Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 251 ]
|
Guidance and updates to the FSS/BSS technical parameters for sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16
|
United Arab Emirates
|
AI1.16, AI1.14, AI1.113
|
2017-10-09 |
|
[ 250 ]
|
Proposed new issue X under WRC-19 agenda item 7 - Difficulties for Part B examinations under & 6.21 C) of RR Appendix 30B
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2017-10-09 |
|
[ 249 ]
|
Proposed modification to prreliminary draft CPM text for WRC-19 agenda item 7 issue C6
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2017-10-09 |
|
[ 248 ]
|
Preliminary draft revision of Recommendation ITU-R S.1503-2 - Functional description to be used in developing software tools for determining conformity of non-geostationary -satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations (Draft)
|
Canada
|
|
2017-10-06 |
|
[ 247 ]
|
Observations on procedural issues related to the application of a prossible revision to Recommendation ITU-R S.1503-2
|
Canada
|
AI7
|
2017-10-06 |
|
[ 246 ]
|
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S. [NGSO_FSS_BIU]
|
Canada
|
AI7
|
2017-10-06 |
|
[ 245 ]
|
Comments and proposals relating to Issue C3 under Agenda item 7
|
Canada
|
AI7
|
2017-10-06 |
|
[ 244 ]
|
Proposed modifications to the preliminary draft CPM Report on Agenda item 7 Issue D
|
Canada
|
AI7
|
2017-10-06 |
|
[ 243 ]
|
Proposed preliminary CPM Report for Issue H under Agenda item 7
|
Canada
|
AI7
|
2017-10-06 |
|
[ 242 ]
|
Study of mitigation techniques between non-GSO FSS systems in the bands 36-37 GHz and 50.2-50.4 GHz
|
Canada
|
AI1.6
|
2017-10-06 |
|
[ 241 ]
|
Study between non-Geostationary FSS systems and EESS (passive) systems in the bands 50.2-50.4 GHz
|
Canada
|
AI1.6
|
2017-10-06 |
|
[ 240 ]
|
Proposed updates to working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9
|
Canada
|
AI9.1
|
2017-10-06 |
|
[ 239 ]
|
WRC-19 agenda item 9.1 issue 9.1.9 - Compatibility of fixed-satellite service with IMT-2020 applications of the mobile service in 51.4-52.5 GHz
|
Australia
|
AI9.1
|
2017-10-06 |
|
[ 238 ]
|
Draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHZ] - Uplink interference issues associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band
|
Australia
|
|
2017-10-06 |
|
[ 237 ]
|
Polarization loss for aggregate studies
|
France
|
AI1.13
|
2017-10-03 |
|
[ 236 ]
|
Proposed revision to working document - Validation of the minimum and maximum emission parameters contained within submissions of FSS satellite networks not subject to RR Appendices 30, 30A and 30B
|
Japan
|
|
2017-10-03 |
|
[ 235 ]
|
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issues 9.1.2)
|
Japan
|
AI9.1
|
2017-10-03 |
|
[ 234 ]
|
Proposal on the mitigation measures for sharing and compatibility studies between Earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS and MS in the frequency band 27.5-29.5 GHz under WRC-19 agenda item 1.5
|
Japan
|
AI1.5
|
2017-10-03 |
|
[ 233 ]
|
Proposal on the calculation method of separation distance between earth stations in motion operating with geostatioanry FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz under WRC-19 agenda item 1.5
|
Japan
|
AI1.5
|
2017-10-03 |
|
[ 232 ]
|
Consideration on the reference EPM - In relation to issue G under agenda item 7
|
Japan
|
AI7
|
2017-10-03 |
|
[ 231 ]
|
Proposal for inclusion of an issue under WRC-19 agenda item 7 - Modification of Section 1, Annex 1 of RR Appendix 30
|
Japan
|
|
2017-10-03 |
|
[ 230 ]
|
Proposal for the modification to working document towards a prliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the brining into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
|
Japan
|
AI7
|
2017-10-03 |
|
[ 229 ]
|
Working document on WRC-19 agenda item 1.5 - Sharing and compatibility between maritime earth stations in motion operating with geostationary FSS networks and current and planned stations of MS in the frequency band 27.5-29.5 GHz
|
Korea (Republic of)
|
AI1.5
|
2017-09-29 |
|
[ 228 ]
|
Working document on WRC-19 agenda item 1.5 - Sharing study between aeronautical earth stations in motion operating with geostationary FSS networks and current and planned stations of MS in the frequency band 27.5-29.5 GHz
|
Korea (Republic of)
|
|
2017-09-29 |
|
[ 227 ]
|
