Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 259 ]
|
Elements on Ku GSO networks protection
|
Luxembourg
|
|
2024-10-08 |
|
[ 258 ]
|
Epfd derivation by JTG 4-9-11
|
Luxembourg
|
|
2024-10-08 |
|
[ 257 ]
|
Evolution of GSO networks operations in Ku band
|
Luxembourg
|
|
2024-10-08 |
|
[ 256 ]
|
Topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time
|
Saudi Arabia
,
Egypt
|
AI7
|
2024-10-08 |
|
[ 255 ]
|
Elements regarding the service area towards a working document on WRC-27 agenda item 1.5
|
Saudi Arabia
|
AI1.5
|
2024-10-08 |
|
[ 254 ]
|
Information on evolution of GSO characteristics in 17.8-20.2 GHz and 27.5-30 GHz frequency band and impact of non-GSO interference on GSO networks with ACM - relevant technical information for consideration to the study on epfd limits in RR Article 22
|
Indonesia
|
|
2024-10-08 |
|
[ 253 ]
|
Proposed revisions to Annex 16 on the fifty-four meeting Working Party 4A of the Chair's Report
|
Indonesia
|
|
2024-10-08 |
|
[ 252 ]
|
Preliminary views within WRC-27 agenda item 1.5
|
Indonesia
|
AI1.5
|
2024-10-08 |
|
[ 251 ]
|
GSO FSS/BSS reference links used in ITU-R studies in 1995-2000 to derive the existing RR Article 22 epfd limits
|
Director, BR
|
|
2024-10-09 |
|
[ 250 ]
|
Analysis of space frequency assignments recorded under RR No. 11.41
|
Director, BR
|
|
2024-10-09 |
|
[ 249 ]
|
Reply liaison statement to Working Party 4A (copied for information to Study Groups 4, 5 and 7) - Activities in response to Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)
|
WP 7B
|
|
2024-10-09 |
|
[ 248 ]
|
Liaison statement to Working Party 4A regarding WRC-27 agenda item 1.6
|
WP 7B
|
AI1.6
|
2024-10-09 |
|
[ 247 ]
|
Resolution ITU-R 74 (space sustainability) - Brazilian Law on National Space Activities and proposal related to reducing information asymmetries on spectrum and orbital resources occupancy under Resolution ITU-R 74 Handbook
|
Brazil
|
|
2024-10-08 |
|
[ 246 ]
|
Brazil's views on two proposed topics for WRC-27 agenda item 7
|
Brazil
|
AI7
|
2024-10-08 |
|
[ 245 ]
|
Proposal for addition in table of contents of the preliminary draft handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
|
Germany
|
|
2024-10-08 |
|
[ 244 ]
|
Technical considerations on contributions for all sidelobes in Recommendation ITU-R S.1503
|
Germany
|
|
2024-10-08 |
|
[ 243 ]
|
Technical study of GSO link degradations at selected WCG and NON-WCG locations
|
Germany
|
|
2024-10-08 |
|
[ 242 ]
|
Proposed topic under WRC-27 agenda item 7 - Additional measures for the enhancement of equitable access to additional uses in RR Appendices 30 and 30A Regions 1 and 3
|
Angola
,
Botswana
,
Dem. Rep. of the Congo
,
Eswatini
,
Lesotho
,
Madagascar
,
Malawi
,
Mauritius
,
Mozambique
,
Namibia
,
Seychelles
,
South Africa
,
Tanzania
,
Zambia
,
Zimbabwe
|
AI7
|
2024-10-08 |
|
[ 241 ]
|
Proposed topic under WRC-27 agenda item 7 - Possible measures to enhance long-term protection and sustainable development of broadcasting-satellite service in Regions 1 and 3 Plan band against FSS in Region 2, and vice versa
|
Iran (Islamic Republic of)
|
AI7
|
2024-10-08 |
|
[ 240 ]
|
Reply liaison statement to Working Party 4A (copy to Working Party 5B) - Characteristics of space research service systems operating in the 13.75-14.0 GHz band
|
WP 7B
|
AI1.2
|
2024-10-08 |
|
[ 239 ]
|
Elements of working document relating to WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service
|
United States
|
AI1.1
|
2024-10-08 |
|
[ 238 ]
|
Proposed updates to working document - Elements on mitigation measures between FSS and IMT in the frequency band 3 400-3 600 MHz
|
United States
|
|
2024-10-08 |
|
[ 237 ]
|
Working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO-STUDIES]
|
United States
|
|
2024-10-08 |
|
[ 236 ]
|
Reply liaison statement to Working Parties 7C and 7D on WRC-27 agenda item 1.18
|
United States
|
AI1.18
|
2024-10-08 |
|
[ 235 ]
|
Reply liaison statement to Working Party 5C - WRC-27 agenda item 1.10
|
United States
|
AI1.10
|
2024-10-08 |
