International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP-6A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP-6A  C 

ITU-R WP-6A

Terrestrial Broadcasting Delivery

Results:485 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 85 ]  
 
Proposed revisions to the main body of Report ITU-R BT.2302     European Broadcasting Union     2020-09-28
[ 84 ]  
 
Preliminary draft revision of Report ITU-R BS.2384-1 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting     China (People's Republic of)     2020-09-29
[ 83 ]  
 
Preliminary draft revision of Report ITU-R BT.2295-3 - Digital terrestrial broadcasting systems     China (People's Republic of)     2020-09-29
[ 82 ]  
 
Collection of field trials of UHDTV over DTT networks     France     2020-09-28
[ 81 ]  
 
Revision of Report ITU-R BT.2301-2 - National field reports on the introduction of IMT in the bands with co-primary allocation to the broadcasting and the mobile services     France     2020-09-28
[ 80 ]  
 
Preliminary draft revision of Recommendation ITU-R BS.1615 - "Planning parameters" for digital sound broadcasting at frequencies below 30 MHz     United States of America     2020-09-25
[ 79 ]  
 
Information Document: An ATSC 3.0 Broadcast 5G Heterogeneous Network     United States of America     2020-09-25
[ 78 ]  
 
Input on the proposed revision of Report ITU-R BT 2344-2 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting     United States of America     2020-09-25
[ 77 ]  
(Rev.1) 
Report of Correspondence Group on activities between February and September 2020     CG of WP 6A on Rev. Rep. ITU-R BS.2384 and BT.2140     2020-09-23
[ 76 ]  
 
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range     WP 7D     2020-09-21
[ 75 ]  
(Rev.1) 
Report of activities in Correspondence Group     Chairman, CG on Rep./Rec. ITU-R BT.[INTRO-NEWTECH]     2020-09-21
[ 74 ]  
 
Progress Report WRC-23 agenda items 1.4, 1.9, 1.12, and 9.1, topics a) and c)     RG for WRC-23 related AIs   AI9.1C), AI9.1A), AI1.9, AI1.4, AI1.12   2020-09-18
[ 73 ]  
+Ann.1-5 
Report of Rapporteur Group on activities between February and September 2020     RG on MonteCarloDTT     2020-09-18
[ 72 ]  
 
[Working document towards a ] Preliminary draft revision to Report ITU-R BT.2467 - Methods for the evaluation of the quality of service of second generation DTTB systems     Free TV Australia Ltd.   Q132/6   2020-09-16
[ 71 ]  
+Ann.2-4 
Report of Rapporteur Group on activities between February and September 2020     RG on WRC-23 AI 1.5   AI1.5   2020-09-16
[ 70 ]  
 
Interim Report on Liaison with CISPR on Protection Requirements for the Broadcasting Service     WP 6A Rapporteur     2020-09-08
[ 69 ]  
 
Initial reply liaison statement to Working Party 5D (copied to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4     WPs 3J, 3K & 3M   AI1.4   2020-08-27
[ 68 ]  
 
Reply liaison statement to Working Party 5B (copied to Working Parties 5A, 5C, 6A and ICAO for information) - WRC-23 agenda item 1.9 - Review of Appendix 27 of the Radio Regulations to accommodate digital aeronautical HF technologies     WP 3L   AI1.9   2020-08-27
[ 67 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A - Recommendation ITU-R P.368-9 - Software implementations of ground-wave propagation predictions - GRWAVE and LFMF-SmoothEarth     WP 3L     2020-08-27
[ 66 ]  
 
Liaison statement to Task Group 6/1 (copied to Working Parties 5A, 5B, 5C, 5D and 6A for information) - WRC-23 agenda item 1.5 - Organisation of work of Working Parties 3K and 3M to support Task Group 6/1     WPs 3K & 3M   AI1.5   2020-08-25
[ 65 ]  
 
Liaison statement on new Recommendation ITU-T Y.3531 - Cloud computing functional requirements for machine learning as a service     ITU-T SG13     2020-08-17
[ 64 ]  
 
Liaison statement on invitation to review artificial intelligence standardization roadmap and provide missing or updated information     ITU-T SG13     2020-08-17
[ 63 ]  
 
Brazilian next generation digital terrestrial television (Information Document)     Brazil (Federative Republic of)     2020-08-10
[ 62 ]  
 
