Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 273 ]
(Rev.1) |
Draft new Recommendation - Characteristics of earth stations on board vessels (ESVs) operating in FSS networks in the frequency bands 14.0-14.5 GHz
|
United States of America
|
|
2001-10-03 |
|
[ 272 ]
|
Draft new Recommendation concerning Specifications for automating regulatory checks against Article S5 and other provisions of the Radio Regulations
|
United States of America
|
|
2001-10-03 |
|
[ 271 ]
|
Draft new Recommendation - Technical and operational characteristics of fixed-satellites operating in the 20-375 THz (15-0.8 um)
|
United States of America
|
|
2001-10-03 |
|
[ 270 ]
|
Proposed revision to the preliminary draft new Recommendation
|
Canada
|
|
2001-10-03 |
|
[ 269 ]
|
A performance comparison of Ku band versus frequencies above 17 GHz in the fixed satellite service for the use of telemetry, tracking and command (TT&C) above 17 GHz
|
Canada
|
|
2001-10-03 |
|
[ 268 ]
|
Aggregate interference from GSO HD-FSS satellite transmitters into a non-GSO satellite receiver
|
France
|
|
2001-10-03 |
|
[ 267 ]
|
Proposed liaison statement from WP 4A to WP 8D - Proposed elements for CPM text on Agenda item 1.11 on Sharing between AMSS and FSS 14-14.5 GHz
|
France
|
|
2001-10-03 |
|
[ 266 ]
|
Levels of unwanted emissions from space services falling into RAS bands
|
France
|
|
2001-10-03 |
|
[ 265 ]
|
Compatibility issue between space services and passive services such as Radio Astronomy
|
France
|
|
2001-10-03 |
|
[ 264 ]
|
Sharing situation between FSS (Earth-to-space) Earth stations and HDFSS (space-to-Earth) Earth stations in the band 47.2-50.2 GHz
|
France
|
|
2001-10-03 |
|
[ 263 ]
|
Passive intermodulation products in the band 47.2-50.2 GHz
|
France
|
|
2001-10-03 |
|
[ 262 ]
|
Proposed draft CPM text for WRC-03 agenda item 1.37
|
Japan
|
|
2001-10-03 |
|
[ 261 ]
|
Earth station on board vessels operated in the 14 GHz band
|
Japan
|
|
2001-10-03 |
|
[ 260 ]
|
Some considerations on unwanted emissions
|
Japan
|
|
2001-10-03 |
|
[ 259 ]
|
Proposed PDNR "Methodology for the calculation of the worst-case interf. levels from non-geos. fixed-satellite service systems using highly-elliptical orbits into geos. fixed-satellite service satellite networks operating in the 10 to 31 GHz ...
|
Japan
|
|
2001-10-03 |
|
[ 258 ]
|
The use of spread spectrum communications to facilitate sharing between uncoordinated earth stations of the high density fixed-satellite service (HD-FSS) and the fixed service (FS) in the band 17.7-19.7 GHz
|
France
|
|
2001-10-03 |
|
[ 257 ]
|
Off-axis e.i.r.p. density limitation for earth stations operated in the 30 GHz band
|
Japan
|
|
2001-10-03 |
|
[ 256 ]
|
Adaptive error-control coding as a method for improving FSS transmissions robustness against risk of FS interference in the 18 GHz band
|
France
|
|
2001-10-03 |
|
[ 255 ]
|
Proposal for the addition of the parameters for defining the "Active Arc" of the non-GSO satellite system employing the highly elliptical orbit into the APS4
|
Japan
|
|
2001-10-03 |
|
[ 254 ]
|
Working document towards a preliminary draft new Recommendation - Methodology for evaluation of interference among certain types of non-GSO FSS systems in situations where non in-line interference exists
|
Japan
|
|
2001-10-03 |
|
[ 253 ]
(Rev.1) |
On the impact of asymmetric aperture antennas in HD-FSS Earth stations
|
Brazil (Federative Republic of)
|
|
2001-10-03 |
|
[ 252 ]
+Add.1 |
Responses to Circular letter CA/99
|
BR Secretariat
|
|
2001-10-03 |
|
[ 251 ]
|
Liaison statement to WP's 4A for action and to WP's 6S, 7D and 8D for information
|
TG 1/7
|
|
2001-10-03 |
|
[ 250 ]
|
Liaison statement to WP's 4A, 6S, 7D, 7E and 8D
|
TG 1/7
|
|
2001-10-03 |
|
[ 249 ]
|
Liaison statement to Working Parties 4A, 6S, 8D, 9B and 9D - Measurement bandwidths for levels of unwanted emissions
