item 1.3     China   AI1.13   2024-09-27
[ 185 ]  
 
Accounting for all sidelobe contributions of non-GSO FSS satellites in Recommendation ITU-R S.1503 - Studies on Sidelobe Interference     Galaxy Space (Beijing) Communication Technology Co., Ltd.     2024-09-27
[ 184 ]  
 
Working document towards a preliminary draft Revision to Report ITU-R BO.2029 Broadcasting-satellite service earth station antenna pattern measurements and related analyses     Japan     2024-09-26
[ 183 ]  
 
Application of Recommendation ITU-R S.1323 to the GSO/FSS links which employ the ACM techniques in the 14/12/11 GHz bands where the RR Article 22 epfd limits apply     Japan     2024-09-26
[ 182 ]  
 
Proposal to update working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies     Japan     2024-09-26
[ 181 ]  
 
Views on the proposal to be promoted as a topic considered under WRC-27 agenda item 7 - Possible measures to enhance protection and sustainable development of broadcasting-satellite service (BSS) in Regions 1 and 3 Plan band by addressing the significant discrepancies between service area and coverage area of networks operating as Region 2 fixed-satellite service (FSS)...     Japan   AI7   2024-09-26
[ 180 ]  
 
Working document towards a preliminary draft Revision of Recommendation ITU-R BO.1443-3 - Reference BSS earth station antenna patterns for use in interference assessment involving non-GSO satellites in frequency bands covered by RR Appendix 30     Japan     2024-09-26
[ 179 ]  
 
Revisions for elements of working document on WRC-27 agenda item 1.4     Japan   AI1.4   2024-09-26
[ 178 ]  
 
Revisions for elements for a working document towards draft CPM text for WRC-27 agenda item 1.4     Japan   AI1.4   2024-09-26
[ 177 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C,and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8     WP 7D   AI1.8   2024-09-27
[ 176 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1     WP 7D   AI1.1   2024-09-27
[ 175 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13     WP 7D   AI1.13, AI1.12   2024-09-27
[ 174 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11     WP 7D   AI1.11   2024-09-27
[ 173 ]  
 
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to limit the practice of introducing a completely different orbital plane for non-geostationary-satellite systems that is not foreseen to be required for operation of the constellation     Korea (Rep. of)   AI7   2024-09-26
[ 172 ]  
 
Proposed topic to be considered under WRC-27 agenda item 7 - Establishment of appropriate technical criteria for coordination procedure for specific earth station with respect to terrestrial services under RR No. 9.21     Korea (Rep. of)   AI7   2024-09-26
[ 171 ]  
 
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time and clarification of the requirement of capability in No. 11.44B of the Radio Regulations     Korea (Rep. of)   AI7   2024-09-26
[ 170 ]  
 
Committee on the peaceful uses of outer space: 2024 - Sixty-seventh session (19-28 June 2024) - Space sustainability issues     Brazil     2024-09-26
[ 169 ]  
 
Additional transparency measures and views for a WRC-27 agenda item 7 topic on RR No. 4.4     Brazil   AI7   2024-09-26
[ 168 ]  
 
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time     Australia   AI7   2024-09-26
[ 167 ]  
 
Material for the reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7     Australia   AI1.7   2024-09-26
[ 166 ]  
 
Proposed revisions to working document on WRC-27 agenda item 1.5 - Studies of the regulatory measures, and implementability thereof, to limit the unauthorized operations of the earth stations of the non-GSO in the FSS and MSS and associated issues related to the service area of non-GSO in the FSS and MSS satellite systems     Kazakhstan   AI1.5   2024-09-26
[ 165 ]  
 
Proposed working document towards draft CPM text for WRC-27 agenda item 1.5     Kazakhstan   AI1.5   2024-09-26
[ 164 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications     WP 7A   AI1.15   2024-09-23
[ 163 ]  
 
Liaison statement to Working Party 4A regarding WRC-27 agenda item 1.6     WP 7C   AI1.6   2024-09-23
[ 162 ]  
 
Reply liaison statement to Working Party 4A regarding WRC-27 agenda item 1.1 (copy to the CPM Chair)     WP 7B   AI1.1   2024-09-23
[ 161 ]  
 
Studies on development of regulatory measures to limit the unauthorized operations of non-geostationary-satellite orbit (non-GSO) Earth stations in the fixed-satellite service (FSS) and mobile-satellite service (MSS) and associated issues related to the service area of non-GSO FSS and MSS satellite systems     IAFI     2024-09-20
[ 160 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, 5C, 7B and 7C for information) - Information regarding the standard frequency and time signal-satellite service for WRC-27 agenda item 1.2 on smaller antenna sizes for FSS uplinks at 14 GHz     WP 7A   AI1.2   2024-09-20
[ 159 ]  
 
ITU-R Handbook on satellite communications     Editor of Satellite Communications Handbook     2024-09-05
[ 158 ]  
 
Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     ITU-T SG3     2024-07-19
[ 157 ]  
 
Reply liaison statement to Working Party 4A - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]     WP 5D     2024-07-16
[ 156 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 155 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7     WP 5D   AI1.7   2024-07-08
[ 154 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17     WPs 3L and 3M   AI1.17   2024-06-12
[ 153 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1     WP 3M   AI1.1   2024-06-12
[ 152 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 7A, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2     WP 3M   AI1.2   2024-06-12
[ 151 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C, 6B and 7C for information) - WRC-27 agenda item 1.4     WP 3M   AI1.4   2024-06-12
[ 150 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14     WPs 3L and 3M   AI1.14, AI1.13, AI1.12, AI1.11   2024-06-12
[ 149 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3     WP 3M   AI1.3   2024-06-12
[ 148 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Propagation information to support studies in preparation for WRC-27 agenda item 1.8     WPs 3J, 3K and 3M   AI1.8   2024-06-12
[ 147 ]  
 
Reply liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Propagation aspects related to WRC-27 agenda item 1.18     WPs 3J and 3M   AI1.18   2024-06-12
[ 146 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - WRC-27 agenda item 1.19     WPs 3J and 3M   AI1.19   2024-06-12
[ 145 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 3J   AI1.15   2024-06-12
[ 144 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WPs 3J and 3M   AI1.10   2024-06-11
[ 143 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     WPs 3K and 3M   AI1.7   2024-06-10
[ 142 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16     WPs 3J and 3M   AI1.16   2024-06-10
[ 141 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15     WP 5C   AI1.15   2024-05-29
[ 140 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13     WP 5C   AI1.13   2024-05-29
[ 139 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7     WP 5C   AI1.7   2024-05-29
Resultados :588 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2025-07-10