Reply liaison statement to Working Party 5D (copied for information to Working Parties 4A, 4C, 5A, 5B, 6A, 7B, 7C and 7D) - WRC-23 agenda item 1.4     WP 5C   AI1.4   2020-08-07
[ 61 ]  
 
Liaison statement to Working Parties 7C (copied to Working Parties 5C and 6A for information) - Preparations for studies under WRC-23 agenda item 1,12     WP 5A   AI1.12   2020-08-06
[ 60 ]  
 
Reply liaison statement to Working Party 7C (copied for information to Working Parties 5A and 6A) - WRC-23 agenda item 1.12     WP 5C   AI1.12   2020-08-06
[ 59 ]  
 
Liaison statement to Working Parties 3L, 3M, 5A, 5C, 6A and ICAO - WRC-23 agenda item 1,9 - Review of Appendix 27 of the Radio Regulations to accommodate digital aeronautical HF technologies     WP 5B   AI1.9   2020-08-06
[ 58 ]  
 
Liaison statement on versatile video coding (VVC)     ITU-T SG16     2020-07-23
[ 57 ]  
 
Liaison statement to ITU-R Study Group 6 - Terms and definitions proposed by ITU-T Study Group 16     CCT     2020-07-21
[ 56 ]  
 
Liaison statement to ITU-R Study Group 6 (copy to ITU-T Study Groups 9 and 12) - Proposal to add the broadcasting term "Quasi error free" to the ITU Terminology Database     CCT     2020-07-21
[ 55 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chairman, CCV     2020-07-14
[ 54 ]  
 
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 -SG2RGQ/200)     ITU-T SG5     2020-07-13
[ 53 ]  
 
Reply liaison statement on EMF exposure form bonded cellular devices     ITU-T SG5     2020-06-29
[ 52 ]  
 
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups     Director, BR     2020-06-25
[ 51 ]  
 
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan     ITU-T SG9     2020-05-27
[ 50 ]  
 
Liaison statement from SC 29/WG11 to ITU-R Working Party 6B on versatile video coding [SC 29/WG 11N 19205]     International Organization for Standardization     2020-05-15
[ 49 ]  
 
Liaison response from CISPR/H to Working Party 6A on their proposal for changes in the radioservices database of IEC     International Special Committee on Radio Interference     2020-05-07
[ 48 ]  
(Rev.1) 
Liaison statement to Working Parties 5A, 5B, 5C and 6A - Preparations for studies under WRC-23 agenda item 1.12     WP 7C   AI1.12   2020-04-30
[ 47 ]  
 
Input to Working Parties 1C and 3L and to Correspondence Group 3L-7 (copied for information only to Working Parties 1A and 6A) - Revision of Recommendation ITU-R P.372 to take account of man-made noise indoors     European Broadcasting Union     2020-04-16
[ 46 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4     WP 5D   AI1.4   2020-03-06
[ 45 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Party 6A) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]     WP 5D     2020-03-06
[ 44 ]  
 
Liaison statement on information WTSA-20 preparation     ITU-T SG5     2020-02-24
[ 43 ]  
 
Liaison on the new version of the Home Network Transport (HNT) standards overview and work plan     ITU-T SG15     2020-02-19
[ 42 ]  
+Ann.1-19 
Report of the meeting of Working Party 6A (Geneva, 4-12 February 2020)     Chairman, WP 6A     2020-02-12
[ 41 ]  
 
Final List of Participants - Working Party 6A (Geneva, 4-12 February 2020)     Director, BR     2020-02-12
[ 40 ]  
 
Liaison statement from Study Group 6 to ITU-T Study Group 13 (To be considered by Working Party 6A and consolidated by WP 6B for SG 6) - Review of Artificial Intelligence Standardization Roadmap and provide missing or updated information     WP 6C     2020-02-07
[ 39 ]  
 
Proposed text for liaison statements via Study Group 6 - Liaisons to ITU-T FG-AI4EE and to ITU-T TSAG and ITU-D TDAG     Chairman, WP 6C     2020-02-05
[ 38 ]  
 
List of documents issued (Documents 6A/1 - 6A/38)     BR, Study Groups Department     2020-02-03
[ 37 ]  
(Rev.1) 
Update to Working Party 6A (February 2020)     RG on RF Hazard     2020-02-03
[ 36 ]  
(Rev.2) 
Proposed organization of the work of Study Group 6     Chairman, SG 6     2020-01-29
Results:485 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-03-13