Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 805 ]
|
Comments/Revisions to "Working document towards a preliminary draft revision of Recommendation ITU-R M.1036-3"
|
United States of America
|
|
2010-09-29 |
|
[ 804 ]
|
Reply liaison statement on development of a new Handbook on global trends in International Mobile Telecommunications (IMT)
|
ITU-T Q.13/13 Rapporteur Group
|
|
2010-09-27 |
|
[ 803 ]
|
Update on recent acitivities within CEPT
|
ITU Region 1 (CEPT) Rapporteur
|
|
2010-09-24 |
|
[ 802 ]
|
Liaison statement on X.oacms - Overall aspects of countering messaging spam in mobile networks
|
ITU-T SG 17 Management
|
|
2010-09-24 |
|
[ 801 ]
|
Draft revision of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
|
Director, BR
|
|
2010-09-23 |
|
[ 800 ]
|
Draft revision of Report ITU-R M.2039-1
|
Director, BR
|
|
2010-09-23 |
|
[ 799 ]
|
Draft new Report on the sharing studies in relation to Resolution 224 in the bands 790-862 and 698-806 MHz
|
Director, BR
|
|
2010-09-23 |
|
[ 798 ]
|
DECT information regarding the update of Recommendation ITU-R M.1457
|
ETSI
|
229/8
|
2010-09-15 |
|
[ 797 ]
|
Note from the Chairman of Study Group 4 to the Chairmen of Study Group 5 and Working Party 5D (copy to Working Parties 4B and 4C) - Satellite component of IMT
|
SG 4
|
|
2010-09-13 |
|
[ 796 ]
|
Reply liaison statement to ITU-R Working Party 5A on performance and availability requirements and objectives for wireless access systems
|
ITU-T SG 16
|
|
2010-08-09 |
|
[ 795 ]
|
Reply liaison statement to SG 5 and ITU-R WP 5D on a possible new Question on IMT impact
|
ITU-T SG 9
|
|
2010-07-28 |
|
[ 794 ]
|
Liaison statement to Working Party 5D - Progress of studies related to the satellite radio interface of IMT-Advanced
|
WP 4C
|
|
2010-07-26 |
|
[ 793 ]
|
Liaison statement to Working Party 5D - Techniques designed to increase the potential for sharing between IMT systems and FSS networks in the 3.4-3.6 GHz band
|
WP 4A
|
|
2010-07-26 |
|
[ 792 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
|
WP 1A
|
|
2010-07-22 |
|
[ 791 ]
|
Additional guidelines for updating the Recommendations listed in Document 5B/465 (copied to Working Parties 5A, 5C and 5D for information)
|
Chairman, SG 5
|
|
2010-07-01 |
|
[ 790 ]
+Ch.1-8 |
Report of the eighth meeting of Working Party 5D (Da Nang, 9 - 16 June 2010)
|
Chairman, WP 5D
|
|
2010-06-25 |
|
[ 789 ]
|
Final list of participants
|
Director, BR
|
|
2010-06-29 |
|
[ 788 ]
|
Liaison statement - New versions of the access network transport (ANT) standardization overview and work plan
|
ITU-T SG 15
|
|
2010-06-22 |
|
[ 787 ]
|
Liaison statement - Response on G.9971 by ITU-R Working Party 5D
|
ITU-T SG 15
|
|
2010-06-22 |
|
[ 786 ]
|
Liaison statement - Consent of Recommendation G.9971 "Requirements of transport functions in IP home networks"
|
ITU-T SG 15
|
|
2010-06-22 |
|
[ 785 ]
|
Activities related to IMT-2000 and IMT-Advanced in Region 3
|
Region 3 Rapporteur
|
|
2010-06-15 |
|
[ 784 ]
|
Correspondence received regarding the update of Recommendation ITU-R M.1457 to Revision 10
|
Director, BR
|
|
2010-06-14 |
|
[ 783 ]
(Rev.1) |
Update on standards activities
|
Region 2 Rapporteur
|
|
2010-06-08 |
|
[ 782 ]
|
Update on recent activities within CEPT
|
ITU Region 1 (CEPT) Rapporteur
|
|
2010-06-04 |
|
[ 781 ]
|
CEG Evaluation Report on the Candidate Proposals submitted to WP 5D of the ITU-R
Report with final results
|
Director, BR
|
|
2010-05-31 |
|
[ 780 ]
|
Presentation - Final Report on Evaluation of the IMT-Advanced Radio Interface Technologies
|
Director, BR
|
|
2010-06-02 |
|
[ 779 ]
|
Final Evaluation Report from WiMAX Forum Evaluation Group on the IMT-Advanced proposal in Documents IMT-ADV/4, IMT-ADV/5 and IMT-ADV/7 (IEEE Wireless-MAN Advanced)
|
Director, BR
