Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 188 ]
|
Proposed topic to be considered under WRC-23 agenda item 7 - To develop possible regulatory measures to implement RR No. 4.4
|
China
|
AI7
|
2024-09-27 |
|
[ 187 ]
|
Draft contribution to Working Party 4A on WRC-27 agenda item 1.6
|
China
|
AI1.6
|
2024-09-27 |
|
[ 186 ]
|
Technical and operational characteristics of non-geostationary-satellite orbit systems in the fixed satellite service (Earth-to-space) for studies to be conducted under WRC-27 agenda item 1.3
|
China
|
AI1.13
|
2024-09-27 |
|
[ 185 ]
|
Accounting for all sidelobe contributions of non-GSO FSS satellites in Recommendation ITU-R S.1503 - Studies on Sidelobe Interference
|
Galaxy Space (Beijing) Communication Technology Co., Ltd.
|
|
2024-09-27 |
|
[ 184 ]
|
Working document towards a preliminary draft Revision to Report ITU-R BO.2029 Broadcasting-satellite service earth station antenna pattern measurements and related analyses
|
Japan
|
|
2024-09-26 |
|
[ 183 ]
|
Application of Recommendation ITU-R S.1323 to the GSO/FSS links which employ the ACM techniques in the 14/12/11 GHz bands where the RR Article 22 epfd limits apply
|
Japan
|
|
2024-09-26 |
|
[ 182 ]
|
Proposal to update working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies
|
Japan
|
|
2024-09-26 |
|
[ 181 ]
|
Views on the proposal to be promoted as a topic considered under WRC-27 agenda item 7 - Possible measures to enhance protection and sustainable development of broadcasting-satellite service (BSS) in Regions 1 and 3 Plan band by addressing the significant discrepancies between service area and coverage area of networks operating as Region 2 fixed-satellite service (FSS)...
|
Japan
|
AI7
|
2024-09-26 |
|
[ 180 ]
|
Working document towards a preliminary draft Revision of Recommendation ITU-R BO.1443-3 - Reference BSS earth station antenna patterns for use in interference assessment involving non-GSO satellites in frequency bands covered by RR Appendix 30
|
Japan
|
|
2024-09-26 |
|
[ 179 ]
|
Revisions for elements of working document on WRC-27 agenda item 1.4
|
Japan
|
AI1.4
|
2024-09-26 |
|
[ 178 ]
|
Revisions for elements for a working document towards draft CPM text for WRC-27 agenda item 1.4
|
Japan
|
AI1.4
|
2024-09-26 |
|
[ 177 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C,and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
|
WP 7D
|
AI1.8
|
2024-09-27 |
|
[ 176 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1
|
WP 7D
|
AI1.1
|
2024-09-27 |
|
[ 175 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13
|
WP 7D
|
AI1.13, AI1.12
|
2024-09-27 |
|
[ 174 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11
|
WP 7D
|
AI1.11
|
2024-09-27 |
|
[ 173 ]
|
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to limit the practice of introducing a completely different orbital plane for non-geostationary-satellite systems that is not foreseen to be required for operation of the constellation
|
Korea (Rep. of)
|
AI7
|
2024-09-26 |
|
[ 172 ]
|
Proposed topic to be considered under WRC-27 agenda item 7 - Establishment of appropriate technical criteria for coordination procedure for specific earth station with respect to terrestrial services under RR No. 9.21
|
Korea (Rep. of)
|
AI7
|
2024-09-26 |
|
[ 171 ]
|
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time and clarification of the requirement of capability in No. 11.44B of the Radio Regulations
|
Korea (Rep. of)
|
AI7
|
2024-09-26 |
|
[ 170 ]
|
Committee on the peaceful uses of outer space: 2024 - Sixty-seventh session (19-28 June 2024) - Space sustainability issues
|
Brazil
|
|
2024-09-26 |
|
[ 169 ]
|
Additional transparency measures and views for a WRC-27 agenda item 7 topic on RR No. 4.4
|
Brazil
|
AI7
|
2024-09-26 |
|
[ 168 ]
|
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time
|
Australia
|
AI7
|
2024-09-26 |
|
[ 167 ]
|
Material for the reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
Australia
|
AI1.7
|
2024-09-26 |
|
[ 166 ]
|
