International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient orbit/spectrum utilization for FSS and BSS

Results:609 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 334 ]  
 
Sharing aspects for ISS systems in the band 22.55-23.55 GHz     European Space Agency (ESA)     2010-03-16
[ 333 ]  
 
Analytical methodology to evaluate interference into NGSO-to-NGSO ISS from emissions of SRS earth stations     European Space Agency (ESA)     2010-03-16
[ 332 ]  
 
Revision of Recommendation ITU-R SF.675     Canada     2010-03-15
[ 331 ]  
 
Working document towards a preliminary draft new Report ITU-R [SF].[STATMETH] - Possible implementation of methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz     Canada     2010-03-15
[ 330 ]  
 
Preliminary draft new Report ITU-R S.[GUIDE_PLAN] - Guidelines that may be used by administrations in the design of their systems for assessing the impact of rain attenuation on the carrier to noise plus interference ratios of the FSS Plan allotments     Canada   236/4   2010-03-15
[ 329 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks     Canada     2010-03-15
[ 328 ]  
 
Comparison of fading/enhancement due to scintillation and multipath mechanism and attenuation due to gaseous absorption for interference assessment from space-to-Earth emissions for frequency bands above about 17 GHz     Canada     2010-03-15
[ 327 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R [SF].[STATMETH] - Methodology for calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz     Canada     2010-03-15
[ 326 ]  
 
Preliminary draft new Report ITU-R S.[MAIN-LOBE] - Methodology on the modelling of earth station antenna gain in the region of the antenna main-lobe and the transition region between the minimum angle of the reference antenna pattern and the main-lobe     Canada     2010-03-15
[ 325 ]  
 
Proposed transfer of responsibility of Recommendation ITU-R SF.675 "Calculation of the maximum power density (averaged over 4 KHz) of an angle modulated carrier" from Study Groups 4 and 5 to Study Group 1     United States of America     2010-03-15
[ 324 ]  
 
Draft reply liaison to Working Party 7B     United States of America     2010-03-15
[ 323 ]  
 
Draft revision of Recommendation ITU-R S.1003-1 - Environmental protection of the geostationary-satellite orbit     United States of America     2010-03-15
[ 322 ]  
 
Draft liaison statement to Working Party 5B on WRC-12 Agenda item 1.3 - Use of FSS for unmanned aircraft     United States of America     2010-03-15
[ 321 ]  
 
Draft liaison statement to Working Party 5A - Compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band     United States of America     2010-03-15
[ 320 ]  
 
Reduction of the coordination arc applicable to FSS geostationary satellite networks operating in some congested portions of the 4/6 GHz and 14/10/11/12 GHz frequency bands     United States of America     2010-03-15
[ 319 ]  
 
Studies on compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band     SES WORLD SKIES     2010-03-15
[ 318 ]  
 
Compatibility studies between non-GSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11     Brazil (Federative Republic of)     2010-03-11
[ 317 ]  
 
Estimation of probability of causing harmful interference to FS terrestrial stations from geostationary BSS satellites in the frequency band 21.4-22.0 GHz     Russian Federation     2010-03-10
[ 316 ]  
 
Working document towards draft CPM text on WRC-12 Agenda item 1.13     Russian Federation     2010-03-10
[ 315 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.725 - Technical characteristics for very small aperture terminals (VSATs)     Russian Federation     2010-03-10
[ 314 ]  
 
Draft liaison statement to Working Party 5C - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz (WRC-12 Agenda item 1.20)     Netherlands (Kingdom of the)     2010-03-10
[ 313 ]  
 
WRC-12 Agenda item 1.13     Iran (Islamic Republic of) , Syrian Arab Republic     2010-03-08
[ 312 ]  
 
Liaison statement (copied to WP 5A for information) - Techniques to improve the compatibility or sharing between IMT systems and FSS networks in the 3.4-3.6 GHz band     WP 5D     2010-03-10
[ 311 ]  
 
Protection requirements claimed for ISS systems under WRC-12 Agenda item 1.11 compatibility studies and their potential impact on existing services     France     2010-03-04
[ 310 ]  
 