|
|
2010-06-02 |
|
[ 778 ]
|
Proposed update of the working document toward the preliminary draft new Report ITU-R M.[IMT.CRS] - Cognitive radio systems specific for IMT systems
|
Brazil (Federative Republic of)
|
|
2010-06-02 |
|
[ 777 ]
|
Proposed preliminary draft new Report ITU-R M.[IMT.UPDATE] - Analysis and assessment of global broadband wireless services and marketplace for IMT
|
Brazil (Federative Republic of)
|
|
2010-06-02 |
|
[ 776 ]
|
Considerations on frequency arrangement for 3 400- 3 600 MHz in Recommendation ITU-R M.1036
|
Brazil (Federative Republic of)
|
|
2010-06-02 |
|
[ 775 ]
|
Results of IMT-Advanced Evaluations
|
Brazil (Federative Republic of)
|
|
2010-06-02 |
|
[ 774 ]
|
Comparison of finnish mobile broadband data usage rates (2009) and UMTS Forum estimates (2005)
|
Nokia Corporation
|
|
2010-06-02 |
|
[ 773 ]
|
Proposals related to band plan flexibility in Recommendation ITU-R M.1036-3
|
Nokia Corporation
,
Nokia Siemens Networks GmbH & Co. KG
,
Telefon AB-LM Ericsson
|
|
2010-06-02 |
|
[ 772 ]
|
Elements for IMT.UPDATE discussion and a first proposal for structure of the Report
|
Nokia Corporation
,
Nokia Siemens Networks GmbH & Co. KG
,
NTT DoCoMo Inc.
,
Telefon AB-LM Ericsson
|
229-2/5
|
2010-06-02 |
|
[ 771 ]
|
Working document towards a PDNR on isolation for antennas of base stations in the land mobile service including IMT
|
Telefon AB-LM Ericsson
|
|
2010-06-02 |
|
[ 770 ]
|
A way forward on the Update of ITU-R Supplement 1 of the Handbook on IMT-2000
|
AT&T Inc.
|
|
2010-06-02 |
|
[ 769 ]
|
Final Evaluation Report from WINNER+ on the IMT-Advanced proposal in documents IMT-ADV/6, IMT-ADV/8 nad IMT-ADV/9
|
Director, BR
|
|
2010-06-02 |
|
[ 768 ]
|
Minimum Coupling Loss and antenna isolation
|
France Télécom Orange
|
|
2010-06-02 |
|
[ 767 ]
|
Text proposal on preliminary draft new Report (PDNR) of ITU-R [IMT.CRS] - Cognitive radio systems specific to IMT systems
|
ZTE Corporation
,
DaTang Telecom. Technology & Industry Hod'g Co. Lt
|
|
2010-06-02 |
|
[ 766 ]
|
Proposal of the mobile service base station antennas of the Report on isolation for antennas
|
China (People's Republic of)
|
|
2010-06-02 |
|
[ 765 ]
|
Proposal of examples of isolation scenarios of the Report on isolation for antennas
|
China (People's Republic of)
|
|
2010-06-02 |
|
[ 764 ]
|
Proposal of actions for IMT-Advanced development at the eight Working Party 5D meeting
|
China (People's Republic of)
,
Japan
,
Korea (Republic of)
|
229-2/5
|
2010-06-02 |
|
[ 763 ]
|
Evaluation results in open area rural model provided by TCOE India with TDD RIT of submissions in documents IMT-ADV/6 IMT-ADV/8 and IMT-ADV/9
|
Director, BR
|
|
2010-06-02 |
|
[ 762 ]
|
Contribution to the workplan for sharing and compatibility studies in the UHF band
|
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
|
2010-06-02 |
|
[ 761 ]
|
Contribution to PDNR on isolation for antennas of base stations in the land mobile service including IMT.Doc
|
China (People's Republic of)
|
|
2010-06-02 |
|
[ 760 ]
|
Final Evaluation Report on submissions in Documents IMT-Advanced/6, IMT-Advanced/8 and IMT-Advanced/9
|
Director, BR
|
|
2010-06-02 |
|
[ 759 ]
|
Working method and study area of market forecasting and spectrum estimation for IMT systems in next decade
|
China (People's Republic of)
|
|
2010-06-02 |
|
[ 758 ]
|
Information on proposed new Question in ITU-T Study Group 9
|
ITU-T SG 5
|
|
2010-06-02 |
|
[ 757 ]
|
Final Report on the IMT-Avanced candidate Radio Interface Technology Evaluation
|
Director, BR
|
|
2010-06-02 |
|
[ 756 ]
|
Final Report of Correspondence Group for IMT-Advanced Evaluation Groups
|
Convener of Correspondence Group
|
229-2/5
|
2010-06-02 |
Results:1180 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):