Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 420 ]
|
Revision of Report ITU-R M.2116
|
WiMAX Forum
|
|
2009-11-16 |
|
[ 419 ]
|
Input on working document towards preliminary draft new Report ITU-R S.[BWA-FSS]
|
WiMAX Forum
|
|
2009-11-16 |
|
[ 418 ]
|
Liaison statement - Preliminary draft revision of Recommendation ITU-R F.1191 - Bandwidths and unwanted emissions of digital fixed service systems
|
WP 5C
|
|
2009-12-17 |
|
[ 417 ]
|
Liaison statement - Interference modelling between HAPS gateway links and intelligent transportation systems and fixed wireless access systems in the 5 850-7 075 MHz band (WRC-12 Agenda item 1.20)
|
WP 5C
|
|
2009-12-17 |
|
[ 416 ]
|
Liaison statement to Working Party 5A - Common activities of both WPs on developing preliminary draft new Report ITU-R F.[CROSS-BORDER]
|
WP 5C
|
|
2009-12-17 |
|
[ 415 ]
|
Liaison statement to Working Parties 5A and 5C - Compatibility studies between radiolocation and mobile and fixed services in the band 30-300 MHz (WRC-12 Agenda item 1.14)
|
WP 5B
|
|
2009-12-11 |
|
[ 414 ]
|
Liaison statement to Working Party 1A (copy to Working Parties 5A, 5B, 5C and 7D for information) - Report ITU-R SM.2158 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 6A
|
|
2009-12-08 |
|
[ 413 ]
|
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.13 (copy to WP 5A for information)
|
WP 5C
|
|
2009-12-08 |
|
[ 412 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7D and to the Working Party of the Special Committee - WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 5C
|
|
2009-12-04 |
|
[ 411 ]
+Ann.1-22 |
Report on the fourth meeting of Working Party 5A (Geneva, 23 November to 2 December 2009)
|
Chairman, WP 5A
|
|
2009-12-02 |
|
[ 410 ]
|
Final List of Participants - Working Party 5A (Geneva, 23 November-2 December 2009)
|
Director, BR
|
|
2009-12-02 |
|
[ 409 ]
|
Reply to LS: Liaison statement on the development of a draft new Recommendation on performance and availability requirements and objectives for wireless access systems
|
ITU-T SG 12
|
|
2009-11-23 |
|
[ 408 ]
|
Liaison statement to ITU-R Working Party 5A on studies related to WRC-12 Agenda item 1.23
|
WP 5B
|
|
2009-11-30 |
|
[ 407 ]
|
Liaison statement to Working Party 5A (copy to Working Party 5C for information) - Protection criteria and system parameters for land mobile systems operating between 3 and 50 MHz
|
WP 5B
|
|
2009-11-30 |
|
[ 406 ]
|
Liaison statement to Working Party 5A on studies related to WRC-12 Agenda item 1.23
|
WP 5C
|
|
2009-11-27 |
|
[ 405 ]
|
Report on relevant activities in certain countries in Region 1
|
Region 1 Liaison Rapporteur
|
|
2009-11-23 |
|
[ 404 ]
(Rev.1) |
List of documents issued
|
BR Study Group Department
|
|
2009-11-20 |
|
[ 403 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 6B
|
|
2009-11-20 |
|
[ 402 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5C, 6B, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems.
|
WP 6A
|
|
2009-11-20 |
|
[ 401 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 5A and 5C) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications
|
WP 6A
|
|
2009-11-20 |
|
[ 400 ]
|
Report on relevant activities in certain countries in Region 2
|
Region 2 Liaison Rapporteur
|
|
2009-11-18 |
|
[ 399 ]
|
Update on the correspondence activities since the 3rd meeting of Working Party 5A
|
Editor Vol.5 LMH
|
|
2009-11-18 |
|
[ 398 ]
|
Issues drawing attention of the Working Parties in relation to the result of WTPF-09
|
Chairman, SG 5
|
|
2009-11-18 |
|
[ 397 ]
|
Results from the third meeting of Study Group 5 (29 May 2009) of interest to Working Party 5A
|
Chairman, WP 5A
|
|
2009-11-18 |
|
[ 396 ]
+Add.1 |
Response liaison on the invitation for contributions in the development of an ITU-R Report on cognitive radio systems in the mobile service
|
Director, BR
|
|
2009-11-16 |
|
[ 395 ]
|
Working document towards a preliminary draft new Recommendation - Intelligent transport systems (ITS) - Objectives and requirements
|
Japan
|
205-4/5
|
2009-11-16 |
|
[ 394 ]
|
Proposed draft liaison statement to Working Party 1B - Concerning the study on cognitive radio systems
|
Japan
|
|
2009-11-16 |
|
[ 393 ]
|
Proposed modification to the working document towards a preliminary draft new Report on cognitive radio system in the land mobile service
|
Japan
|
241-1/5
|
2009-11-16 |
|
[ 392 ]
|
Proposed modification to table of contents of working document towards a preliminary draft new Report on cognitive radio systems in the land mobile service
|
Japan
|
241-1/5
|
2009-11-16 |
|
[ 391 ]
|
