Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 54 ]
|
Submission of rain statistics for DBSG-3
|
United Kingdom of Great Britain and Northern Ireland
|
|
2020-08-01 |
|
[ 53 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R P.1409-1 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater then about 1 GHz
|
Russian Federation
|
Q233/3
|
2020-07-31 |
|
[ 52 ]
|
Revision of Section 5 of preliminary draft rrevision to Recommendation ITU-R P.452-16 - Prediction procedure for the evaluation of interference between stations on the surface of the Earth at frequencies above about 0.1 GHz
|
Russian Federation
|
|
2020-07-31 |
|
[ 51 ]
|
DBSG3 Table I-2 line-of-sight average year worst-month multipath fading and enhancement - Proposed new Australian data and updates to existing records
|
Australia
|
|
2020-07-31 |
|
[ 50 ]
|
Contributions to the propagation databanks: Path length turbulence statistics for goldstone, CA (Apollo site) Canberra, Australia; Madrid, Spain; and Kennedy Space Center, Florida
|
United States of America
|
|
2020-07-29 |
|
[ 49 ]
|
Discussion document regarding Recommendation ITU-R P.453-14 - The radio refractive index its formula and refractivity data - Vertical refractive gradient
|
United States of America
|
|
2020-07-29 |
|
[ 48 ]
|
Discussion document regarding Recommendation ITU-R P.2109-1 - Analysis of building entry loss model from Recommendation ITU-R P.2109-1
|
United States of America
|
|
2020-07-29 |
|
[ 47 ]
(Rev.1) |
Discussion document regarding Recommendation ITU-R P.835-6 - Reference standard atmospheres - Review of software digital data products
|
United States of America
|
|
2020-07-29 |
|
[ 46 ]
|
Proposed integration of Table 2 of Recommendation ITU-R P.1144-10 and the SG 3 software WEB page
|
United States of America
|
|
2020-07-29 |
|
[ 45 ]
|
Review of software digital data products
|
United States of America
|
|
2020-07-29 |
|
[ 44 ]
|
Proposed revision of the Earth-to-space clutter loss model of Recommendation ITU-R P.2108
|
Telefon AB - LM Ericsson
,
Ericsson Canada, Inc.
|
|
2020-07-29 |
|
[ 43 ]
|
Proposed correction/update of the terrestrial clutter loss model of Recommendation ITU-R P.2108
|
Telefon AB - LM Ericsson
,
Ericsson Canada, Inc.
,
Nokia Corporation
|
|
2020-07-29 |
|
[ 42 ]
|
Update of MATLAB/Octave implementation of Recommendation ITU-R P.1812
|
Switzerland (Confederation of)
,
LS telcom AG
,
ORANGE POLSKA S.A
|
|
2020-07-29 |
|
[ 41 ]
|
Correspondence Group 3J-3M-13 validation examples Report of activities (2019-2020)
|
Chairman, CG 3J-3M-13
|
|
2020-07-30 |
|
[ 40 ]
|
Update of MATLAB/Octave implementation of Recommendation ITU-R P.2001
|
Switzerland (Confederation of)
|
|
2020-07-28 |
|
[ 39 ]
|
Update of MATLAB/Octave implementation of Recommendation ITU-R P.452
|
Switzerland (Confederation of)
,
LS telcom AG
|
|
2020-07-28 |
|
[ 38 ]
|
Update of MATLAB/Octave implementation of Recommendation ITU-R P.1546
|
Switzerland (Confederation of)
,
LS telcom AG
,
ORANGE POLSKA S.A.