|
[ 234 ]
|
Proposed revisions to the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO-GSO]
|
United States
|
|
2024-10-08 |
|
[ 233 ]
|
Working document towards a preliminary draft revision of Recommendations ITU-R S.1428-1 and ITU-R BO.1443 - Reference FSS and BSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands between 10.7 GHz and 30 GHz
|
United States
|
|
2024-10-08 |
|
[ 232 ]
|
Possible measures to enhance protection and sustainable development of broadcasting-satellite service in Regions 1 and 3 Plan band
|
United States
|
|
2024-10-08 |
|
[ 231 ]
|
Studies to support the next revision of Recommendation ITU-R S.1503-4
|
United States
|
|
2024-10-08 |
|
[ 230 ]
|
Draft reply liaison statement to Working Party 7C - Technical and operational characteristics of FSS systems for sharing and compatibility studies on WRC-27 agenda item 1.19
|
United States
|
AI1.19
|
2024-10-08 |
|
[ 229 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] - Study of non-GSO constellation pointing avoidance for accurate calculation of aggregate downlink epfd
|
United States
|
|
2024-10-08 |
|
[ 228 ]
|
Draft liaison statement to Working Party 7D - WRC-27 agenda item 1.16
|
United States
|
AI1.16
|
2024-10-08 |
|
[ 227 ]
|
Working document regarding consideration of possible measures to address the case of "Satellite hopping without moving" described in the RRB's Report to WRC-23
|
United States
|
|
2024-10-08 |
|
[ 226 ]
|
Proposed revisions to working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)
|
United States
|
AI1.2
|
2024-10-08 |
|
[ 225 ]
|
FSS system characteristics relevant to WRC-27 agenda item 1.7 studies
|
United States
|
AI1.7
|
2024-10-08 |
|
[ 224 ]
|
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
|
United States
|
|
2024-10-08 |
|
[ 223 ]
|
Sharing and compatibility study of FSS systems with SRS operating in the 13.75-14 GHz frequency range
|
Ghana
|
AI1.2
|
2024-10-07 |
|
[ 222 ]
|
Sharing and compatibility study of FSS systems with RLS operating in the 13.75-14 GHz frequency range
|
Ghana
|
|
2024-10-07 |
|
[ 221 ]
(Rev.1) |
Statistics and information on FSS networks in Region 2 sharing the 11.7-12.2 GHz frequency band with the BSS plan in Regions 1 and 3
|
Director, BR
|
|
2024-10-08 |
|
[ 220 ]
|
Issues from report of the Director to WRC-23 relevant to Appendices 30, 30A and 30B of the Radio Regulations
|
Director, BR
|
|
2024-10-08 |
|
[ 219 ]
|
Proposal for working document towards draft CPM text for WRC-27 agenda item 1.5
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI1.5
|
2024-10-07 |
|
[ 218 ]
|
ITU role in ensuring long-term sustainability of outer space activities
|
Russian Federation
|
|
2024-10-07 |
|
[ 217 ]
|
Proposals for WRC-27 agenda item 1.4
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI1.4
|
2024-10-07 |
|
[ 216 ]
|
Contribution to Working Party 4A on WRC-27 agenda item 1.5
|
Iran (Islamic Republic of)
|
AI1.5
|
2024-10-06 |
|
[ 215 ]
|
Proposals to working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING]
|
Russian Federation
|
|
2024-10-04 |
|
[ 214 ]
|
FSS protection criteria for sharing studies under WRC-27 agenda item 1.7
|
Russian Federation
|
AI1.7
|
2024-10-04 |
|
[ 213 ]
|
Proposals to include a new topic under WRC-27 agenda item 7: "potential measures to govern application of RR No. 4.4"
|
Russian Federation
|
AI7
|
2024-10-04 |
|
[ 212 ]
|
Proposed modifications to the working document towards draft CPM text for WRC-27 agenda item 1.5
|
Russian Federation
|
AI1.5
|
2024-10-04 |
|
[ 211 ]
|
Proposed modifications to the elements on a working document related to the operation and functionalities of NCMC for ESIMS on WRC-27 agenda item 1.1
|
Russian Federation
|
AI1.1
|
2024-10-04 |
|
[ 210 ]
|
Proposed modifications of the elements to working document towards preliminary draft new Report ITU-R on WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service
|
Russian Federation
|
AI1.1
|
2024-10-04 |
Results:559 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):