Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 15 ]
|
Preliminary draft revision of Recommendation ITU-R SA.1026-3 - Aggregate interference criteria for space-to-earth data transmission systems operating in the Earth exploration-satellite and meteorological-satellite services using satellites in low-earth orbit
|
United States of America
|
139/7, 141/7
|
2008-03-21 |
|
[ 14 ]
|
Sharing study between the AMS and the SRS in the 37-38 GHz band
|
France
|
211/7
|
2008-03-21 |
|
[ 13 ]
|
Proposal for a preliminary draft new Recommendation regarding efficient use of the band 25.5 - 27.0 GHz for future space-to-Earth and space-to-space science applications
|
European Space Agency (ESA)
|
139-3/7
|
2008-03-19 |
|
[ 12 ]
(Rev.1) |
WRC-11 AI 1.6: Review No. 5.565 (Passive sensing 275-3 000 GHz) and optical links
|
European Space Agency
|
|
2008-03-18 |
|
[ 11 ]
|
Structure of Study Group 7 and its Working Parties
|
Chairman, SG 7
|
|
2008-03-13 |
|
[ 10 ]
|
Organization of Working Party 7B and terms of reference of its Working Groups
|
Chairman, WP 7B
|
|
2008-03-06 |
|
[ 9 ]
|
Liaison statement to WP 4A (copied to WPs 3M, 5A, 5B, 7B and 7C) - Gateway links for high altitude platforms stations in the range from 5 850 to 7 075 MHz
|
WP 5C
|
|
2008-02-19 |
|
[ 8 ]
|
Liaison statement to Working Parties 1A, 4A, 7B, 7C and 7D - WRC-11 Agenda item 1.8 - consideration of technical and regulatory issues relative to the fixed service in the bands between 71 GHz and 238 GHz
|
WP 5C
|
|
2008-02-19 |
|
[ 7 ]
|
Recommendation to be brought to the attention of Study Groups 3, 4 and 7
|
BR, Study Group Department
|
|
2008-02-18 |
|
[ 6 ]
|
Liaison statement to Study Groups 4 and 7 (WPs 4A, 4C, 7B and 7D) - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 5C
|
|
2008-02-18 |
|
[ 5 ]
|
Liaison statement to Working Party 7B - WRC-11 Agenda item 1.11
|
WP 5C
|
|
2008-02-11 |
|
[ 4 ]
|
Liaison statement to ITU-R Working Party 7B - WRC-11 Agenda item 1.24
|
WP 5C
|
|
2008-02-11 |
|
[ 3 ]
|
Liaison statement to Working Parties 5B and 7B - WRC-11 Agenda item 1.12
|
WP 5C
|
|
2008-02-08 |
|
[ 2 ]
|
Preparation of the CPM Report to WRC-11 following the results of the first session of CPM-11
|
Chairman, CPM-11
|
|
2008-01-29 |
|
[ 1 ]
|
Documents to be carried over from the 2003-2007 Study period
|
WP 7B
|
|
2007-11-19 |
Results:315 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
|
Multiple Document Download: Formats and Languages to be included (when available):