|
|
2020-07-28 |
|
[ 37 ]
|
Proposed revision of Report ITU-R P.2346-3 - Building entry loss measurements for heavy industry factory at 3-40 GHz
|
Korea (Republic of)
|
|
2020-07-28 |
|
[ 36 ]
|
Proposed revision to a working document towards a preliminary draft new Report ITU-R P.[CLUTTER]-0 - CLUTTER loss measurement for the slant path at 3 and 24 GHz in suburban
|
Korea (Republic of)
|
|
2020-07-28 |
|
[ 35 ]
|
Proposed revision to Recommendation ITU-R P.2040-1 - The measurement of electrical properties of building materials
|
Korea (Republic of)
|
|
2020-07-28 |
|
[ 34 ]
|
Discussion document on a basic transmission loss model considering atmospheric duct from measurements campaign at 738 and 2 580 MHz on the south coast of Korea
|
Korea (Republic of)
|
|
2020-07-28 |
|
[ 33 ]
|
Contribution to ITU-R Study Group 3 databanks - Table IV-4 - Statistics of mean surface refractivity
|
Korea (Republic of)
|
|
2020-07-28 |
|
[ 32 ]
|
Discussion document - Clutter loss measurement for the slant path at 4, 18, 24 and 33 GHz in an urban environment
|
Korea (Republic of)
|
|
2020-07-28 |
|
[ 31 ]
|
Discussion document on the sum of building entry loss and clutter loss
|
Korea (Republic of)
|
|
2020-07-28 |
|
[ 30 ]
|
Proposed revision to Report ITU-R P.2346-3 - Effects of the clutter behind the building on the BEL over a NLoS path
|
Korea (Republic of)
|
|
2020-07-28 |
|
[ 29 ]
|
Report on the activities of Correspondence Group 3J-3K-3M-14 - Issues relating to HAPS propagation model
|
Chairman, CG 3J-3K-3M-14
|
|
2020-07-24 |
|
[ 28 ]
|
New sample implementations of the prediction method of outage probability due to rain attenuation with site diversity in Recommendation ITU-R P.618-13
|
Luxembourg
|
|
2020-07-23 |
|
[ 27 ]
|
A proposal for the replacement of low-quality figures in Recommendation ITU-R P.453-14 and associated readme file to accompany the recommendation
|
Luxembourg
|
|
2020-07-23 |
|
[ 26 ]
|
Working document towards a preliminary draft revision to Recommendation ITU-R P.840-8
|
France
|
|
2020-07-23 |
|
[ 25 ]
|
Working document towards a preliminary draft revision to Recommendation ITU-R P.676-12
|
France
|
|
2020-07-23 |
|
[ 24 ]
|
Report on activities of the Correspondence Group - Building entry loss
|
CG 3J-3K-3M-8
|
|
2020-07-23 |
|
[ 23 ]
|
Correspondence Group 3K-3M-12 Activity Report
|
Rapporteur, CG 3K-3M-12
|
|
2020-07-23 |
|
[ 22 ]
|
Liaison statement to ITU-R Study Group 3 - Recommendation ITU-R P.341-7 - The concept of transmission loss for radio links
|
CCT
|
|
2020-07-21 |
|
[ 21 ]
|
Activity Report of the Correspondence Group 3M-4 - Software products, digital maps and reference numerical data products
|
CG 3M-4
|
|
2020-07-15 |
|
[ 20 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
|
Chairman, CCV
|
|
2020-07-14 |
|
[ 19 ]
|
Working document towards a preliminary draft revision to Annex 3 of Recommendation ITU-R P.835-6
|
CG 3J-11
|
|
2020-07-13 |
|
[ 18 ]
|
Liaison statement to ITU-R Working Parties 3J, 3K and 3M on propagation issues in the range of 116-260 GHz
|
Switzerland (Confederation of)
|
|
2020-07-08 |
|
[ 17 ]
|
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups
|
Director, BR
|
|
2020-06-25 |
|
[ 16 ]
|
Liaison statement to Working Parties 5A, 5B, 5C, 7B (copy for information to Working Party 3M) - WRC-23 agenda item 1.19
|
WP 4A
|
AI1.19
|
2020-06-10 |
|
[ 15 ]
|
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.16
|
WP 4A
|
AI1.16
|
2020-06-10 |
|
[ 14 ]
|
Liaison statement to Working Parties 4B, 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.17
|
WP 4A
|
AI1.17
|
2020-06-10 |
|
[ 13 ]
|
Future revisions of Recommendation ITU-R P.372 - New table keeper for Radio Noise Measurements
|
Netherlands (Kingdom of the)
|
|
2020-06-08 |
|
[ 12 ]
|
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 3M - WRC-23 agenda item 1.18
|
WP 4C
|
AI1.18
|
2020-06-11 |
|
[ 11 ]
|
Liaison statement to Working Party 5C (copy for information to Working Parties 3M, 5A, 5B) - WRC-23 agenda item 1.15
|
WP 4A
|
AI1.15
|
2020-06-08 |
|
[ 10 ]
|
Liaison statement to Working Parties 5A and 5B (copy for information to Working Parties 3M and 5C) - WRC-23 agenda item 1.15
|
WP 4A
|
AI1.15
|
2020-06-08 |
|
[ 9 ]
|
Liaison statement to Working Parties 5A and 3M - Information for studies on WRC-23 agenda item 9.1, topic b)
|
WP 4C
|
AI9.1
|
2020-06-08 |
|
[ 8 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C (copy to Working Parties 3J and 3M for information) - Request system characteristics of primary services to be used for sharing and compatibility studies in the frequency range 231.5-252 GHz and adjacent bands
|
WP 7C
|
AI1.14
|
2020-04-30 |
|
[ 7 ]
|
Liaison statement to Working Parties 3K, 3M, and 5D - [Draft] new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION]
|
WP 7B
|
|
2020-04-30 |
|
[ 6 ]
|
Liaison statement to Working Parties 3M, 5A, 5C, 7C and 7D requesting characteristics for use in sharing studies under WRC-23 agenda item 1.13 (Working Party 5B for information and action if appropriate)
|
WP 7B
|
AI1.13
|
2020-04-28 |
|
[ 5 ]
|
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - Preparations for WRC-23 agenda items 1.1 and 1.2
|
WP 5D
|
AI1.2, AI1.1
|
2020-03-06 |
Results:454 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):