International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A-AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A-AR  C 

ITU-R WP4A-AR

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:601 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 201 ]  
 
Validationof the minimum and maximum emission parameters contained within submissions of FSS satellite networks not subject to RR Appendices 30, 30A and 30B     SES ASTRA AB     2017-04-26
[ 200 ]  
 
Demand and user requirements for aeronautical and maritime earth stations in motion (ESIM)     SES ASTRA AB   AI1.5   2017-04-26
[ 199 ]  
 
Proposed liaison statement to ITU-R Task Group 5/1 and Working Parties 5A and 5C on the FSS/BSS protection criteria for sharing studies under WRC-19 agenda item 1.13, 1.14 and 1.16     EMEA Satellite Operators Association (ESOA)   AI1.16, AI1.14, AI1.13   2017-04-26
[ 198 ]  
 
Liaison statements with FSS/BSS technical parameters for sharing studies under - WRC-19 agenda items 1.13, 1.14 and 1.16     EMEA Satellite Operators Association (ESOA)   AI1.16, AI1.14, AI1.13   2017-04-26
[ 197 ]  
 
Fixed and broadcasting satellite service sharing criteria for WRC-19 agenda items 1.13, 1.14 and 1.16     United Kingdom of Great Britain and Northern Ireland   AI1.16, AI1.14, AI1.13   2017-04-26
[ 196 ]  
 
Proposed additions/revisions to the liaison statement attachments to Task Group 5/1 and Working Party 5C to support sharing studies under agenda items 1.13 and 1.14     SES WORLD SKIES   AI1.14, AI1.13   2017-04-26
[ 195 ]  
 
Proposed amendments to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3     Indonesia (Republic of)   AI9.1   2017-04-26
[ 194 ]  
 
Proposed amendments to working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems     Indonesia (Republic of)     2017-04-26
[ 193 ]  
 
Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of MS in the frequency band 27.5-29.5 GHz     Korea (Republic of)   AI1.5   2017-04-26
[ 192 ]  
 
Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F     Egypt (Arab Republic of) , Djibouti (Republic of) , Kuwait (State of) , Oman (Sultanate of) , Qatar (State of) , United Arab Emirates   AI7   2017-04-26
[ 191 ]  
 
Consideration to the difficulties for PARTB examinations in accordance with RR No. 6.17 of Appendix 30B - WRC-19 agenda item 7 - Issue XXX     Saudi Arabia (Kingdom of) , Bahrain (Kingdom of) , Djibouti (Republic of) , Egypt (Arab Republic of) , Oman (Sultanate of) , Saudi Arabia (Kingdom of)   AI7   2017-04-26
[ 190 ]  
 
WRC-19 agenda item 1.6 - Research on EPFD limits for a typical NGSO system to GSO system in Q/V band     China (People's Republic of)   AI1.6   2017-04-26
[ 189 ]  
 
Reply liaison statement to Working Party 5D - WRC-19 agenda item 9.1, issue 9.1.2     China (People's Republic of)   AI9.1   2017-04-26
[ 188 ]  
 
Comments on working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2     China (People's Republic of)   AI9.1   2017-04-26
[ 187 ]  
 
Comments and modification proposals on the working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]     China (People's Republic of)   AI9.1   2017-04-26
[ 186 ]  
 
Working document towards a preliminary draft new Report on spectrum needs of the fixed-satellite service in allocations above 30 GHz     United States of America     2017-04-26
[ 185 ]  
 
Working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9     United States of America   AI9.1   2017-04-26
[ 184 ]  
 
Working document on WRC-19 agenda item 1.5 - Preliminary draft new Report on compatibility of Maritime ESIMs and the fixed and mobile services in the 27.5-29.5 GHz frequency band     United States of America   AI1.5   2017-04-26
[ 183 ]  
 
Working document on WRC-19 agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed and mobile services in the 27.5-29.5 GHz frequency band     United States of America   AI1.5   2017-04-26
[ 182 ]  
 
Comments on the proposed harmonization of some of the provisions of Appendix 30B with those of Appendix 30/30A     Canada   AI7   2017-04-26
[ 181 ]  
 
WRC-19 agenda item 1.6 - Considerations on non-GSO/GSO FSS sharing in the Q/V band     Canada     2017-04-26
[ 180 ]  
 
Proposed updates to working document [TOWARDS A PRELIMIANRY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9     Canada   AI9.1   2017-04-26
[ 179 ]  
 
Bringing into use of frequency assignments to non-geostationary satellite networks or systems     Canada   AI7   2017-04-26
[ 178 ]  
 
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12A and 9.13 or 9.21     Canada   AI7   2017-04-26
[ 177 ]  
 
