Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 208 ]
|
G.989.3, G.988: Channel Bonding Principles
|
ADTRAN (United States)
,
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2017-06-06 |
|
[ 207 ]
|
ITU-T GPON Co-Existence with Future IEEE 802.3ca PON Wavelength(s)
|
AT&T, Inc. (United States)
|
Q2/15
|
2017-06-06 |
|
[ 206 ]
(Rev.1) |
Network Slicing Considerations
|
Microsemi Corporation (United States)
,
Nokia USA
|
Q12/15, Q11/15, Q10/15
|
2017-06-05 |
|
[ 205 ]
(Rev.1) |
Recommendation G.9903 to be sent to consent
|
ERDF
|
Q15/15
|
2017-06-05 |
|
[ 204 ]
|
Noise generation requirement in G.8262.1
|
Qulsar, Inc.
|
Q13/15
|
2017-06-05 |
|
[ 203 ]
(Rev.1) |
Send Recommendation G.9901 to determination
|
ERDF
|
Q15/15
|
2017-06-05 |
|
[ 202 ]
|
Packet selection implication in G.8273.2
|
Qulsar, Inc.
|
Q13/15
|
2017-06-05 |
|
[ 201 ]
(Rev.1) |
Verizon OpenOMCI Specification
|
ADTRAN (United States)
,
Broadcom Corporation (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Intel Corporation (United States)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2017-06-05 |
|
[ 200 ]
|
G.988: New and modified MEs in support of NG-PON2 and NG-PON2 interop
|
ADTRAN (United States)
,
Broadcom Corporation (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Intel Corporation (United States)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2017-06-05 |
|
[ 199 ]
|
G.8271.1 : Editor's Corrections
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 198 ]
|
G.8271.2: Editor's Corrections
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 197 ]
|
G.8271: Editor's Corrections
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 196 ]
|
Correction to QL values for new clocks, Option II Networks - G.8264
|
Nokia USA
|
Q13/15
|
2017-06-05 |
|
[ 195 ]
(Rev.1) |
Support of clearing counters for legacy type PM MEs
|
Calnex Solutions Limited (United Kingdom)
|
Q2/15
|
2017-06-05 |
|
[ 194 ]
(Rev.1) |
Support of Extended VLAN filtering type for upper layer protocols
|
Calnex Solutions Limited (United Kingdom)
|
Q2/15
|
2017-06-05 |
|
[ 193 ]
(Rev.1) |
G.vdsl: Proposed changes in Annex D and main body for LR-VDSL
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-05 |
|
[ 192 ]
(Rev.1) |
LR-VDSL2 upstream PSD
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-05 |
|
[ 191 ]
|
PON PMD Calculator - OOC, OOB and IBXT
|
Calnex Solutions Limited (United Kingdom)
|
Q2/15
|
2017-06-05 |
|
[ 190 ]
(Rev.1-3) |
In-Band Crosstalk Due To Multiple ONU Reflections - Version 2
|
Calnex Solutions Limited (United Kingdom)
|
Q2/15
|
2017-06-05 |
|
[ 189 ]
|
G.fast: Triggering Criteria for RMCR
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 188 ]
|
G.fast: Improving RMCR
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 187 ]
|
G.fast: DTA and RPA
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 186 ]
|
G.fast: A Coordinated DTA Procedure to Avoid Unexpected NEXT
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 185 ]
|
G.fast: Comparison of two power control methods for precoding
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 184 ]
|
G.mgfast: Constellation Shaping with LDPC Coded Modulation
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 183 ]
|
G.fast: Simulation Results for Maximum Ration Transmission
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 182 ]
|
G.8273.2: Noise transfer: SyncE to PTP frequency response
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 181 ]
(Rev.1) |
Proposal on extending G.sup56 to support beyond 10G interface optimized for the transport of CPRI
|
China Mobile Communications Corporation
,
CAICT
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Intel Corporation (United States)
,
IP Light
,
Xilinx Incorporation
|
Q11/15
|
2017-06-05 |
|
[ 180 ]
|
G.hn: Secure Admission - auto-mode mechanism
|
Sigma Designs Israel S.D.I Ltd.