Proposed revisions to working document on WRC-27 agenda item 1.5 - Studies of the regulatory measures, and implementability thereof, to limit the unauthorized operations of the earth stations of the non-GSO in the FSS and MSS and associated issues related to the service area of non-GSO in the FSS and MSS satellite systems
|
Kazakhstan
|
AI1.5
|
2024-09-26 |
|
[ 165 ]
|
Proposed working document towards draft CPM text for WRC-27 agenda item 1.5
|
Kazakhstan
|
AI1.5
|
2024-09-26 |
|
[ 164 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications
|
WP 7A
|
AI1.15
|
2024-09-23 |
|
[ 163 ]
|
Liaison statement to Working Party 4A regarding WRC-27 agenda item 1.6
|
WP 7C
|
AI1.6
|
2024-09-23 |
|
[ 162 ]
|
Reply liaison statement to Working Party 4A regarding WRC-27 agenda item 1.1 (copy to the CPM Chair)
|
WP 7B
|
AI1.1
|
2024-09-23 |
|
[ 161 ]
|
Studies on development of regulatory measures to limit the unauthorized operations of non-geostationary-satellite orbit (non-GSO) Earth stations in the fixed-satellite service (FSS) and mobile-satellite service (MSS) and associated issues related to the service area of non-GSO FSS and MSS satellite systems
|
IAFI
|
|
2024-09-20 |
|
[ 160 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, 5C, 7B and 7C for information) - Information regarding the standard frequency and time signal-satellite service for WRC-27 agenda item 1.2 on smaller antenna sizes for FSS uplinks at 14 GHz
|
WP 7A
|
AI1.2
|
2024-09-20 |
|
[ 159 ]
|
ITU-R Handbook on satellite communications
|
Editor of Satellite Communications Handbook
|
|
2024-09-05 |
|
[ 158 ]
|
Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators
|
ITU-T SG3
|
|
2024-07-19 |
|
[ 157 ]
|
Reply liaison statement to Working Party 4A - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
|
WP 5D
|
|
2024-07-16 |
|
[ 156 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-27
|
Chair, CPM-27
|
|
2024-07-09 |
|
[ 155 ]
|
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7
|
WP 5D
|
AI1.7
|
2024-07-08 |
|
[ 154 ]
|
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17
|
WPs 3L and 3M
|
AI1.17
|
2024-06-12 |
|
[ 153 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 3M
|
AI1.1
|
2024-06-12 |
|
[ 152 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 7A, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 3M
|
AI1.2
|
2024-06-12 |
|
[ 151 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C, 6B and 7C for information) - WRC-27 agenda item 1.4
|
WP 3M
|
AI1.4
|
2024-06-12 |
|
[ 150 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
|
WPs 3L and 3M
|
AI1.14, AI1.13, AI1.12, AI1.11
|
2024-06-12 |
|
[ 149 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-27 agenda item 1.3
|
WP 3M
|
AI1.3
|
2024-06-12 |
|
[ 148 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4C, 5A, 5C, 7C and 7D for information) - Propagation information to support studies in preparation
for WRC-27 agenda item 1.8
|
WPs 3J, 3K and 3M
|
AI1.8
|
2024-06-12 |
|
[ 147 ]
|
Reply liaison statement to Working Parties 7C and 7D (copy to Working Parties 4A, 4C, 5A, 5B and 5C for information) - Propagation aspects related to WRC-27 agenda item 1.18
|
WPs 3J and 3M
|
AI1.18
|
2024-06-12 |
|
[ 146 ]
|
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 5A, 5B, 5C, 5D and 7B for information) - WRC-27 agenda item 1.19
|
WPs 3J and 3M
|
AI1.19
|
2024-06-12 |
|
[ 145 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2024-06-12 |
|
[ 144 ]
|
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
|
WPs 3J and 3M
|
AI1.10
|
2024-06-11 |
|
[ 143 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WPs 3K and 3M
|
AI1.7
|
2024-06-10 |
|
[ 142 ]
|
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16
|
WPs 3J and 3M
|
AI1.16
|
2024-06-10 |
|
[ 141 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
|
WP 5C
|
AI1.15
|
2024-05-29 |
|
[ 140 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13
|
WP 5C
|
AI1.13
|
2024-05-29 |
|
[ 139 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7
|
WP 5C
|
AI1.7
|
2024-05-29 |
Resultados :588 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):