Proposed new issue under WRC-19 agenda item 7 - Issue XX: Modifications to Appendix 4 data elements to be provided for non-Geostationary satellite networks/systems     Canada   AI7   2017-04-26
[ 176 ]  
 
Study between non-geostationary FSS systems and EESS (passive) systems in the bands 36-37 GHz and 50.2-50.4 GHz     Canada   AI1.6   2017-04-26
[ 175 ]  
 
FSS protection criteria to be used in sharing and compatibility studies for WRC-19 agenda item 1.13     GSMA   AI1.13   2017-04-26
[ 174 ]  
 
Issue[XX]: Application of Paragraph 6.6 and 6.16 of Article 6 of Appendix 30B - WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 173 ]  
 
Issue[Y]: Extension of the date of bringing into use of assignments due to force-majeure - Under WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 172 ]  
 
Issue[X]: Establishment a facility to the administrations in order to observe their comments/objections under No. 9.51 and No. 9.52 for coordination under Nos.9.7 - WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 171 ]  
 
Comments on Annex 24 to Working Party 4A Chairman's Report - Working document - Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F     Iran (Islamic Republic of)   AI7   2017-04-26
[ 170 ]  
 
Issue [Z]: Frequency bands submitted under Article 6 for additional use - Under WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 169 ]  
 
Comments to Annex 17 to Working Party 4A Chariman's Report - Working document on WRC-19 agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed service in the 27.5-29.5 GHz frequency band     Iran (Islamic Republic of)   AI1.5   2017-04-26
[ 168 ]  
 
Comments to Annex 16 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Operation of earht stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz     Iran (Islamic Republic of)   AI1.5   2017-04-26
[ 167 ]  
 
Proposed liaison statement to Working Party 5A - Regarding WRC-19 agenda item 1.12     Thailand   AI1.12   2017-04-25
[ 166 ]  
 
Characteristics for land earth stations in motion     France , Germany (Federal Republic of) , United Kingdom of Great Britain and Northern Ireland   AI1.5   2017-04-25
[ 165 ]  
 
ESIM coexistence with other satellite services     France , Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , Norway , United Kingdom of Great Britain and Northern Ireland   AI1.5   2017-04-25
[ 164 ]  
 
Draft CPM text for WRC-19 agenda item 1.5     France , Germany (Federal Republic of) , Netherlands (Kingdom of the) , Norway , United Arab Emirates   AI1.5   2017-04-25
[ 163 ]  
 
Preliminary draft revision to Recommendation ITU-R S.1503: Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations     United Kingdom of Great Britain and Northern Ireland     2017-04-25
[ 162 ]  
 
Protection of existing BSS networks in the 37.2 W - 9E orbital arc implementing earth stations with antenna size smaller than 0.60 M     Sweden     2017-04-25
[ 161 ]  
 
Some aspects of the proposed revision of paragraph 4.1.18 in Appendixes 30 and 30A of the Radio Regulations     Bulgaria (Republic of)   AI7   2017-04-25
[ 160 ]  
 
Examination results on reference antenna patern for Regions 1 and 3 BSS receiving antennas in Annex 5 to Appenix 30 of the Radio Regulations     Bulgaria (Republic of)   Q293/4   2017-04-25
[ 159 ]  
 
Protection criteia for sharing studies relating to WRC-19 - Agenda items 1.13 (IMT), 1.14 (HAPS) and 1.16 (RLAN)     United Arab Emirates     2017-04-25
[ 158 ]  
 
Most sensitive and most interfering parameters for inter service sharing studies between FSS/BSS and other services - System parameters for FSS/BSS     United Arab Emirates     2017-04-25
[ 157 ]  
 
Parameters for inter service sharing studies between FSS and RLAN services - System parameters for FSS     United Arab Emirates     2017-04-25
[ 156 ]  
 
Revisions to working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6     United States of America   AI1.6   2017-04-24
[ 155 ]  
 
Working document [TOWARDS A PRELIMINARY DRAFT NEW RECOMMENDATION/REPORT] on a methodology to estimate the E.I.R.P. density levels of land-based earth stations in motion (ESIMS) to ensure compliance with coordination distance limits and power flux density limits with respect to fixed service stations operting in the 27.5-29.5 GHz frequency band     United States of America     2017-04-24
[ 154 ]  
 
Proposed draft CPM text for WRC-19 agenda item 1.5     United States of America   AI1.5   2017-04-24
[ 153 ]  
 
Revisions to Section 12 of the working document on WRC-19 agenda item 1.5, operation of earth stations in motion (ESIMS) communicating with geostationary space stations in the fixed-satellite service into other services operating in the 27.5-29.5 GHz frequency band     United States of America     2017-04-24
[ 152 ]  
 
Proposed revisions to Annex 18 to Document 4A/196     United States of America   AI1.5   2017-04-24
Results:601 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-06-21