Practical usefulness of the Annex 7 to Appendix 30 orbital ARC limitations revision
|
France
|
|
2017-09-28 |
|
[ 226 ]
|
Agenda item 1.6 - Clarification and information requested by Working Party 4A to progress sharing and compatibility studies between FSS and RAS operations near 50 GHz
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
AI1.6
|
2017-09-26 |
|
[ 225 ]
|
Agenda item 7 issue B, clarifications and regulatory text
|
Spain
|
AI7
|
2017-09-20 |
|
[ 224 ]
|
Report of the thirteenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
|
International Maritime Organization
|
|
2017-09-11 |
|
[ 223 ]
|
Protection criteria for sharing studies relating to WRC-19 agenda items 1.13 (IMT)and 1.14 (HAPS)
|
France
|
AI1.14, AI1.13
|
2017-04-26 |
|
[ 222 ]
|
Working document towards a preliminary draft new Report on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9
|
France
|
AI9.1
|
2017-04-26 |
|
[ 221 ]
|
Working document towards a preliminary draft new Report on sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9
|
France
|
AI9.1
|
2017-04-26 |
|
[ 220 ]
|
Proposed liaison statement to Working Party 5B - WRC-19 agenda item 9.1, issue 9.1.9
|
France
|
AI9.1
|
2017-04-26 |
|
[ 219 ]
|
Examples of coordination distances between IMT and BSS (sound) in the 1 452-1 492 MHz band
|
France
|
AI9.1
|
2017-04-26 |
|
[ 218 ]
|
Remarks on coordination mechanisms between IMT and BSS (sound) in the 1 452-1 492 MHz band
|
France
|
AI9.1
|
2017-04-26 |
|
[ 217 ]
|
Variations of non-geostationary satellie parameters between coordination and notification
|
France
|
AI7
|
2017-04-26 |
|
[ 216 ]
|
Protection criteria of systems in the fixed-satellite srvice
|
France
|
AI1.16, AI1.14, AI1.13
|
2017-04-26 |
|
[ 215 ]
|
Preliminary draft revision to Recommendation ITU-R S. 1503-2 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite systems networks with limits contained in Article 22 of the Radio Regulations
|
France
|
|
2017-04-26 |
|
[ 214 ]
|
Review and possible revision of Annex 7 to Appendix 30 of the Radio Regulations
|
France
,
Eutelsat S.A.
|
AI1.4
|
2017-04-26 |
|
[ 213 ]
|
Proposals on the FSS technical parameters for sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16
|
Russian Federation
|
AI1.16, AI1.14, AI1.13
|
2017-04-26 |
|
[ 212 ]
|
Revisions to working document on WRC-19 agenda item 1.5 on regulatory issues - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
Russian Federation
|
AI1.5
|
2017-04-26 |
|
[ 211 ]
|
Estimation of allowable interference level produced by frequency assignments located in the allowable orbital arc portions and being in compliance with pfd limits of Annex 1 (Section1) to RR Appendix 30 for stations using smaller than 60 cm antenna
|
Russian Federation
|
AI1.4
|
2017-04-26 |
|
[ 210 ]
|
Proposals on WRC-19 agenda item 1.4
|
Russian Federation
|
AI1.4
|
2017-04-26 |
|
[ 209 ]
|
Working document towards protection of RAS systems from non-GSO satellite systems operating in the 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6
|
Russian Federation
|
|
2017-04-26 |
|
[ 208 ]
|
Working document towards proposals to the preliminary draft revision of Recommendation ITU-R S.1323-2
|
Russian Federation
|
AI1.6
|
2017-04-26 |
|
[ 207 ]
|
Draft CPM text
|
Luxembourg
|
AI1.4
|
2017-04-26 |
|
[ 206 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions
|
Luxembourg
|
AI1.4
|
2017-04-26 |
|
[ 205 ]
|
Considerations on the working document towards a preliminary draft new [RECOMMENDATION/REPORT] ITU-R S.[GUIDELINES_14.5-14.8 GHZ]
|
Luxembourg
|
|
2017-04-26 |
|
[ 204 ]
|
Working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Modification of the Luxembourg option (option 4), related to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems
|
Luxembourg
|
AI7
|
2017-04-26 |
|
[ 203 ]
|
Proposed new issue X under WRC-19 agenda item 7 - Submission of one set of Appendix 4 data under Appendix 30B for treatment both in respect of entering into the List and in respect of Notification
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2017-04-26 |
|
[ 202 ]
|
Proposed new issue Y under WRC-19 agenda item 7 - Submission of one notice under Appendices 30 and 30A for treatment both in respect of entering into the List and in respect of Notification
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2017-04-26 |
Results:601 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):