Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Transport, access and home

Période d'études 2017

Resultats:2858 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 108 ]  
 
An example of 5G transport network application scenario     China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-05
[ 107 ]  
 
Performance updates on reference clocks for eEEC     Rakon Limited   Q13/15   2017-06-05
[ 106 ]  
 
Proposal for ROADM related parameters in G.672     FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q7/15   2017-06-05
[ 105 ]  
 
Consideration on the management for SDN control of transport networks     China Telecommunications Corporation   Q14/15, Q12/15   2017-06-05
[ 104 ]  
 
OMCI management support for XGS-PON     China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q2/15   2017-06-05
[ 103 ]  
 
Consideration on performance and fault management in draft G.7702     China Telecommunications Corporation   Q14/15, Q12/15   2017-06-05
[ 102 ]  
 
Proposal for G.8151 study points     China Mobile Communications Corporation   Q14/15   2017-06-05
[ 101 ]  
 
Proposed text for Clause 6.4 of draft G.7702     China Telecommunications Corporation   Q14/15, Q12/15   2017-06-05
[ 100 ]  
 
Proposals for open items in G.9807.1 Amd1     China Telecommunications Corporation , FiberHome Technologies Group (China) , Futurewei Technologies US R&D Center (United States) , ZTE Corporation (China)   Q2/15   2017-06-05
[ 99 ]  
 
Comments on 5G transport over OTN     KDDI Corporation (Japan)   Q11/15   2017-06-05
[ 98 ]  
 
Proposed Input about Network Slicing to draft G.7702     ZTE Corporation (China)   Q12/15   2017-06-05
[ 97 ]  
 
Proposal for a new G.984.5 Amd to study integrated WDM1r method and other coexistence items     China Telecommunications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q2/15   2017-06-05
[ 96 ]  
 
Proposed functional model for interconnected rings in the draft G.8132/Y.1383     Ministry of Science, ICT and Future Planning (MSIP)   Q9/15   2017-06-05
[ 95 ]  
 
G.8275.2 BMCA Cycling avoidance method     Cisco Systems, Inc. (United States)   Q13/15   2017-06-04
[ 94 ]  
+Corr.1 
Proposal of methods and parameters of oscillator monitoring (G.Suppl. Sync OAM)     Microsemi Corporation (United States) , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2017-06-04
[ 93 ]  
 
Classification of synchronization network operation for failure cases (G.Suppl.Sync OAM)     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2017-06-04
[ 92 ]  
 
Proposal of description of PTP path monitoring in G.Suppl.Sync OAM     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2017-06-04
[ 91 ]  
 
G.8275.2 & G.8271.2 - Phase delivery over PTP unaware network     ADVA Optical Networking (United Kingdom)   Q13/15   2017-06-04
[ 90 ]  
 
Clarification on WD06-06 of the Q6 Sunnyvale Interim meeting Jan. 16-19, 2017     Coriant GmbH & Co. KG (Germany) , Deutsche Telekom AG (Germany) , Keysight Technologies Deutschland GmbH , Nokia   Q6/15   2017-06-04
[ 89 ]  
 
Twisted pair distribution cable measurements up to 110 MHz     Proximus PLC   Q4/15   2017-06-04
[ 88 ]  
 
G.8275.2 Deployment in Full PTP aware network     Cisco Systems, Inc. (United States)   Q13/15   2017-06-04
[ 87 ]  
 
Asymmetric latency measurement     IP Light   Q13/15, Q11/15   2017-06-04
[ 86 ]  
 
ODUk new delay measurement method     IP Light   Q13/15, Q11/15   2017-06-04
[ 85 ]  
 
G.811.1 ePRC Test Results     ADVA Optical Networking (United Kingdom)   Q13/15   2017-06-04
[ 84 ]  
 
Draft new Recommendation: Generic architecture of home networks for energy management     Fujitsu Limited (Japan) , Japan Advanced Institute of Science and Technology , Kanazawa Institute of Technology , Mitsubishi Electric Corporation , Oki Electric Industry Company Ltd. (OKI) , Panasonic Corporation   Q15/15   2017-06-04
[ 83 ]  
 
OSC requirement proposal     China Unicom , Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 82 ]  
 
Text proposal for ETY and FlexE layer atomic functions     Huawei Technologies Co., Ltd. (China)   Q11/15, Q10/15   2017-06-03
[ 81 ]  
 
OTN network slicing considerations     China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 80 ]  
(Rev.1) 
Application specific FlexO-LR port on router or other packet switch     China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 79 ]  
 
Considerations on timing transparency in application specific transport networks     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 78 ]  
 
Hybrid tributary slot granularity in application specific OTN solutions     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 77 ]  
 
MFI interface considerations     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 76 ]  
(Rev.1) 
Proposed text for 200G and 400G FlexO-SR in G.709.1     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 75 ]  
 
Restructuring G.709.1 clauses     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 74 ]  
 
Proposed text for new Annex I and J of G.709     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 73 ]  
 
OTUCn-M functional model and replacement signals     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 72 ]  
 
G.7044 revision comments     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 71 ]  
 
Proposed update of Appendix I/G.781     Huawei Technologies Co., Ltd. (China)   Q13/15, Q11/15   2017-06-03
[ 70 ]  
 
Support of OTSiA OH in existing OTN networks     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 69 ]  
 
Optical layer independent OTU adaptation functions in G.798     Huawei Technologies Co., Ltd. (China)   Q11/15   2017-06-03
[ 68 ]  
 
OCh and OTSiA OH associated with FlexO-LR     Huawei Technologies Co., Ltd. (China)   Q6/15, Q14/15, Q11/15   2017-06-03
[ 67 ]  
 
Consideration on FEC scheme for 200G/400G FlexO-LR     Inphi Corporation   Q11/15   2017-06-03
[ 66 ]  
 
n×25G FlexO-FR frame format, overhead and multiplexing structure     FiberHome Technologies Group (China)   Q11/15   2017-06-02
[ 65 ]  
(Rev.1) 
n×25G FlexO bit rate, FEC and client mapping options for next generation Mobile Fronthaul Transport     FiberHome Technologies Group (China)   Q11/15   2017-06-02
[ 64 ]  
 
Lite and Flexible OTN for next generation (5G) Mobile Fronthaul Transport     China Telecommunications Corporation , FiberHome Technologies Group (China)   Q11/15   2017-06-02
[ 63 ]  
 
FOICk.n framer module interfaces (MFI) in G.Sup58 Ed.2 revision     FiberHome Technologies Group (China)   Q11/15   2017-06-02
[ 62 ]  
 
Updating G.808.2 to better distinguish between circuit and packet applications     Coriant GmbH & Co. KG (Germany)   Q9/15   2017-06-02
[ 61 ]  
 
RE CT and ONU association detection in G.9807.2     Futurewei Technologies US R&D Center (United States)   Q2/15   2017-06-02
[ 60 ]  
 
G.sup.HSP requirement discussion     Futurewei Technologies US R&D Center (United States)   Q2/15   2017-06-02
[ 59 ]  
 
G.RoF physical layer and system requirements     Futurewei Technologies US R&D Center (United States)   Q2/15   2017-06-02
Resultats:2858 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2022-01-20