|
TG 1/7
|
|
2001-10-03 |
|
[ 248 ]
|
Liaison statement to WP's 4A, 6S and 8D - Satellite unwanted emission levels
|
TG 1/7
|
|
2001-10-03 |
|
[ 247 ]
|
Liaison statement to Working Party 4A - Measurement of GSO satellite unwanted emissions
|
TG 1/7
|
|
2001-10-03 |
|
[ 246 ]
|
The role of Recommendations in the development of regulatory procedures for the application of operational efpd limits
|
United Kingdom of Great Britain and Northern Ireland
|
|
2001-10-03 |
|
[ 245 ]
|
Statistical evaluation of the interference from the Region 1 & 3 BSS plan to the Region 2 & 3 FSS based on several sharing criteria
|
France
|
|
2001-10-03 |
|
[ 244 ]
|
Agenda item 1.29 - Resolution 78 - Further consideration and proposed CPM text
|
France
|
|
2001-10-03 |
|
[ 243 ]
|
Agenda item 1.19 - Resolution 78 - Further considerations and proposed CPM text
|
France
|
|
2001-10-03 |
|
[ 242 ]
|
Definitions relating to high elliptical orbits for communication satellites
|
Russian Federation
|
|
2001-10-03 |
|
[ 241 ]
|
Super-geosynchronous satellite orbit systems 48 hr orbit
|
Israel (State of)
|
|
2001-10-03 |
|
[ 240 ]
|
Interference between BSS feeder-link transmitting earth stations and HDFSS receiving earth stations in the band 17.3-17.7 GHz
|
France
|
|
2001-10-03 |
|
[ 239 ]
|
Initial considerations on the regulatory aspects of HEO satellite systems (WRC-03 Agenda item 1.37)
|
France
|
|
2001-10-03 |
|
[ 238 ]
|
Considerations on the possible allocation of the band 17.3-17.7 GHz to the fixed-satellite service (space-to-Earth)
|
France
|
|
2001-10-03 |
|
[ 237 ]
|
Current regulatory situation of HD-FSS earth stations in bands shared with equal rights between FSS and terrestrial services or space service operating in the opposite direction of transmission
|
France
|
|
2001-10-03 |
|
[ 236 ]
|
Proposed revisions to PDNR ITU-R S.[ESV-CHARACTERISTICS]
|
Inmarsat
|
|
2001-10-03 |
|
[ 235 ]
|
Comments in responses to Circular Letter CAR/109
|
BR Secretariat
|
|
2001-10-03 |
|
[ 234 ]
|
Updating of certain maintained S-series and SNG-series Recommendations
|
BR Secretariat
|
|
2001-10-03 |
|
[ 233 ]
|
About automation of the satellite network examinations
|
Bulgaria (Republic of)
|
|
2001-10-03 |
|
[ 232 ]
|
The efficient spectrum/orbit utilization in the international regulatory environment with satellite filling backlog
|
Bulgaria (Republic of)
|
|
2001-10-03 |
|
[ 231 ]
|
Proposed draft structure for Chapter 4 of the CPM Report to WRC-03 including already developed preliminary draft text elements
|
Chapter Rapporteur
|
|
2001-10-03 |
|
[ 230 ]
|
Liaison statement to WPs 4A, 7C 8B, 8D and JRG 8A-9B - Sharing between altimeters operating in the Earth Exploration-Satellite Service (Active) and other services in the band 5 140-5 250 MHz
|
JTG 4-7-8-9
|
|
2001-10-03 |
|
[ 229 ]
|
Liaison statement to WP 8B, WP 7C, WP 4A and JRG 8A-9B
|
JTG 4-7-8-9
|
|
2001-10-03 |
|
[ 228 ]
|
Liaison statement to WP 7B and 4A on consideration of an analysis on the possible extension of the SRS co-primary 6 MHz band allocation under S5.503 by 4 MHz in the band 13.75-13.8 GHz
|
JTG 4-7-8
|
|
2001-10-03 |
|
[ 227 ]
|
Liaison statement to WP 4-9S and WP 4A- Satellite downlink fading
|
WP 3M
|
|
2001-10-03 |
|
[ 226 ]
|
Liaison statement to WP 4A concerning propagation aspect of the determination of coordination distance
|
WP 3M
|
|
2001-10-03 |
|
[ 225 ]
|
Liaison statement to ITU-R Working Parties 4A and 4B - Duration of fades and mean time between fades on satellite paths
|
WPs 3J and 3M
|
|
2001-10-03 |
|
[ 224 ]
|
Liaison statement to Working Party 4A concerning propagation models for use in simulation of GSO-non-GSO sharing scenarios
|
WPs 3J and 3M
|
|
2001-10-03 |
Results:548 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):