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13     Korea (Republic of)     2010-03-05
[ 309 ]  
 
Draft revision of Recommendation ITU-R BO.1776 - Reference power flux-density for the broadcasting-satellite service in the band 21.4-22.0 GHz in Regions 1 and 3     Korea (Republic of)     2010-03-05
[ 308 ]  
 
WRC Agenda item 8.1.3     Nigeria (Federal Republic of)     2010-03-04
[ 307 ]  
 
Comments on the proposed treatment of recommendations of former Working Party 6S     BR Study Group Department     2010-03-03
[ 306 ]  
 
Proposed draft response liaison statement to Working Party 7B - Parameters for use in conducting compatibility assessment of SRS (E-s) into HIBLEO-2 ISS in the band 22.55-23.15 GHz     Australia     2010-03-02
[ 305 ]  
 
Emergency and disaster relief telecommunications in Haiti     United States of America     2010-03-01
[ 304 ]  
 
ABU views on WRC-12 Agenda items 1.5 and 1.13     Asia-Pacific Broadcasting Union (ABU)     2010-02-26
[ 303 ]  
 
ITU/IDA Workshop on the efficient use of the spectrum/orbit resource (Singapore, 16-17 June 2010)     Director, BR     2010-03-01
[ 302 ]  
 
Draft Liaison statement to Working Parties 4A, 4C, 5A, and 6A (copy to Working Parties 5B, 5C, 7A, 7B, 7C and Study Group 3) on WRC-12 Agenda item 1.2     WP 1B     2010-02-17
[ 301 ]  
 
Liaison statement to Working Parties 1B, 3K, 4A, 5A, 5D, 6A and 7C     WP 1A     2010-02-12
[ 300 ]  
+Corr.1 
Additional information for the preparation of the draft CPM Report to WRC-12     Chairman, CPM-11     2010-01-22
[ 299 ]  
 
Liaison statement - Characteristics for gateway links for high altitude platform stations (HAPS) in frequency bands 5 850-7 075 MHz for use in sharing studies (WRC-12 Agenda item 1.20)     WP 5C     2009-12-17
[ 298 ]  
 
Liaison statement - Review of certain SF-series Recommendations     WP 5C     2009-12-17
[ 297 ]  
 
Liaison statement on WRC-12 Agenda item 7     SC-WP     2009-12-16
[ 296 ]  
 
Reply liaison statement to ITU-R Working Party 4A - Performance requirements for unmanned aircraft systems     WP 5B     2009-12-14
[ 295 ]  
 
Liaison statement to Working Party 1A (copy to Working Party 4A) - WRC-12 Agenda item 1.22     WP 6A     2009-12-08
[ 294 ]  
 
Liaison statement to Working Party 4A - Compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band     WP 5A     2009-12-08
[ 293 ]  
 
Liaison statement - Future revision of Recommendation ITU-R SF.675-2     WP 5C     2009-12-08
[ 292 ]  
 
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.13 (copy to WP 5A for information)     WP 5C     2009-12-08
[ 291 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 7B) - Considerations on protection criteria for NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11     WP 5C     2009-12-08
[ 290 ]  
 
Liaison statement to Working Party 4A - Requirements for broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3 under WRC-12 Agenda item 1.13     WP 6B     2009-12-08
[ 289 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7D and to the Working Party of the Special Committee - WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 5C     2009-12-04
[ 288 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 6B     2009-11-20
[ 287 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5C, 6B, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems.     WP 6A     2009-11-20
[ 286 ]  
 
Note from the Chairman of Working Party 5D to the Chairman of Study Group 4 (copy to the Chairman of Working Party 4A and the Chairman of Study Group 5) - Comments on draft new Recommendation ITU-R S.[IMT-PFD]     WP 5D     2009-11-09
[ 285 ]  
 
Liaison statement to Working Party 3M (copy for information to Working Party 4A) - Development of a Handbook on propagation information for the prediction of interference and coordination distance     WP 5D     2009-11-06
Results:609 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-04-12