| Contributions  | 
| 
 | Numéro 
 | Titre | Source | AI/Question 
 | Date | 
|  | [ 48 ] 
 | Working Party 7C activities related to Resolution 731 (Rev. WRC-19) | European Space Agency
          	    ,
        	    European Organisation for the Exploitation of Meteorological Satellites |  | 2020-09-21 | 
|  | [ 47 ] 
 | Further element towards revision of Recommendation ITU-R RS.1861-0 | European Space Agency
          	    ,
        	    European Organisation for the Exploitation of Meteorological Satellites |  | 2020-09-21 | 
|  | [ 46 ] 
 | Elements for possible sharing studies in the context of WRC-23 agenda item 1.2 involving EESS (passive) sensors in the 6 425-7 250 MHz range | European Space Agency | AI1.2 | 2020-09-21 | 
|  | [ 45 ] 
 | Proposed draft reply liaison statement to Working Party 5D | France | AI1,2 | 2020-09-21 | 
|  | [ 44 ] 
 | Work plan for working document towards a preliminary draft new ITU-R Report  - Analysis of interference received by EESS (passive) sensors [IN THE 18.6 18.8 GHZ BAND] [CAUSED BY SURFACE WATHER REFLECTIONS] - Proposed Work Plan | Institute of Electrical and Electronics Engineers, Inc. |  | 2020-09-20 | 
|  | [ 43 ] 
 | Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction | Institute of Electrical and Electronics Engineers, Inc. |  | 2020-09-20 | 
|  | [ 42 ] 
 | Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction | European Space Agency |  | 2020-09-18 | 
|  | [ 41 ] 
 | Preliminary draft new Report ITU-R RS.[RF_SURVEY_SMOS] | European Space Agency |  | 2020-09-18 | 
|  | [ 40 ] 
 | Proposed liaison statement from Working Party 7C to Working Party 5D regarding WRC-23 agenda item 1.2 | United States of America | AI1.2 | 2020-09-18 | 
|  | [ 39 ] 
 | Review of typical technical and operational characteristics of Earth exploration satellite service (passive) systems contained in the preliminary draft revision of Recommendation ITU-R RS.1861 | United States of America |  | 2020-09-18 | 
|  | [ 38 ] 
 | Reply liaison statement to Working Party 4A (copy for information to Working Party 3M, 4B, 4C, 5A, 5B, 5C, and 7B) - WRC-23 agenda item 1.16 | European Space Agency
          	    ,
        	    European Organisation for the Exploitation of Meteorological Satellites | AI1.16 | 2020-09-18 | 
|  | [ 37 ] 
 | Revisions to working document towards a preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors [IN THE 18.6-18.8 GHZ] [CAUSED BY SURFACE WATER REFLECTIONS] | European Space Agency |  | 2020-09-18 | 
|  | [ 36 ] 
 | Working document towards a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS] | Switzerland (Confederation of)
          	    ,
        	    France |  | 2020-09-18 | 
|  | [ 35 ] 
 | Elements related to WRC-23 agenda item 1.14 | European Space Agency
          	    ,
        	    European Organisation for the Exploitation of Meteorological Satellites | AI1.14 | 2020-09-18 | 
|  | [ 34 ] 
 | Working document towards a preliminary draft new Report ITU-R RS.[GLOBAL_SURVEY_SMAP_RFI] - Global survey of radio frequency interference observed by the SMAP radar in the 1 215-1 300 MHz band and the SMAP radiometer in the 1 400-1 427 MHz band | United States of America |  | 2020-09-14 | 
|  | [ 33 ] 
 | Working document towards a preliminary draft revised Report ITU-R RS.2455-1 | United States of America | AI1.12 | 2020-09-14 | 
|  | [ 32 ] 
 | Draft reply liaison statement to Wolrking Party 1A - Interference from broadcasting satellite receiving equipment into EESS (passive) remote sensors | United States of America |  | 2020-09-14 | 
|  | [ 31 ] 
 | Working document towards a preliminary draft new Report ITU-R RS.[GLOBAL_SURVEY_AQ_RFI] - Global survey of radio frequency interference observed by the Aquarius scatterometer in the 1 215-1 300 MHz band and the Aquarius radiometer in the 1 400-1 427 MHz band | United States of America |  | 2020-09-14 | 
|  | [ 30 ] 
 | Proposed liaison statement to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5C, 6A and 7D - Work to be conducted by Working Party 7C under agenda item 9.1 Topic A | United States of America |  | 2020-09-14 | 
|  | [ 29 ] 
 | Working document towards preliminary draft new Report ITU-R RS.[SW_INTERF_CRITERIA] - Interference criteria of receive only space weather sensors | United States of America |  | 2020-09-14 | 
|  | [ 28 ] 
 | Preliminary draft revised Report ITU-R RS.2456 - Space weather sensor systems using radio spectrum | United States of America |  | 2020-09-14 | 
|  | [ 27 ] 
 | Working document towards a preliminary draft new Report ITU-R RS.[SPEC_REQTS_RX_SPACE_WEATHER] - Spectrum requirements and applicable radio service designations for receive only space weather sensors that provide data critical for predictions and warnings | United States of America |  | 2020-09-14 | 