Proposal for a preliminary draft revision of Report ITU-R F.2086 - Technical and operational characteristics and applications of broadband wireless access in the fixed service
|
Japan
|
|
2009-11-16 |
|
[ 390 ]
|
Proposed modifications to working document towards a preliminary draft new Recommendation - Technical and operational requirements on mobile wireless access systems for communications to a large number of ubiquitous sensors and/or actuators scattered over wide areas in the land mobile service
|
Japan
|
250/5
|
2009-11-16 |
|
[ 389 ]
|
Preliminary review of the M-series Recommendations contained in Appendix 1 to Annex 1 to Document 5A/305
|
Japan
|
|
2009-11-16 |
|
[ 388 ]
|
Updating of the F-series Recommendations contained in appendix 1 to Annex 1 to document 5A/305
|
Japan
|
|
2009-11-16 |
|
[ 387 ]
|
Working document toward a preliminary draft new Report on advanced intelligent transport systems (ITS) radiocommunications
|
Japan
|
205-4/5
|
2009-11-16 |
|
[ 386 ]
|
Proposed draft reply to Working Party 4C WRC-12 Agenda item 1.18 - Information on VICS characteristics
|
Japan
|
|
2009-11-16 |
|
[ 385 ]
|
Candidate sub-band proposal for WRC-12 Agenda item 1.23
|
United Kingdom of Great Britain and Northern Ireland
|
|
2009-11-16 |
|
[ 384 ]
|
Text proposal and revisions for Chapter 6.3 and 7 of a working document towards a preliminary draft new Report on "Cognitive radio systems in the land mobile service"
|
Nokia Siemens Networks GmbH & Co. KG
,
Nokia Corporation
|
241-1/5
|
2009-11-16 |
|
[ 383 ]
|
Proposed modifications to the working document towards a preliminary draft new Report - Cognitive radio systems in the land mobile service
|
Alcatel-Lucent France
,
Alcatel-Lucent USA Inc.
,
China (People's Republic of)
,
Germany (Federal Republic of)
,
Telecom Italia S.p.A.
|
241/5
|
2009-11-16 |
|
[ 382 ]
|
Response liaison to invitation for contributions in the development of an ITU-R Report on cognitive radio systems in the mobile service
|
Alcatel-Lucent France
,
Alcatel-Lucent USA Inc.
,
NEC Corporation
,
Telecom Italia S.p.A.
|
|
2009-11-16 |
|
[ 381 ]
|
Report on relevant activities in certain countries in Region 3
|
Liaison Rapporteur
|
|
2009-11-16 |
|
[ 380 ]
|
Amateur service temporary operation in other countries - Proposal of an International Convention on amateur service temporary operation
|
Brazil (Federative Republic of)
|
|
2009-11-16 |
|
[ 379 ]
|
Proposed modification to the working document towards a preliminary draft new Report - Cognitive radio systems in the land mobile service
|
Finland
|
|
2009-11-16 |
|
[ 378 ]
|
Proposed contribution to working document towards a preliminary draft new Report - Cognitive Radio Systems in the Land Mobile Service - Mesh division based on Cognitive Pilot Channel in cognitive radio environment
|
China (People's Republic of)
|
241-1/5
|
2009-11-16 |
|
[ 377 ]
|
Proposed contribution to working document towards a preliminary draft new Report - Cognitive radio systems in the land mobile service - Multi-dimension cognitive database for cognitive radio system
|
China (People's Republic of)
|
241-1/5
|
2009-11-16 |
|
[ 376 ]
|
Proposed contribution to working document towards a preliminary draft new Report - Cognitive radio systems in land mobile service - Key performance indicators for spectrum sensing
|
China (People's Republic of)
|
241-1/5
|
2009-11-16 |
|
[ 375 ]
|
Proposed contribution to working document towards a preliminary draft new Report - Cognitive radio systems in the land mobile service - Multicast CPC mode in cognitive radio environment
|
China (People's Republic of)
|
241-1/5
|
2009-11-16 |
|
[ 374 ]
|
Proposal for working document towards a preliminary draft new Report - Cognitive radio systems in the land mobile service
|
China (People's Republic of)
|
|
2009-11-16 |
|
[ 373 ]
|
Revised working document towards a preliminary draft new Recommendation - Mobile wireless access systems providing communications to a large number of ubiquitous sensors and/or actuators scattered over wide areas in the land mobile service
|
China (People's Republic of)
|
|
2009-11-16 |
|
[ 372 ]
|
Proposed modification to a revision of Recommendation ITU-R M.1801 - Radio interface standards for broadband wireless access systems, including mobile and nomadic applications, in the mobile service operating below 6 GHz
|
Director, BR
|
|
2009-11-16 |
|
[ 371 ]
|
Text proposals for a working document towards a preliminary draft new Report ITU-R [LMS.CRS] - Cognitive radio systems in the land mobile service - Technical characteristics and functionalities of cognitive radio systems
|
China (People's Republic of)
|
241/5
|
2009-11-16 |
Results:795 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):