Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 216 ]
|
Information on current activities in APT Wireless Group on Question ITU-R 210-3/1 "Wireless power transmission" and WRC-19 agenda item 9.1, issue 9.1.6 in response to Resolution 958 (WRC-15) Annex item 1
|
Asia-Pacific Telecommunity
|
|
2017-10-06 |
|
[ 215 ]
|
Reply liaison statement to Working Party 1A on propagation characteristics in the frequency range 275 450 GHz (copy to Working Parties 5A, 5C, 7C and 7D for information)
|
WPs 3J, 3K and 3M
|
|
2017-09-06 |
|
[ 214 ]
|
Assistance to developing countries for implementing conformance and interoperability programmes
|
ITU-D SG 2
|
|
2017-08-22 |
|
[ 213 ]
|
Reply liaison statement to Working Party 1A (copy for information to Working Parties 3L, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services
|
WP 1C
|
|
2017-07-07 |
|
[ 212 ]
|
New version of the Access Network Transport (ANT) Standards Overview and Work Plan
|
ITU-T SG 15
|
|
2017-07-07 |
|
[ 211 ]
|
New version of the Home Network Transport (HNT) Standards Overview and Work Plan
|
ITU-T SG 15
|
|
2017-07-05 |
|
[ 210 ]
|
Reply liaison statement - Led lighting interference to broadcasting services
|
International Special Committee on Radio Interference
|
|
2017-07-03 |
|
[ 209 ]
|
Liaison statement on information about work being carried out under study in ITU-T Question 3/5
|
ITU-T SG 5
|
|
2017-06-23 |
|
[ 208 ]
+Ann.1-15 |
Report on the third 2015-2019 meeting of Working Party 1A (Geneva, 13 - 20 June 2017)
|
Chairman, WP 1A
|
|
2017-06-21 |
|
[ 207 ]
|
Final list of participants - Working Party 1A (Geneva, 13-20 June 2017)
|
Director, BR
|
|
2017-06-21 |
|
[ 206 ]
|
List of documents issued (Documents 1A/144 - 1A/206)
|
BR Study Groups Department
|
|
2017-06-13 |
|
[ 205 ]
|
Report of the work of the Rapporteur Group on Wireless Power Transmission
|
Rapporteur, RG-WPT
|
Q210/1
|
2017-06-13 |
|
[ 204 ]
|
IEC/TC69/WG7 and ISO/TC22/SC37/JPT19363 input ot ITU-R
|
International Electrotechnical Commission
,
International Organization for Standardization
|
|
2017-06-09 |
|
[ 203 ]
+Add.1 |
Report on CISPR activities on WPT issues - December 2016 to May 2017
|
SG 1 Rapp. to CISPR on WPT issues
|
|
2017-06-09 |
|
[ 202 ]
(Rev.1) |
Report on CISPR activities June 2016 to May 2017
|
Rapporteur, SG1 RG on Liaison with CISPR
,
SG 1 Rapp. to CISPR on WPT issues
|
|
2017-06-09 |
|
[ 201 ]
|
Preliminary draft revision of Report ITU-R SM.2303-1 - Wireless power transmission using technologies other than radio frequency beam
|
European Broadcasting Union
|
|
2017-06-06 |
|
[ 200 ]
|
Work in standards developing organizations relating to Wireless Power Transfer (WPT) under issue 9.1.6 of WRC-19 - Comments to ETSI/ERM on draft standard EN 303 147
|
European Broadcasting Union
|
|
2017-06-06 |
|
[ 199 ]
|
Work in standards developing organizations relating to Wireless Power Transfer (WPT) under issue 9.1.6 of WRC-19 - Comments to CISPR/B on CISPR/B/673/DC
|
European Broadcasting Union
|
|
2017-06-06 |
|
[ 198 ]
|
Proposal for ITU-R to write to CISPR on wireless power transmission activities
|
Netherlands (Kingdom of the)
,
United Kingdom of Great Britain and Northern Ireland
|
|
2017-06-06 |
|
[ 197 ]
|
Recent developments concerning coexistence of wired telecommunication with radiocommunication systems
|
Rapporteur, RG wired and radio
|
Q211/1, Q210/1
|
2017-06-06 |
|
[ 196 ]
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - Unwanted emissions of digital radio systems
|
Germany (Federal Republic of)
|
|
2017-06-06 |
|
[ 195 ]
|
Proposed changes to Annex 7 to Working Party 1A Chairman's Report
|
United States of America
|
Q210/1
|
2017-06-05 |
|
[ 194 ]
|
Proposed editorial modifications of Recommendation ITU-R SM.326, Recommendation ITU-R SM.328, Recommendation ITU-R SM.853, Recommendation ITU-R SM.1045, Report ITU-R SM.2021 and Report ITU-R SM.2057
|
United States of America
|
|
2017-06-05 |
|
[ 193 ]
|
Proposed revision of working document towards PDN Report ITU-R SM.[300GHZ-SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz
|
United States of America
|
AI1.15
|
2017-06-05 |
|
[ 192 ]
|
Reply to comments from EBU described in "Preliminary draft revision of Report ITU-R SM.2303-1"
|
Japan
|
Q210/1
|
2017-06-05 |
|
[ 191 ]
|
Revision proposal of Report ITU-R SM.2303 to update information regarding the studies on the impact of wireless power transmission for electric vehicles
