Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 27 ]
|
Comparison of measurements with prediction using Recommendation ITU-R P.1546 below 3 GHz and up to 6 GHz
|
ORANGE POLSKA S.A.
|
|
2016-06-10 |
|
[ 26 ]
|
Building entry loss measurements at 3, 10 and 17 GHz frequencies
|
Orange
|
|
2016-06-10 |
|
[ 25 ]
|
The location variability of UHF signals at rooftop height proposed revision to Recommendations ITU-R P.1812-4 and ITU-R P.1546-5
|
United Kingdom of Great Britain and Northern Ireland
|
|
2016-06-10 |
|
[ 24 ]
|
Discussion paper - A geometry-based statistical model of millimetric slant-path urban shielding for terminals in street canyons
|
United Kingdom of Great Britain and Northern Ireland
|
|
2016-06-10 |
|
[ 23 ]
|
Proposed liaison statement to Working Party 6A - Ducting effects on received signal quality of digital TV services
|
Australia
|
|
2016-06-10 |
|
[ 22 ]
|
Estimating ducting effects from received signal quality of digital TV services
|
Australia
|
|
2016-06-10 |
|
[ 21 ]
|
Propagation measurements in the candidate IMT-2020 frequency bands from Resolution 238 (WRC-15)
|
Canada
|
|
2016-06-10 |
|
[ 20 ]
|
Comparison of the results of path loss for indoor office environment
|
ORANGE POLSKA S.A.
|
|
2016-06-09 |
|
[ 19 ]
|
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15
|
WP 1A
|
AI1.15
|
2016-06-08 |
|
[ 18 ]
(Rev.1) |
Mathworks (R) MATLAB implementation of Recommendation ITU-R P.1546-5
|
Switzerland (Confederation of)
,
LS telcom AG
,
ORANGE POLSKA S.A.
|
|
2016-05-26 |
|
[ 17 ]
|
Document re-assigned to Working Party 3M
|
Poland (Republic of)
|
|
2016-05-25 |
|
[ 16 ]
|
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16
|
WP 5A
|
AI1.16
|
2016-05-25 |
|
[ 15 ]
|
Liaison statement to Working Party 3K - On the Doppler effect in railway radiocommunication systems between high-speed trains and tracksides
|
WP 5A
|
|
2016-05-25 |
|
[ 14 ]
|
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda 1.1
|
WP 5A
|
AI1.1
|
2016-05-25 |
|
[ 13 ]
|
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13
|
TG 5/1
|
AI1.13
|
2016-05-25 |
|
[ 12 ]
|
Liaison statement to External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5A and 5D, 7C and 7D) - Technical and operational characteristics of the fixed service applications and their spectrum needs associated with work on WRC-19 agenda item 1.15
|
WP 5C
|
AI1.15
|
2016-05-24 |
|
[ 11 ]
|
Liaison statement to Working Parties 3K & 3M (copy for information to Working Parties 5A, 5C, 5D, 4A, 4C, 7B and 7D) - Questions for Working Parties 3K and 3M on ITU-R propagation Recommendations used by Working Party 5B
|
WP 5B
|
|
2016-05-23 |
|
[ 10 ]
|
Liaison statement to Working Parties 3K and 3M - Earth-to-space propagation in the 17.3-20.2 GHz, 27.0-30.0 GHz, 37.5-43.5 GHz, 47.2-50.2 GHz, 50.4-51.4 GHz, 71-76 GHz and 81-86 GHz frequency bands
|
WP 4B
|
|
2016-04-25 |
|
[ 9 ]
|
Liaison statement to Working Party 3M (copy to Working Parties 3K and 5D) - Studies related to coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz
|
WP 4C
|
|
2016-04-25 |
|
[ 8 ]
|
Liaison statement to Working Parties 3J, 3K and 3M concerning propagation models for aeronautical mobile (copy to Working Party 5B For information)
|
WP 7B
|
|
2016-04-12 |
|
[ 7 ]
|
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)
|
WP 7D
|
|
2016-04-11 |
|
[ 6 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties
|
Chairman, CCV
|
|
2016-04-01 |
|
[ 5 ]
|
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 4C) -
Propagation model for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band
|
WP 5D
|
|
2016-03-09 |
|
[ 4 ]
|
Liaison statement to Working Parties 3J, 3K and 3M: Channel model(s) for the evaluation of IMT-2020 candidate technologies in frequency bands up to 100 GHz
|
WP 5D
|
|
2016-03-09 |
|
[ 3 ]
|
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1
|
WP 6A
|
AI1.1
|
2016-02-03 |
|
[ 2 ]
|
Liaison statement on new ITU-T SG 20
|
ITU-T SG 20
|
|
2015-12-15 |
|
[ 1 ]
|
Documents to be carried over from the 2012-2015 study period
|
WP 3K
|
|
2015-12-08 |
Results:327 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
|
Multiple Document Download: Formats and Languages to be included (when available):