Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 663 ]
|
G.vdsl: Definition of electrical loop length
|
Broadcom
|
Q4/15
|
2008-01-29 |
|
[ 662 ]
|
G.INP; ADSL: Retransmission Control Channel with reduced bandwidth for G.992.3
|
Broadcom
|
Q4/15
|
2008-01-29 |
|
[ 661 ]
|
ADSL: G.INP: Updated working text for retransmission
|
Broadcom
|
Q4/15
|
2008-01-29 |
|
[ 660 ]
|
.inp: Evaluation of Different Retransmission Methods for Impulse Noise Protection
|
Conexant Systems Inc
|
Q4/15
|
2008-01-29 |
|
[ 659 ]
|
G.inp: Proposed Protocol for Retransmission Above the Gamma Interface
|
Conexant, Infineon NA, 2-Wire, Ikanos, Aware
|
Q4/15
|
2008-01-29 |
|
[ 658 ]
|
G.vdsl: SOS working text proposal
|
Ikanos Comms, Conexant, Infineon USA
|
Q4/15
|
2008-01-29 |
|
[ 657 ]
|
Justification and Requirements for sub-ODU1 multiplexed services for metropolitan and wide area networks
|
Ciena Corporation, Vitesse Semiconductor
|
Q11//15
|
2008-01-29 |
|
[ 656 ]
|
Frame structures and multiplexing approach to support ODUk sub-wavelength service multiplexing in OTN
|
Ciena Corporation, Vitesse Semiconductor
|
Q11/15
|
2008-01-29 |
|
[ 655 ]
|
Overhead required to support sub-ODU1 service multiplexing and add/drop
|
Ciena Corporation, Vitesse Semiconductor
|
Q11/15
|
2008-01-29 |
|
[ 654 ]
|
DCN Architecture and Gateways
|
Ciena Corp
|
Q14/15, Q12/15
|
2008-01-29 |
|
[ 653 ]
|
Problems with G.8010
|
Ciena Corp
|
Q14/15, Q12/15, Q9/15
|
2008-01-29 |
|
[ 652 ]
|
Problems with G.7718.1
|
Ciena Corp
|
Q14/15
|
2008-01-29 |
|
[ 651 ]
|
The future of G.7716
|
Ciena Corp, Nortel Networks (USA)
|
Q12/15
|
2008-01-29 |
|
[ 650 ]
|
Addressing PDV aspects in packet networks
|
LSI Corporation
|
Q13/15
|
2008-01-29 |
|
[ 649 ]
|
PDV generation due to asymmetric traffic loading of packet switches
|
LSI Corporation
|
Q13/15
|
2008-01-29 |
|
[ 648 ]
|
g.hn media diagnostics
|
AT&T
|
Q4/15
|
2008-01-29 |
|
[ 647 ]
|
Draft Liaison to Q5 SG4 on Packet Delay Measurement Equipment
|
Symmetricom
|
Q13/15
|
2008-01-29 |
|
[ 646 ]
|
minTDEV Calculation Study
|
Symmetricom
|
Q13/15
|
2008-01-29 |
|
[ 645 ]
|
Principles of time-stamp methods
|
Semtech, Inc & Symmetricom
|
Q13/15
|
2008-01-29 |
|
[ 644 ]
|
Packet Timing (IEEE 1588, NTP) Telecom Reference Clock Model
|
Symmetricom
|
Q13/15
|
2008-01-29 |
|
[ 643 ]
|
Intra-Office Synchronization of Time and Frequency
|
Symmetricom
|
Q13/15
|
2008-01-29 |
|
[ 642 ]
|
Example IEEE1588 version 2 Telecommunications Profile for GSM/UMTS basestation synchronization
|
Symmetricom
|
Q13/15
|
2008-01-29 |
|
[ 641 ]
|
Template for a Telecommunications Profile for IEEE1588 version 2
|
Symmetricom
|
Q13/15
|
2008-01-29 |
|
[ 640 ]
|
Methods for Applying Traffic in Recommendation G.8261 Appendix VI
|
Symmetricom
|
Q13/15
|
2008-01-29 |
|
[ 639 ]
|
G.vdsl: Proposal for control of SOS
|
AT&T, Conexant Systems Inc
|
Q4/15
|
2008-01-28 |
|
[ 638 ]
|
G.vector: Enhancements to the Reference Model for G.Vector
|
ASSIA Inc.
|
Q4/15
|
2008-01-28 |
|
[ 637 ]
|
G.inp: Performance measurements of erasure decoding
|
Conexant Systems Inc
|
Q4/15
|
2008-01-28 |
|
[ 636 ]
|
G.gen: G.vdsl: G.ploam: Self-consistent Parameter Group
|
ASSIA Inc.
|
Q4/15
|
2008-01-28 |
|
[ 635 ]
|
G.VDSL: Proposed Baseline Text for Accuracy for Test Parameters in VDSL2
|
ASSIA Inc.
|
Q4/15
|
2008-01-28 |
|
[ 634 ]
|
Simulations data of "2dB filter bandwidths" for the study of 43Gb/s modulation formats (WD6-36)
|
Alcatel-Lucent
|
Q6/15
|
2008-01-28 |
|
[ 633 ]
|
Simulations data of "2dB filter bandwidths" for the study of OTU4 bitrates and modulation formats (WD6-34)
|
Alcatel-Lucent
|
Q6/15
|
2008-01-28 |
|
[ 632 ]
|
Proposal for note on regenerator jitter generation of STM256 interfaces for G.783
|
Alcatel-Lucent
|
Q13/15, Q9/15, Q6/15
|
2008-01-25 |
|
[ 631 ]
|
Proposal for finalising of work on STM256 jitter specification
|
Alcatel-Lucent
|
Q13/15, Q9/15, Q6/15
|
2008-01-25 |
|
[ 630 ]
|
Proposal of a corrigendum for G.8251 in relation to results of STM256 jitter specification
|
Alcatel-Lucent
|
Q13/15, Q9/15, Q6/15
|
2008-01-25 |
|
[ 629 ]
|
Proposal to revise G.8251 in relation to results of STM-256 jitter specifications
|
Germany
|
Q13/15
|
2008-01-24 |
|
[ 628 ]
|
G.650.3 Revision Proposal - Abstract
|
UK
|
Q5/15
|
2008-01-21 |
|
[ 627 ]
|
Revision of G.650.3 - Proposed new text
|
UK
|
Q5/15
|
2008-01-21 |
|
[ 626 ]
|
Manual switch command in G.8032
|
BT
|
Q9/15
|
2007-12-04 |
|
[ 625 ]
|
Extending Wait to Restore times in G.841, G.808.1, G.8031, G.8032
|
BT
|
Q9/15, Q11/15
|
2007-11-30 |
Results:289 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
|
Multiple Document Download: Formats and Languages to be included (when available):