|
Japan
|
Q210/1
|
2017-06-05 |
|
[ 190 ]
|
Proposed revision to working document towards a preliminary draft new Report ITU-R SM.[300GHZ_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz
|
Japan
|
AI1.15
|
2017-06-05 |
|
[ 189 ]
|
Draft liaison statement to Working Party 3K on propagation characteristics in the 300-GHz band
|
Japan
|
AI1.15
|
2017-06-05 |
|
[ 188 ]
|
Proposed revision to draft outline for CPM text for WRC-19 agenda item 1.15
|
Japan
|
AI1.15
|
2017-06-05 |
|
[ 187 ]
|
Proposed modification of preliminary draft revision of Report ITU-R SM.2303-1
|
Korea (Republic of)
|
Q210/1
|
2017-06-05 |
|
[ 186 ]
|
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B and 5B) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 5A
|
|
2017-06-05 |
|
[ 185 ]
|
Liaison statement to Working Parties 1A and 7C (copy to Working Parties 5C and 7D for information) - WRC-19 agenda item 1.15
|
WP 5A
|
AI1.15
|
2017-06-05 |
|
[ 184 ]
|
Reply liaison statement to Working Party 1A and 1B (copied for information to Working Parties 5A and 5C) - Wireless power transmission
|
WP 5B
|
|
2017-06-05 |
|
[ 183 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT] - Visible Light for Broadband Communications
|
Netherlands (Kingdom of the)
|
Q238/1
|
2017-06-02 |
|
[ 182 ]
(Rev.1) |
Proposed new Report ITU-R SM.[NAT-APR]
|
Germany (Federal Republic of)
|
|
2017-06-02 |
|
[ 181 ]
|
Liaison statement to ITU-R Working Party 1A - Proposal of a new Report ITU-R SM.[WPT.WIDE-BEAM-IMPACTS] "Impact study and human hazard issues for wireless power transmission via radio frequency wide-beam"
|
Director, BR
|
|
2017-06-02 |
|
[ 180 ]
|
Contribution to Working Party 1A - Working document towards a preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT] - Visible Light for Broadband Communications
|
Institute of Electrical and Electronics Engineers, Inc.
|
Q238/1
|
2017-06-05 |
|
[ 179 ]
|
Suppression of out-of-band power emission for broadband power line communication standard in China
|
China (People's Republic of)
|
|
2017-06-02 |
|
[ 178 ]
|
Compatibility study between CDR and Aeronautical Radio Navigation Service ILS/VOR
|
China (People's Republic of)
|
|
2017-06-02 |
|
[ 177 ]
|
Proposed modification of working document towards a preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT]
|
Korea (Republic of)
|
Q238/1
|
2017-06-02 |
|
[ 176 ]
|
Proposed revision of draft new Recommendation UIT-R SM.[WPT] - Frequency ranges for operation of non-beam Wireless Power Transmission (WPT) systems
|
Korea (Republic of)
|
Q210/1
|
2017-06-02 |
|
[ 175 ]
|
Liaison statement to Working Parties 1A and 7C (copy to Working Parties 3K, 5A and 7D for information) - WRC-19 agenda item 1.15
|
WP 5C
|
AI1.15
|
2017-06-02 |
|
[ 174 ]
|
Liaison statement to Working Party 1A on WPT activities
|
International Electrotechnical Commission
|
|
2017-05-30 |
|
[ 173 ]
|
Proposal for a preliminary draft new Report on issues with the maintenance of Recommendation ITU-R SM.1448
|
United Kingdom of Great Britain and Northern Ireland
|
|
2017-05-26 |
|
[ 172 ]
|
Proposed update to Recommendation ITU-R SM.1448 including a draft liaison statement to affected Working Parties - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15)
|
United Kingdom of Great Britain and Northern Ireland
|
|
2017-05-26 |
|
[ 171 ]
|
Response to liaison statement from Working Party 1A, titled: Assessment of the impact of unwanted radio frequency energy generated by non radiocommunication equipment to radiocommunications services
|
International Civil Aviation Organization
|
Q236/1, Q221/1
|
2017-05-24 |
|
[ 170 ]
|
Clarification of some terms used for WPT studies under WRC-19 agenda item 9.1, issue 9.1.6
|
Netherlands (Kingdom of the)
|
AI9.1
|
2017-05-15 |
|
[ 169 ]
|
Liaison statement to ITU-R Working Parties 1A and 1B (copy to RG-WPT) - AWG Study on Question ITU-R 210-3/1 "Wireless power transmission"
|
Asia-Pacific Telecommunity
|
Q210/1
|
2017-04-20 |
|
[ 168 ]
|
Answer to liaison statement to External Organisations on preliminary draft revision of Report ITU-R SM.2351-1 on smart grid utility management systems
|
Telefon AB - LM Ericsson
,
Huawei Technologies Co. Ltd.
,
Qualcomm, Inc.
,
Telecom Italia S.p.A.
|
|
2017-04-19 |
|
[ 167 ]
|
Reply liaison statement to Working Party 1A regarding WRC-19 agenda item 1.15
|
WP 7C
|
AI1.15
|
2017-04-13 |
Resultats:466 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):