International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

Environment, climate action, circular economy and electromagnetic fields

Study Period 2025

Results:567 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 267 ]  
 
The updated draft of L.Carbon_DA "Guidelines for Data Annotation for Carbon emissions Verification Knowledge Graph"     China Information Communication Technologies Group , State Grid Corporation of China   Q9/5   2025-10-16
[ 266 ]  
 
Updated Baseline text for draft of Technical Report ITU-T L.TR_GHG_DR "Mechanism and framework of power grid demand response based on GHG emission factor"     China Telecommunications Corporation , State Grid Corporation of China , Tsinghua University (China)   Q11/5   2025-10-16
[ 265 ]  
(Rev.1) 
Proposed revision of K.Supple.25 "ITU-T K.117 - Long reach single twisted-pair Ethernet resistibility testing"     NTT, Inc. (Japan)   Q2/5   2025-10-16
[ 264 ]  
 
Proposal of a new work item on the use of DPPs for ICTs and Extended Producer Responsibilities     United Nations Environment Programme   Q7/5   2025-10-17
[ 263 ]  
(Rev.1) 
Discussion for revision of K.21 and proposed integrated baseline text for K.21 draft revision     NTT, Inc. (Japan)   Q2/5   2025-10-16
[ 262 ]  
(Rev.1) 
Consideration of Terminologies regrading EM securities pointed out by SCV     NTT, Inc. (Japan)   Q8/5, Q1/5   2025-10-16
[ 261 ]  
 
Proposed a new work item on draft Recommendation ITU-T K. pofc " Practical guidance on the protection of optical fibre cables"     China Unicom   Q1/5   2025-10-16
[ 260 ]  
(Rev.1) 
Baseline text of draft new Recommendation ITU-T K.devices: "RF-EMF exposure assessment of devices operating close to the human body" and consideration of this draft new Recommendation for consent during the SG-5 meeting.     Agencia Nacional de Telecomunicacoes - ANATEL (Brazil) , Ministry of Communications, Department of Telecommunications (India)   Q3/5   2025-10-16
[ 259 ]  
 
A Review of surge pulses recommended for copper Ethernet ports testing in EMC and Safety standards.     Cisco Systems, Inc. (United States)   Q2/5   2025-10-15
[ 258 ]  
(Rev.1) 
Guidance for Draft Recommendation ITU-T L.1450rev "Methodologies for the assessment of the environmental impact of the information and communication technology sector" on defining the boundaries of IoT with respect to ICT.     Autorite de Regulation des Communications electroniques et des Postes (ARCEP) (France)   Q9/5   2025-10-15
[ 257 ]  
(Rev.1) 
Guidance for Draft Recommendation ITU-T L.1450rev "Methodologies for the assessment of the environmental impact of the information and communication technology sector": addressing remaining identified gaps     Autorite de Regulation des Communications electroniques et des Postes (ARCEP) (France)   Q9/5   2025-10-15
[ 256 ]  
(Rev.1) 
Guidance for Draft Recommendation ITU-T L.1450rev "Methodologies for the assessment of the environmental impact of the information and communication technology sector" on approaches for assessing the inventory of Internet of Things (IoT) devices.     Autorite de Regulation des Communications electroniques et des Postes (ARCEP) (France)   Q9/5   2025-10-15
[ 255 ]  
(Rev.1) 
Guidance for Draft Recommendation ITU-T L.1450rev "Methodologies for the assessment of the environmental impact of the information and communication technology sector" on telecommunication satellite activities boundaries     Autorite de Regulation des Communications electroniques et des Postes (ARCEP) (France)   Q9/5   2025-10-15
[ 254 ]  
(Rev.1) 
Guidance for Draft Recommendation ITU-T L.1450rev "Methodologies for the assessment of the environmental impact of the information and communication technology sector" on embodied emissions depreciation     Autorite de Regulation des Communications electroniques et des Postes (ARCEP) (France)   Q9/5   2025-10-15
[ 253 ]  
 
Proposed new work item on draft Recommendation L.EC&MM-IoTD "Energy consumption metrics and measurement methodology of constrained IoT sensor devices in smart grid"     China Information Communication Technologies Group , Korea (Rep. of) , State Grid Corporation of China   Q6/5   2025-10-15
[ 252 ]  
 
Draft Recommendation ITU-T K.calibr "Calibration for equipment for the EMF assessment"-A calibration method using anechoic chamber from 450 MHz to 40 GHz     China Academy of Information and Communications Technology , China Information Communication Technologies Group   Q3/5   2025-10-15
[ 251 ]  
 