|  | [ 26 ] 
 | Proposed work plan for WRC-23 agenda item 9.1, Topic A | United States of America | AI9.1 | 2020-09-14 | 
|  | [ 25 ] 
 | Revision to preliminary draft new Report ITU-R RS.[EESS_SAR-RNSS] | United States of America |  | 2020-09-14 | 
|  | [ 24 ] 
 | Elements related to WRC-23 agenda item 1.14 - Studies related to possible EESS (passive) allocations in the frequency range 231.5-252 GHz | United States of America | AI1.14 | 2020-09-14 | 
|  | [ 23 ] 
 | Preliminary draft revision of Report ITU-R RS.2068-1 - Current and future use of the band 13.25 GHz by spaceborne active sensors | United States of America |  | 2020-09-14 | 
|  | [ 22 ] 
 | Proposal of draft reply liaison statement to Working Party 5D regarding agenda item1.4 | Brazil (Federative Republic of) | AI1.4 | 2020-09-14 | 
|  | [ 21 ] 
 | Proposed liaison statement to Working Party 5D on the studies related to RR No. 21.5 regarding AAS. | France |  | 2020-09-11 | 
|  | [ 20 ] 
 | Consideration on possible elements for a draft new Question ITU-R XX/1 - Protection of EESS (passive) remote sensors against interference caused by radiation from broadcasting-satellite receiving equipment | Japan |  | 2020-09-07 | 
|  | [ 19 ] 
 | Information on outline and basic concept of sharing and compatibility studies between FOD and Active/Passive Sensors conducted in Japan | Japan |  | 2020-09-07 | 
|  | [ 18 ] 
 | Proposed liaison statement to Working Party 4A regarding WRC-23 agenda item 9.1, d) - Request for clarification on the relevant non-GSO FSS technical characteristics concerning the protection of EESS (passive) in the frequency band 36-37 GHZ | Japan |  | 2020-09-07 | 
|  | [ 17 ] 
 | Proposals to  WP 7C participating WRC-23 action items | Russian Federation |  | 2020-09-03 | 
|  | [ 16 ] 
 | Interaction between WP 7C and WP 4A on the issue of study on compatibility between EESS (PASSIVE) systems operating in the 10.6-10.7 GHz and FSS systems operating in the frequency band 10.7-10.95 GHz | Russian Federation |  | 2020-09-03 | 
|  | [ 15 ] 
 | Relevance of the frequency band 10.6-10.7 GHz studies conducted under agenda item 1.15 | Germany (Federal Republic of) | AI1.15 | 2020-07-06 | 
|  | [ 14 ] 
 | Preliminary position on WRC-23 agenda | World Meteorological Organization |  | 2020-05-13 | 
|  | [ 13 ] 
 | Proposed liaison statement to Working Party 5D (copy to Working Parties 5B, 4A and 7B) | France |  | 2020-04-13 | 
|  | [ 12 ] 
 | Proposed draft reply liaison statement to Working Party 5D | Germany (Federal Republic of)
          	    ,
        	    France |  | 2020-04-14 | 
|  | [ 11 ] 
 | Proposed liaison statement to Working Party 5C | France |  | 2020-04-13 | 
|  | [ 10 ] 
 | Working document toward a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS] | France
          	    ,
        	    Switzerland (Confederation of) |  | 2020-04-13 | 
|  | [ 9 ] 
 | Proposed liaison statement to Working Party 6A | France |  | 2020-04-13 | 
|  | [ 8 ] 
 | Proposed liaison statement to Working Party 5A | France |  | 2020-04-13 | 
|  | [ 7 ] 
 | Views on the need to update the preliminary draft revision of Recommendation ITU-R RS.1861 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz | United States of America |  | 2020-04-13 | 
|  | [ 6 ] 
 | Liaison statement to Working Parties 4A, 4C, 5A, 5B and 5C (copy to Working Parties 3J and 3M for information) | United States of America | AI1.14 | 2020-04-13 | 
|  | [ 5 ] 
 | Draft reply liaison statement to ITU-R Working Party 3J - Earth surface bistatic scattering coefficient prediction | European Space Agency |  | 2020-04-13 | 
|  | [ 4 ] 
 | Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction | Institute of Electrical and Electronics Engineers, Inc. |  | 2020-04-10 | 
|  | [ 3 ] 
 | Lack of mutual planning between EESS (active) and RAS in design of the impending Earthcare 94 GHz cloud-profiling radar mission | Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science |  | 2020-04-08 | 
|  | [ 2 ] 
 | Contribution to Working Parties 7A, 7B, 7C and 7D on relevant agenda item of WRC-23 | Iran (Islamic Republic of) |  | 2020-03-23 | 
|  | [ 1 ] 
 | Reply liaison statement to ITU-R Working Party 5B (copy for information to Working Party 7C) - Deployment of Foreign Object Debris Detection Radars in the 92-100 GHz frequency range at airports globally | International Civil Aviation Organization |  | 2020-03-02 | 
| Resultats:348 documents Résultats :
  Précédent - 
	1 - 
     	2 - 
     	3 - 
     	4 - 
     	5 - 
     	6 - 
     	7 | 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):