Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 413 ]
|
Proposed interfaces related content for Chapter 8 in TR.ENO
|
China Academy of Information and Communications Technology
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q12/15
|
2025-09-23 |
|
[ 412 ]
|
Proposed NMA related content for Chapter 7.3 of TR.ENO
|
China Academy of Information and Communications Technology
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2025-09-23 |
|
[ 411 ]
(Rev.1) |
Proposals for a new work item on fgOTN M+1 protection for power grid
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Southern Power Grid Co., Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2025-09-23 |
|
[ 410 ]
(Rev.1) |
New work item proposal on revision of Recommendation G.65x (for including coating attributes)
|
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
CAICT China, China Unicom
,
China Information Communication Technologies Group(CICT)
|
Q5/15
|
2025-09-23 |
|
[ 409 ]
|
Tolerancing core position geometry in MCF
|
OFS Fitel, LLC (United States)
|
Q5/15
|
2025-09-23 |
|
[ 408 ]
(Rev.1) |
Comments on Draft ITU-T L.ocpw2
|
State Grid Corporation of China
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2025-09-23 |
|
[ 407 ]
|
Initial draft for ITU-T L.Suppl.ne
|
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2025-09-23 |
|
[ 406 ]
|
Correction in G.Sup.DCSync PTP profiles
|
Calnex Solutions plc. (United Kingdom)
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-09-22 |
|
[ 405 ]
|
G.8274: Improved text for Appendix VII.7 Reliability Engineering
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
,
Microchip Technology Inc. (United States)
|
Q13/15
|
2025-09-21 |
|
[ 404 ]
(Rev.1) |
Proposal on description of coating diameter in G.65x single-mode fibres Recommendations
|
Communication Line Products Association of Japan
,
NTT, Inc. (Japan)
|
Q5/15
|
2025-09-19 |
|
[ 403 ]
(Rev.1) |
Optical compatibility of weakly-coupled multi-core fibre with existing G.65x single-mode fibres
|
Communication Line Products Association of Japan
,
KDDI Corporation (Japan)
,
NEC Corporation (Japan)
,
NTT, Inc. (Japan)
|
Q5/15
|
2025-09-19 |
|
[ 402 ]
(Rev.1) |
Domestic round-robin measurement for inter-core crosstalk of weakly-coupled multi-core fibres
|
Communication Line Products Association of Japan
,
NTT, Inc. (Japan)
|
Q5/15
|
2025-09-19 |
|
[ 401 ]
|
Proposed scope of new Recommendation G.9730
|
Communication Line Products Association of Japan
,
NTT, Inc. (Japan)
|
Q8/15
|
2025-09-18 |
|
[ 400 ]
|
Proposed modifications to the revision of L.105
|
Communication Line Products Association of Japan
,
NTT, Inc. (Japan)
|
Q7/15, Q5/15
|
2025-09-18 |
|
[ 399 ]
|
Datacenter networks support in G.8274
|
Calnex Solutions plc. (United Kingdom)
,
Huawei Technologies Co., Ltd. (China)
,
Nvidia (Israel)
|
Q13/15
|
2025-09-15 |
|
[ 398 ]
|
Proposition de creation d'un groupe regional Africain SG15-RG-AFR
|
Autorite de Regulation des Telecommunications et des Postes (ARTP) (Senegal)
|
QALL/15
|
2025-09-15 |
|
[ 397 ]
|
G.8274: Text for chapter 5 - Conventions
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
,
Microchip Technology Inc. (United States)
|
Q13/15
|
2025-09-04 |
|
[ 396 ]
|
For G.8274 text: note to consider cnPRTC at sub-clause 7.1
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
,
Microchip Technology Inc. (United States)
|
Q13/15
|
2025-09-02 |
|
[ 395 ]
|
Text for PRTC/ePRTC/cnPRTC Time error in locked mode specification
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
,
Microchip Technology Inc. (United States)
|
Q13/15
|
2025-08-23 |
|
[ 394 ]
|
G.8272 Appendix V: "Considerations for the use of GNSS for the PRTC"
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
,
Microchip Technology Inc. (United States)
|
Q13/15
|
2025-08-01 |
|
[ 393 ]
|
GNSS for PRTCx: GNSS performance and dynamic Time Error
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
,
Microchip Technology Inc. (United States)
|
Q13/15
|
2025-08-01 |
|
[ 392 ]
|
Integration of optical fiber into electrical power transmission lines from hydroelectric dams: A lever for the development of emerging countries.
|
Cameroon
,
Central African Rep.
