Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 60 ]
|
Proposed revision to Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz
|
Japan
|
|
2024-05-16 |
|
[ 59 ]
|
Support document for Annex 10 to Document 3K/335 - Prediction of building entry loss
|
Japan
|
|
2024-05-16 |
|
[ 58 ]
|
Support document for Annex 13 to Document 3K/335 - Prediction of clutter loss
|
SoftBank Corporation (Japan)
|
|
2024-05-16 |
|
[ 57 ]
|
Proposed revision of Recommendation ITU-R P.617-5 troposcatter model and consequent proposed revisions to Recommendations ITU-R P.452-18, ITU-R P.1812-7 and ITU-R P.2001-5 - Propagation prediction techniques and data required for the design of trans-horizon radio-relay systems
|
Australia
|
|
2024-05-16 |
|
[ 56 ]
|
Proposed revisions of Recommendations ITU-R P.526-15 and ITU-R P.619-5 - Propagation by diffraction - addition of a general terrain slant path model
|
Australia
|
|
2024-05-16 |
|
[ 55 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R P.530-18 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems
|
Politecnico di Milano Dipartimento di Elettronica, Informazion e Biongegneria (Italy)
|
|
2024-05-15 |
|
[ 54 ]
|
Proposed draft revision of Recommendation ITU-R P.1814-0 - Prediction methods required for the design of terrestrial free-space optical links
|
Politecnico di Milano Dipartimento di Elettronica, Informazion e Biongegneria (Italy)
|
|
2024-05-15 |
|
[ 53 ]
|
Proposal of a new DBSG3 data table: rain and fog attenuation affecting FSO terrestrial links
|
Politecnico di Milano Dipartimento di Elettronica, Informazion e Biongegneria (Italy)
|
|
2024-05-15 |
|
[ 52 ]
|
Submission of D-Band rain attenuation statistics affecting an 800-m terrestrial link for Table I-1 of DBSG3
|
Politecnico di Milano Dipartimento di Elettronica, Informazion e Biongegneria (Italy)
|
|
2024-05-16 |
|
[ 51 ]
|
Activity Report of Correspondence Group 3M-15 - Improvement of rain and total attenuation models in Recommendation ITU-R P.618
|
CG 3M-15
|
|
2024-05-15 |
|
[ 50 ]
|
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 4C, 5A, 5B, 5C, 3J and 3M) - Relevant technical information to support studies
under WRC-27 agenda item 1.18
|
WP 4A
|
AI1.18
|
2024-05-15 |
|
[ 49 ]
|
Report on the activities of Correspondence Group 3K-3M-12 - Prediction of clutter loss up to 105 GHz
|
Chair, CG 3K-3M-12
|
|
2024-05-15 |
|
[ 48 ]
|
Discussion document on dual channel troposcatter measurement system utilized in Colorado, USA
|
United States
|
|
2024-05-13 |
|
[ 47 ]
|
Contribution of 3.5 GHz clutter measurements in Salt Lake City, Utah to the Study Group 3 databank
|
United States
|
|
2024-05-13 |
|
[ 46 ]
|
Contribution of 3.5 GHz clutter measurements in Denver, Colorado to the Study Group 3 databank
|
United States
|
|
2024-05-13 |
|
[ 45 ]
|
Contribution of 3.5 GHz Clutter Measurements in Boulder, Colorado to the Study Group 3 Databank
|
United States
|
|
2024-05-13 |
|
[ 44 ]
|
Discussion document on a new 3.1 to 4.2 GHz Multi-Transmitter Continuous-wave mobile Measurement System being used for propagation studies in the USA
|
United States
|
|
2024-05-13 |
|
[ 43 ]
|
Working document toward a preliminary draft revision of HDB-58 - Update of Handbook 58 on ITU-R propagation prediction methods for interference and sharing studies
|
United States
|
|
2024-05-13 |
|
[ 42 ]
|
Correspondence Group 3J-3K-3M-14 activity Report - Issues relating to the HAPS propagation model
|
Chair, CG 3J-3K-3M-14
|
|
2024-05-14 |
|
[ 41 ]
|
Activity Report of Correspondence Group 3M-4 - Software products, digital maps and reference numerical data products
|
CG 3M-4
|
|
2024-05-14 |
|
[ 40 ]
|
Activity Report of Correspondence Group 3J-3K-3M-16 - The atmospheric radio refractive index and its effects on radiowave propagation
|
CG 3J-3K-3M-16
|
|
2024-05-14 |
|
[ 39 ]
|