Proposed new work item on technical report L. TR_PET_DC "Application of power electronic transformers for reducing energy consumption and carbon emissions in data centers"     China Telecommunications Corporation , China Unicom   Q6/5   2025-10-15
[ 250 ]  
(Rev.1) 
Revision of K.63 "Maintaining the suitability of production telecommunications equipment to its intended electromagnetic environment"     Nokia Corporation (Finland)   Q4/5   2025-10-15
[ 249 ]  
(Rev.1-2) 
Proposal to add the baseline text for the work item ITU-T L.EW_INT_ACT "E-Waste Lifecycle Integrity and Accountability"     Ministry of Communications, Department of Telecommunications (India)   Q7/5   2025-10-15
[ 248 ]  
(Rev.1) 
Proposal to update the baseline text for draft Recommendation ITU-T L.DPIS "Guidelines for a modular and scalable data system design of Digital Product Information Systems (DPIS) for ICT products "     Ministry of Communications, Department of Telecommunications (India)   Q7/5   2025-10-15
[ 247 ]  
(Rev.1) 
Proposal to initiate New Work Item for draft Recommendation ITU-T L.CETV "Framework for Mainstreaming Circular Economy Principles across the Telecom Sector Value Chain"     Ministry of Communications, Department of Telecommunications (India)   Q7/5   2025-10-15
[ 246 ]  
(Rev.1) 
Proposal for new work item for draft new Recommendation ITU-T L.RRTE "Guidelines for Advancing Resource Recovery from end-of-life Telecom Equipment "     Ministry of Communications, Department of Telecommunications (India)   Q7/5   2025-10-15
[ 245 ]  
(Rev.1) 
Baseline text for draft new Recommendation K.calibr "Calibration for equipment for the EMF assessment"     Ministry of Communications, Department of Telecommunications (India)   Q3/5   2025-10-15
[ 244 ]  
(Rev.1) 
Small base stations - impact on the overall exposure level     Autorite de Regulation des Communications Electroniques et de la Poste (ARCEP-BENIN) (Benin)   Q3/5   2025-10-14
[ 243 ]  
(Rev.1) 
Revision of K.59 "Electromagnetic compatibility, resistibility and safety requirements and procedures for connection to unbundled cables"     Nokia Corporation (Finland)   Q4/5   2025-10-14
[ 242 ]  
(Rev.1) 
Revision of K.58 "EMC, resistibility and safety requirements and guidance for determining responsibility under co-located information and communication technology installations"     Nokia Corporation (Finland)   Q4/5   2025-10-14
[ 241 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input to clarifications to Annex M - input to joint e-meeting 9 October 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 240 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input to updates related to software development - input to e-meeting 9 October 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 239 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input to updates to Figure X4 in section 4.4 - input to e-meeting 9 October 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 238 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input proposing clarifications to new annex on examples of acceptable similarities between products - input to joint e-meeting 3 October 3 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 237 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input proposing clarifications around Figure X4 in section 4.4 - input to joint e-meeting 3 October 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 236 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input proposing changed order of the approaches included - input to joint meeting 18 September 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 235 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input proposing to add an annex including examples of acceptable similarities between products     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 234 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input proposing to close editorial notes in Annex G and L and add clarifications - input to joint meeting 18 September 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 233 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input proposing to close editorial notes in section 5.2 and add clarifications - input to joint meeting 18 September 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 232 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input to section 4.3-4.5 with aim to clarify and input to Annex M - input to joint meeting September 18 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 231 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson contribution adding clarification to 5.5.2 - input to joint meeting 18 September 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 230 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input on a new Appendix explaining the relationship between approaches based on number of product parameters - input to joint e-meeting on 7 July 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 229 ]  
(Rev.1) 
Draft Recommendation L.SimplifiedLCA - Ericsson input to Section 6.4 and 6.5 related to applicability, limitations and flow charts - input to joint e-meeting on 7 July 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 228 ]  
(Rev.1) 
Draft Recommendation L.simplifiedLCA - Ericsson input to Appendix on unit processes- input to joint e-meeting on 7 July 2025     Telefon AB - LM Ericsson (Sweden)   Q9/5   2025-10-14
[ 227 ]  
(Rev.1) 
Latest baseline text of ITU-T L.1210 (Revision) "Sustainable power-feeding solutions for 5G networks" - Proposal for consent     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q6/5   2025-10-14
[ 226 ]  
 
Examining in impact of exclusion zones and compliance distances on telecommunication network development     Communication and Information Technology Regulatory Authority (CITRA) (Kuwait) , Oman Telecommunications Regulatory Authority (TRA) , Regulatory Authority of Post and Electronic Communications (ARPCE) (Algeria) , Telecommunications and Post Regulatory Authority (Sudan)   Q3/5   2025-10-14
[ 225 ]  
 
Swiss Authorization Process for Mobile Base Stations     Office federal de la communication (OFCOM) (Switzerland)   Q3/5   2025-10-14
[ 224 ]  
 
Proposed new work item on draft Recommendation L.optim_DC-"Methodologies of optimization for multi-level thermal environment of Data Centre"     China Telecommunications Corporation   Q6/5   2025-10-14
[ 223 ]  
(Rev.1) 
Proposed new work item on draft recommendation ITU-T L.CRT-Eol- guidelines for sustainable management and safe disposal of CRT waste     Ministry of Communications and Information Technology, Egypt   Q7/5   2025-10-14
[ 222 ]  
(Rev.1) 
Proposal for the 1st baseline text on ITU-T L.ups_framework "Management system framework of UPS with Li-ion batteries for infrastructure"     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q11/5   2025-10-14
[ 221 ]  
(Rev.1) 
Editing on K.21 internal Ethernet port surge test     China Information Communication Technologies Group , ZTE Corporation (China)   Q2/5   2025-10-14
[ 220 ]  
(Rev.1) 
Discussion on K.21 Internal ethernet port insulation resistance test and differential mode surge test     China Information Communication Technologies Group , ZTE Corporation (China)   Q2/5   2025-10-14
[ 219 ]  
(Rev.1) 
Draft recommendation on K.RIS_EMC "Electromagnetic compatibility requirements and measurement methods for Reconfigurable Intelligent Surface"     China Academy of Information and Communications Technology , China Information Communication Technologies Group , China Telecommunications Corporation , ZTE Corporation (China)   Q4/5   2025-10-14
[ 218 ]  
 
Proposal of the updated A.1 Justification for L.EEIoT     Korea (Rep. of)   Q6/5   2025-10-14
Results:567 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2026-10-01