,
Guinea
,
Haiti
,
Mali
|
Q7/15
|
2025-07-27 |
|
[ 391 ]
|
Unicast PTP over IP protocol for Data Center proposed for G.Sup.DCSync
|
Meta Platforms, Inc. (United States)
,
Keysight Technologies Deutschland GmbH (Germany)
|
Q13/15
|
2025-03-05 |
|
[ 390 ]
|
Unicast PTP over IP profile for Data Center proposed for G.Sup.DCSync
|
Meta Platforms, Inc. (United States)
,
Keysight Technologies Deutschland GmbH (Germany)
,
Meinberg Funkuhren GmbH & Co.KG (Germany)
,
Nvidia (Israel)
|
Q13/15
|
2025-03-05 |
|
[ 388 ]
|
Wavelength Mobility testing for TWDM PON deployments
|
Verizon Communication Corporation (United States)
|
Q2/15
|
2025-03-04 |
|
[ 387 ]
|
G.Sup.VHSP_15min_Update of Rx Sensitivity Table and Excel Sheet for the VHSP supplement
|
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q2/15
|
2025-03-04 |
|
[ 386 ]
|
G.9805_15min_Inclusion of C+, C+b, and B+b Transceiver Options into G.9805
|
AT&T, Inc. (United States)
,
British Telecommunications Plc. (BT Plc) (United Kingdom)
,
Frontier Communication (United States)
,
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
,
SK Telecom (Korea (Rep. of))
|
Q2/15
|
2025-03-04 |
|
[ 385 ]
(Rev.1) |
Time and frequency synchronization service availability performance metrics
|
Nokia USA (United States)
,
Swisscom SA (Switzerland)
|
Q13/15
|
2025-03-04 |
|
[ 384 ]
|
G.9804.3_15min_Update of Table 9-8a for non-MPM key optical parameters and associated changes
|
AT&T, Inc. (United States)
,
British Telecommunications Plc. (BT Plc) (United Kingdom)
,
Frontier Communication (United States)
,
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
,
SK Telecom (Korea (Rep. of))
|
Q2/15
|
2025-03-04 |
|
[ 383 ]
|
G.9805 50G-PON Class D Specifications
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2025-03-04 |
|
[ 382 ]
|
G.Sup.VHSP : Text on Migration Scenarios
|
Huawei Technologies Düsseldorf GmbH (Germany)
,
Nokia Corporation (Finland)
|
Q2/15
|
2025-03-04 |
|
[ 381 ]
|
Consideration on ODN visualization and smart city applications for DFOS in G.sup.VHSP
|
China Information Communication Technologies Group
|
Q2/15
|
2025-03-04 |
|
[ 380 ]
(Rev.1) |
Considerations of OTN high reliability transmission applied into DCI
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-03-04 |
|
[ 379 ]
|
G.Sup.VHSP_10min_Considerations on downstream burst-mode operation
|
Nokia Corporation (Finland)
|
Q2/15
|
2025-03-04 |
|
[ 378 ]
|
G.9804.2_15min_PLOAM_IK and OMCI_IK switching issue in G.9804.2 Amd.3
|
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
|
Q2/15
|
2025-03-04 |
|
[ 377 ]
|
G.9804.2_10min_Cipher algorithm issue in G.988 and G.9804.2 AM3
|
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
|
Q2/15
|
2025-03-04 |
|
[ 376 ]
|
G.Sup.VHSP_5min_Analysis of real-life ODN loss data
|
Frontier Communication (United States)
,
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q2/15
|
2025-03-04 |
|
[ 375 ]
|
G.Sup.VHSP_15min_Fitting multiple High Margin FEC in Downstream Time Slots
|
Nokia Corporation (Finland)
|
Q2/15
|
2025-03-04 |
|
[ 374 ]
|
G.9804.2_15min_Refining and Fixing Bonding
|
Nokia Corporation (Finland)
|
Q2/15
|
2025-03-04 |
|
[ 373 ]
|
Suggested Definitions and Abbreviations in G.9960 2023 Amd 2
|
Fraunhofer HHI & IIS (Germany)
|
Q3/15
|
2025-03-04 |
|
[ 372 ]
|
G.Sup.VHSP_15min_ODB alignment and wavelengths ranges
|
Nokia Corporation (Finland)
|
Q2/15
|
2025-03-04 |
|
[ 371 ]
|
Review of the G.7721 SyncPhy Data Dictionary
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q14/15, Q13/15
|
2025-03-04 |
|
[ 370 ]
|
G.Sup.VHSP_15min_IMDD first-order PMD tolerance for MLSE
|
Nokia Corporation (Finland)
|
Q2/15
|
2025-03-04 |
|
[ 369 ]
|
G.Sup.VHSP_15min_Non-transmitting ONU narrowband interference capture problem
|
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q2/15
|
2025-03-04 |
|
[ 368 ]
(Rev.1) |
A13 form for new Supplement_5min_LLSoTDM
|
British Telecommunications Plc. (BT Plc) (United Kingdom)
,
Ciena Canada
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
Nokia Corporation (Finland)
,
SK Telecom (Korea (Rep. of))
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2025-03-04 |
|
[ 367 ]
|
G.Sup.VHSP_5min_Update of VHSP supplement draft on the IM-DD US and DS wavelength allocations
|
Huawei Technologies Düsseldorf GmbH (Germany)
,
Nokia Corporation (Finland)
|
Q2/15
|
2025-03-04 |
|
[ 366 ]
|
Description issue in clause 9 of Recommendation ITU-T G.8021
|
Nokia USA (United States)
|
Q10/15
|
2025-03-04 |
|
[ 365 ]
|
Referencing issue in Table A.1 of Recommendation ITU-T G.8013-Y.1731
|
Nokia USA (United States)
|
Q10/15
|
2025-03-04 |
|
[ 364 ]
|
Expanding support and aligning with ITU style in draft Rec. ITU-T G.eth
|
Nokia USA (United States)
|
Q10/15
|
2025-03-04 |
|
[ 363 ]
(Rev.1) |
Proposal to start a new family of Recommendations on the transmission of data over power lines in software defined Vehicles (Data Over Power - Vehicle Network)
|
Maxlinear Inc (United States)
|
Q3/15
|
2025-03-04 |
Resultats:761 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):