|
Q18/15
|
2017-06-05 |
|
[ 179 ]
(Rev.1) |
Layer adjacency discovery based on FlexE and FlexO/OTUCn
|
China Unicom
,
FiberHome Technologies Group (China)
|
Q14/15
|
2017-06-05 |
|
[ 178 ]
|
Relationship between G.800 topology and G.7711 FDs/Links
|
China Unicom
,
FiberHome Technologies Group (China)
|
Q14/15, Q12/15
|
2017-06-05 |
|
[ 177 ]
(Rev.1) |
Interaction between SDN Controller and Applications
|
China Unicom
,
FiberHome Technologies Group (China)
|
Q14/15, Q12/15
|
2017-06-05 |
|
[ 176 ]
|
Validate resilience model of G.7711 for simple ERP
|
China Unicom
,
FiberHome Technologies Group (China)
|
Q9/15, Q14/15
|
2017-06-05 |
|
[ 175 ]
|
Secure Admission in G.hn networks - passphrase based procedure
|
Sigma Designs Israel S.D.I Ltd.
|
Q18/15
|
2017-06-05 |
|
[ 174 ]
|
Proposed 40 channels application parameters for G.metro
|
ADVA Optical Networking (United Kingdom)
,
China Unicom
,
Finisar Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Telefon AB - LM Ericsson (Sweden)
,
ZTE Corporation (China)
|
Q6/15
|
2017-06-05 |
|
[ 173 ]
|
Terrestrial deployment and 400G system test results of G.654 fibre in China Unicom
|
China Unicom
|
Q6/15, Q5/15
|
2017-06-05 |
|
[ 172 ]
|
ESMC Padding bits in G.8264
|
Huawei Technologies Co., Ltd. (China)
,
Nokia USA
,
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2017-06-05 |
|
[ 171 ]
(Rev.1) |
G.8271.1 Appendix V failure scenarios
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2017-06-05 |
|
[ 170 ]
|
G.8273.2: Noise transfer: PTP to PTP frequency response
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 169 ]
|
Architecture Requirement of 5G transport network
|
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q12/15, Q11/15, Q10/15
|
2017-06-05 |
|
[ 168 ]
|
Defects of time degradation
|
China Mobile Communications Corporation
|
Q13/15
|
2017-06-05 |
|
[ 167 ]
|
Proposal on mapping table of PTP clockClass to SSM
|
China Mobile Communications Corporation
|
Q13/15
|
2017-06-05 |
|
[ 166 ]
|
Frequency offset monitoring function
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2017-06-05 |
|
[ 165 ]
|
Considerations on sync requirements and network budget for 5G
|
China Mobile Communications Corporation
|
Q13/15
|
2017-06-05 |
|
[ 164 ]
|
Requirement and solutions for PON systems above 10Gbps per wavelength
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2017-06-05 |
|
[ 163 ]
|
Proposal for revising G.697 to improve e-OTDR related contents
|
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2017-06-05 |
|
[ 162 ]
|
Analysis on PON synchronization alarms
|
China Mobile Communications Corporation
|
Q2/15
|
2017-06-05 |
|
[ 161 ]
|
Analysis on PON ONU synchronization configuration
|
China Mobile Communications Corporation
|
Q2/15
|
2017-06-05 |
|
[ 160 ]
|
Proposal on sync management requirements and model
|
China Mobile Communications Corporation
|
Q14/15
|
2017-06-05 |
|
[ 159 ]
|
Standards Gap Analysis of FlexE
|
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q9/15, Q10/15
|
2017-06-05 |
Resultats:2858 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
51 -
52 -
53 -
54 -
55 -
56 -
57 -
58
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):