Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 512 ]
|
Considerations of FlexOyP MSI master slave modes
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 511 ]
|
Proposed clarification on defect/alarm detection for FlexO (G.798.flexo)
|
Fujitsu Limited (Japan)
|
Q11/15
|
2025-09-29 |
|
[ 510 ]
|
Error marking of Ethernet client over B1T OTN
|
Algerie Telecom SPA (Algeria)
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 509 ]
|
Consideration on B1T (Definition on HO/LO path)
|
Fujitsu Limited (Japan)
|
Q11/15
|
2025-09-29 |
|
[ 508 ]
|
Consideration on FlexO-xe interface with path layer support
|
Fujitsu Limited (Japan)
|
Q11/15
|
2025-09-29 |
|
[ 507 ]
|
Consideration and proposed update for revised G.806
|
Fujitsu Limited (Japan)
|
Q11/15
|
2025-09-29 |
|
[ 506 ]
|
Considerations of ODUCn over FlexOyP path
|
Algerie Telecom SPA (Algeria)
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 505 ]
|
New management architecture content for CMAFP
|
China Mobile Communications Co. Ltd.
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2025-09-29 |
|
[ 504 ]
|
FlexOyP path layer frame proposal
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 503 ]
|
Analysis of FlexOyP path frame format
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 502 ]
|
Analysis and consideration on B1T open questions
|
Algerie Telecom SPA (Algeria)
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-29 |
|
[ 501 ]
|
Proposal on updating the general capability library of NMA
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q12/15
|
2025-09-28 |
|
[ 500 ]
|
Proposal on updating typical scenarios of ENO for transport network
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q12/15
|
2025-09-28 |
|
[ 499 ]
(Rev.1) |
Proposal to start technical report on enhanced management for optical network passive resource
|
China Academy of Information and Communications Technology
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15
|
2025-09-28 |
|
[ 498 ]
|
Proposal on updating the introduction of ENO functions in TR ENO
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q12/15
|
2025-09-28 |
|
[ 497 ]
|
Proposal for additions and revisions to ITU-T Rec.L.102 "Optical fibre cables for aerial application"
|
Ministry of Communications, Department of Telecommunications (India)
,
Sterlite Technologies Limited (India)
|
Q5/15
|
2025-09-28 |
|
[ 496 ]
|
Proposal on researching free space optics (FSO) synchronization technology to support terrestrial mobile backhaul networks
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-09-28 |
|
[ 495 ]
|
Proposal for G.979 of adding electrical testing for submarine cable monitoring
|
China Mobile Communications Co. Ltd.
,
China Unicom
,
HMN Technologies Co. Ltd. (China)
|
Q8/15
|
2025-09-28 |
|
[ 494 ]
|
Proposal for G.979 of adding electrical testing for submarine cable monitoring
File not provided
|
China Mobile Communications Co. Ltd.
|
Q8/15
|
2025-09-28 |
|
[ 493 ]
|
Considerations on the sensing distance about the DFOS system
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q6/15
|
2025-09-28 |
|
[ 492 ]
|
Considerations on the optical system of the hollow-core optical fiber
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q6/15
|
2025-09-28 |
|
[ 491 ]
|
Considerations on the technologies and industry developments about the B1T DWDM systems
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q6/15
|
2025-09-28 |
|
[ 490 ]
(Rev.1) |
M+1 fgOTN protection application in power grid communication network
|
China Southern Power Grid Co., Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-28 |
|
[ 489 ]
|
Network synchronization resilience
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-09-28 |
|
[ 488 ]
|
GNSS status message (G.8271)
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-09-28 |
|
[ 487 ]
|
Data centre network HRM
|
China Academy of Information and Communications Technology
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-09-28 |
|
[ 486 ]
(Rev.1) |
latency requirement of fgOTN protection in power grid communication network
|
