Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 53 ]
|
Proposed modifications for 'The Signalling Requirements for IP Centrex service'
|
China Telecom
|
Q3/11
|
2009-01-09 |
|
[ 52 ]
|
Editorial changes on Q.CRBT
|
KT, ETRI
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 51 ]
|
Proposed signalling architecture of mobility
|
China Mobile, Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 50 ]
|
Proposed outline of a draft Recommendation for signalling architecture and signalling flows for mobility
|
China Mobile, Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 49 ]
|
Proposed modifications to draft Q.PCNApp
|
Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 48 ]
|
Modifications to the admission control coordination models
|
British Telecom, Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 47 ]
|
Proposed modifications to draft Q.CRT
|
Huawei Technologies Co., Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 46 ]
|
Proposed modifications to draft Q.CRBT
|
Huawei Technologies Co., Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 45 ]
|
Proposed modification to Interaction between networks of draft Q.CRBT
|
Huawei Technologies Co., Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 44 ]
|
Proposed additions to draft Recommendation Q.CRT
|
Huawei Technologies Co.,Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 43 ]
|
Proposed additions to draft Recommendation Q.CRBT
|
Huawei Technologies Co.,Ltd.
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 42 ]
|
Definition of Multimedia CAT Capability Indicator to BICC/ISUP protocols
|
Huawei Technologies Co. Ltd.
|
Q3/11
|
2009-01-09 |
|
[ 41 ]
|
Signalling flows for centralized admission control of unicast combined with decentralized admission control of multicast flows
|
Huawei Technologies Co., Ltd., CATR
|
Q5/11
|
2009-01-09 |
|
[ 40 ]
|
Revised draft of Supp.CRBT-CRT
|
ETRI, KT
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 39 ]
|
Document withdrawn
|
N/A
|
|
2009-01-09 |
|
[ 38 ]
|
Proposal for change of the question title of Q.12/11
|
ETRI
|
Q12/11
|
2009-01-09 |
|
[ 37 ]
|
NID/USN standardization status of ITU-T
|
ETRI
|
Q12/11
|
2009-01-09 |
|
[ 36 ]
|
Revised texts of Draft Recommendation Q.3308
|
ETRI
|
Q5/11
|
2009-01-09 |
|
[ 35 ]
|
IMS/NGN Performance Benchmark Part 3: Traffic Sets and Traffic Profiles
|
Telekom Austria AG
|
Q8/11, Q11/11
|
2009-01-09 |
|
[ 34 ]
|
IMS/NGN Performance Benchmark Part 2: Subsystem Configurations and Benchmarks
Reposted with correct attachment
|
Telekom Austria AG
|
Q8/11, Q11/11
|
2009-01-09 |
|
[ 33 ]
|
IMS/NGN Performance Benchmark Part 1: Core Concepts
|
Telekom Austria AG
|
Q8/11, Q11/11
|
2009-01-09 |
|
[ 32 ]
|
Network performance objectives Tests for IP-based Voice services
|
Telekom Austria AG
|
Q11/11
|
2009-01-09 |
|
[ 31 ]
|
Comparisons of ITU-T CRBT and 3GPP CAT
|
Korea (Republic of)
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 30 ]
|
Document withdrawn
|
N/A
|
|
2009-01-09 |
|
[ 29 ]
|
Proposed method of marking signalling packets suitable for IPv6
|
Razoom Inc.
|
Q5/11
|
2009-01-09 |
|
[ 28 ]
|
Proposed text for a new section 8 of Recommendation Q.flowstatesig on security considerations
|
Razoom Inc.
|
Q5/11
|
2009-01-09 |
|
[ 27 ]
|
Editorial corrections
|
Razoom Inc.
|
Q5/11
|
2009-01-09 |
|
[ 26 ]
|
Proposed text for the summary of Q.flowstatesig
|
Razoom Inc.
|
Q5/11
|
2009-01-09 |
|
[ 25 ]
|
Proposed Annex B of Q.flowstatesig, dealing with signalling field encoding
|
Razoom Inc.