Activity Report of Correspondence Group 3J-3M-5 - Effect of clouds and precipitation on attenuation and depolarization on slant paths
|
CG 3J-3M-5
|
|
2024-05-14 |
|
[ 38 ]
|
Liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D (copy to Working Party 7C for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 4A
|
AI1.1
|
2024-05-13 |
|
[ 37 ]
|
Liaison statement to Working Parties 5A, 5C, 3M and 7D (copy to Working Party 7C) - WRC-27 agenda item 1.3
|
WP 4A
|
AI1.3
|
2024-05-13 |
|
[ 36 ]
|
Liaison statement to Working Parties 3M, 5A, 5B, 5C, 6B and 7C (copy to Working Party 4B for information) - WRC-27 agenda item 1.4
|
WP 4A
|
AI1.4
|
2024-05-13 |
|
[ 35 ]
|
Liaison statement to Working Parties 3M, 5B, and 7B (copy to Working Parties 5A, 5C, 7A and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 4A
|
AI1.2
|
2024-05-13 |
|
[ 34 ]
|
Activity Report of Correspondence Group 3K-3M-18 - Specific issues common to Recommendations ITU-R P.452, ITU-R P.1812 or ITU-R P.2001
|
Chair, 3K-3M-18
|
|
2024-05-13 |
|
[ 33 ]
|
Correspondence Group 3J-23 activity Report - General slant path terrain diffraction model
|
Chair, CG 3J-23
|
|
2024-05-09 |
|
[ 32 ]
|
New data for DBSG3 Table II-1 - Three years of Alphasat attenuation statistics in Tito Scalo and Spino d'Adda
|
Italy
|
|
2024-05-07 |
|
[ 31 ]
|
Liaison statement to Working Parties 3L, 4B, 5A, 5C, 5D, 7B, and 7C (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.14
|
WP 4C
|
AI1.14
|
2024-05-01 |
|
[ 30 ]
|
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-05-01 |
|
[ 29 ]
|
Liaison statement to Working Parties 3L, 3M, 4B, 5A,
5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12
|
WP 4C
|
AI1.12
|
2024-05-01 |
|
[ 28 ]
|
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11
|
WP 4C
|
AI1.11
|
2024-05-01 |
|
[ 27 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
|
Chair, CCV
|
|
2024-04-22 |
|
[ 26 ]
|
Liaison statement to Working Parties 4A and 4C (copy to Working Parties 3J, 3M, 5A, 5B, and 5C for information) - WRC-27 agenda item 1.18
|
WP 7D
|
AI1.18
|
2024-03-28 |
|
[ 25 ]
|
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16
|
WP 7D
|
AI1.16
|
2024-03-28 |
|
[ 24 ]
|
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18
|
WP 7D
|
AI1.18, AI1.16
|
2024-03-28 |
|
[ 23 ]
|
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7
|
WP 7B
|
AI1.7
|
2024-03-27 |
|
[ 22 ]
|
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002
|
ETSI
|
|
2024-03-27 |
|
[ 21 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8
|
WP 7C
|
AI1.8
|
2024-03-26 |
|
[ 20 ]
|
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17
|
WP 7C
|
AI1.17
|
2024-03-25 |
|
[ 19 ]
|
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19
|
WP 7C
|
AI1.19
|
2024-03-25 |
|
[ 18 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7
|
WP 7C
|
AI1.7
|
2024-03-25 |
|
[ 17 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5B, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18
|
WP 7C
|
AI1.18
|
2024-03-25 |
|
[ 16 ]
|
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 4A, 4C, 5A, 5B and 5C) - Propagation aspects related to WRC-27 agenda item 1.18
|
WP 7C
|
AI1.18
|
2024-03-25 |
|
[ 15 ]
|
Liaison statement to Working Parties 4A, 4C, 5A and 5B (copy to Working Parties 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18
|
WP 7C
|
AI1.18
|
2024-03-25 |
|
[ 14 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3
|
WP 7C
|
AI1.3
|
2024-03-25 |
|
[ 13 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D for information) - WRC-27 agenda item 1.1
|
WP 7C
|
AI1.1
|
2024-03-25 |
|
[ 12 ]
|
Note to CPM Steering Committee (copy to Working Parties 3M, 4B, 5A, 5B, 5C and 7C) - WRC-27 agenda item 1.4
|
Acting Chair, WP 6B
|
AI1.4
|
2024-03-20 |
|
[ 11 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6
|
WP 6A
|
AI1.6
|
2024-03-18 |
Resultats:310 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):