China Southern Power Grid Co., Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2025-09-28 |
|
[ 485 ]
|
G.8275 Annex F clarifications
|
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q13/15
|
2025-09-28 |
|
[ 484 ]
|
Dedicated Ethernet PTP interfaces [G.8273.2]
|
China Academy of Information and Communications Technology
,
Huawei Technologies Co., Ltd. (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
|
Q13/15
|
2025-09-28 |
|
[ 483 ]
|
G.781 QL-PRC for option III
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-09-28 |
|
[ 482 ]
|
G.781 clarifications
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2025-09-28 |
|
[ 481 ]
|
A Proposal on Resilience Enhancement of Near-Shore Submarine Cables Using Dedicated Sensing Optical Fibres
|
China Academy of Information and Communications Technology
,
China Telecommunications Corporation
,
China Unicom
,
HMN Technologies Co. Ltd. (China)
|
Q8/15
|
2025-09-28 |
|
[ 480 ]
|
Several potential application scenarios of hollow core fibers
|
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q5/15
|
2025-09-27 |
|
[ 479 ]
|
Discussion on dual-rate supporting for 50Gbps modules in wireless fronthaul applications
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2025-09-27 |
|
[ 478 ]
|
Proposal for adding text on the section of fronthaul architecture and technologies for ION-2030 draft report
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15, Q12/15
|
2025-09-27 |
|
[ 477 ]
|
Appendix on operating examples of sensing distance and optical loss budget
|
ADTRAN Holdings Inc. (United States)
,
Ciena Canada
,
Huawei Technologies Co., Ltd. (China)
,
Prysmian SpA (Italy)
,
Verizon Communication Corporation (United States)
|
Q6/15
|
2025-09-27 |
|
[ 476 ]
|
G.dfos new clause for wavelength allocation
|
ADTRAN Holdings Inc. (United States)
,
Ciena Canada
,
Huawei Technologies Co., Ltd. (China)
,
Prysmian SpA (Italy)
,
Verizon Communication Corporation (United States)
|
Q6/15
|
2025-09-27 |
|
[ 475 ]
(Rev.1) |
New Dataset Members for GNSS general attributes in ITU-T G.8271
|
Juniper Networks (United States)
,
Microchip Technology Inc. (United States)
,
Rakuten Mobile, Inc. (Japan)
|
Q13/15
|
2025-09-26 |
|
[ 474 ]
|
Additional ABTCA aspects added to G.suppl83
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2025-09-26 |
|
[ 473 ]
|
Clarification of ESMC and LAG
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2025-09-26 |
|
[ 472 ]
|
Proposal on fiber characteristics in G.smmcf and G.csmcf Recommendations
|
China Academy of Information and Communications Technology
,
China Telecommunications Corporation
,
Purple Mountain Laboratories (China)
|
Q5/15
|
2025-09-26 |
|
[ 471 ]
|
Propose to initiate a TR on key components for MCF submarine cable application
|
China Academy of Information and Communications Technology
,
China Telecommunications Corporation
,
China Unicom
,
HMN Technologies Co. Ltd. (China)
|
Q8/15
|
2025-09-26 |
|
[ 470 ]
|
Synchronization network requirements in G.Sup.DCSync
|
Calnex Solutions plc. (United Kingdom)
|
Q13/15
|
2025-09-26 |
|
[ 469 ]
|
Consideration on reliability and availability for optical networks
|
Fujitsu Limited (Japan)
|
Q6/15, Q12/15
|
2025-09-26 |
|
[ 468 ]
|
Proposed to update the Summary in FIP4SME
|
China Telecommunications Corporation
|
Q3/15
|
2025-09-26 |
|
[ 467 ]
|
AI-enhanced FIP use case for G.sup.FIP4SME
|
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q3/15
|
2025-09-26 |
|
[ 466 ]
|
Summary and future work suggestions of FIN system coexistence
|
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation (China)
|
Q3/15
|
2025-09-26 |
|
[ 465 ]
|
Coexistence scenario of external CEx method for FIN system
|
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation (China)
|
Q3/15
|
2025-09-26 |
|
[ 464 ]
|
AR-HCF and its role in ultra-wide band transmission systems
|
China Mobile Communications Co. Ltd.
|
Q6/15, Q5/15
|
2025-09-26 |
|
[ 463 ]
|
Proposed example of 2.5G and 10G integrated combo coexistence
|
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation (China)
|
Q3/15
|
2025-09-26 |
Resultats:371 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):