|
Q5/11
|
2009-01-09 |
|
[ 24 ]
|
Proposed Annex A of Q.flowstatesig, dealing with signaling mobile source addresses
|
Razoom Inc.
|
Q5/11
|
2009-01-09 |
|
[ 23 ]
|
Document withdrawn
|
ETRI
|
Q1/11
|
2009-01-09 |
|
[ 22 ]
|
Modifications on AVP specifications on Ri
|
KDDI Corporation
|
Q5/11
|
2009-01-09 |
|
[ 21 ]
|
Modifications on user/session reservation specification on Ri
|
KDDI Corporation
|
Q5/11
|
2009-01-09 |
|
[ 20 ]
|
Addition of command specification on Ri
|
KDDI Corporation
|
Q5/11
|
2009-01-09 |
|
[ 19 ]
|
Modification of the description about Flow-Description AVP
|
KDDI Corporation
|
Q5/11
|
2009-01-09 |
|
[ 18 ]
|
Addition of description about namespace
|
KDDI Corporation
|
Q5/11
|
2009-01-09 |
|
[ 17 ]
|
Revised draft recommendation of Q.CRT
|
ETRI
|
Q3/11, Q2/11
|
2009-01-09 |
|
[ 16 ]
|
Proposed text for clause 2, 4 and 6 of Q.rsctm
|
CATR, Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 15 ]
|
Proposed draft for Signalling flows and protocols for resource control and traffic management supporting IPTV services
|
CATR, Huawei Technologies Co., Ltd.
|
Q5/11
|
2009-01-09 |
|
[ 14 ]
|
New Draft Recommendation Q.3918 "Testing scenarios, tests list and types for NGN (TS1) multimedia services"
|
Telecom. Admin. of the Russian Federation
|
Q8/11
|
2009-01-06 |
|
[ 13 ]
|
New Draft Recommendation Q.3917 "Testing scenarios, tests list and types for NGN (TS1) streaming services"
|
Telecom. Admin. of the Russian Federation
|
Q8/11
|
2009-01-06 |
|
[ 12 ]
|
New Draft Recommendation Q.3916 "Testing Scenarios, tests list and types for NGN (TS1) basic call and supplementary services"
|
Telecom. Admin. of the Russian Federation
|
Q8/11
|
2009-01-06 |
|
[ 11 ]
|
New Recommendation draft Q. 3915 "Types and list of NGN services that could be tested (TS1) on the model network" (first testing set)
|
Telecom. Admin. of the Russian Federation
|
Q10/11
|
2009-01-06 |
|
[ 10 ]
|
New recommendation draft Q.3906 "The scenarios, list and types of tests for TM local and NUT testing for Wireless Broadband on the Model Network"
|
Telecom. Admin. of the Russian Federation
|
Q8/11
|
2009-01-06 |
|
[ 9 ]
|
New recommendation draft Q.3905 "The scenarios, list and types of tests for TM local and NUT testing for IPTV on the Model Network"
|
Telecom. Admin. of the Russian Federation
|
Q8/11
|
2009-01-06 |
|
[ 8 ]
|
New recommendation draft Q.3904 "The scenarios, list and types of tests for TM local and NUT testing for IMS on the Model Network"
|
Telecom. Admin. of the Russian Federation
|
Q8/11
|
2009-01-09 |
|
[ 7 ]
|
Contents of Handbook on Testing
|
Telecom. Admin. of the Russian Federation
|
Q8/11
|
2009-01-06 |
|
[ 6 ]
|
Proposed amendments for Q.CRBT
|
NTT Corporation
|
Q3/11, Q2/11
|
2009-01-06 |
|
[ 5 ]
|
Proposals for CRBT Gateway model signalling flow
|
NTT Corporation
|
Q3/11, Q2/11
|
2009-01-06 |
|
[ 4 ]
|
Proposed Initial Text for ITU-T Supplement "Evaluation of Existing Signaling Protocol Extensions to Support Y.2171 Admission Control Priority Levels"
|
Telcordia & AT&T
|
Q5/11, Q4/11, Q3/11
|
2009-01-06 |
Results:303 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):