Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 352 ]
|
Input on preliminary draft CPM text for WRC-19 agenda item 7 - Issue K
|
Papua New Guinea
|
AI7
|
2018-02-12 |
|
[ 350 ]
|
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 7 - issue J
|
Korea (Republic of)
|
AI7
|
2018-02-08 |
|
[ 349 ]
|
Proposed modifications to working document toward draft CPM text for WRC-19 agenda item 1.5
|
Korea (Republic of)
|
AI1.5
|
2018-02-08 |
|
[ 348 ]
|
Proposed updates to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS]
|
Korea (Republic of)
|
AI1.5
|
2018-02-08 |
|
[ 347 ]
|
Update on the sharing study with MS stations and aeronautical ESIM
|
Korea (Republic of)
|
|
2018-02-08 |
|
[ 346 ]
|
Modifications to the draft CPM text of agenda item 7, issue B
|
Spain
,
HISPASAT, S.A.
|
AI7
|
2018-02-07 |
|
[ 345 ]
|
Maritime-ESIM coexistence with FS stations
|
Germany (Federal Republic of)
|
|
2018-02-06 |
|
[ 344 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz
|
Japan
|
AI1.5
|
2018-02-06 |
|
[ 343 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
|
Japan
|
AI1.5
|
2018-02-06 |
|
[ 342 ]
|
Proposed modifications to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
|
Japan
|
AI9.1
|
2018-02-06 |
|
[ 341 ]
|
Proposed modifcations to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
|
Japan
|
AI9.1
|
2018-02-06 |
|
[ 340 ]
|
Proposal for amendments of CPM text - WRC-19 agenda item 7, issue J - Modification of Section 1, Annex 1 of RR AP30, pfd limit
|
Japan
|
AI7
|
2018-02-06 |
|
[ 339 ]
|
Proposal for amendments of CPM text - WRC-19 agenda item 7, issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments
|
Japan
|
AI7
|
2018-02-06 |
|
[ 338 ]
|
Proposal for the further discussion on working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the brining into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
|
Japan
|
AI7
|
2018-02-06 |
|
[ 337 ]
|
Proposed updates to the working document towards draft CPM text for agenda item 9.1, issue 9.1.2
|
France
|
AI9.1
|
2018-02-05 |
|
[ 336 ]
|
Draft Note to Director, Radiocommunication Bureau - Cost recovery for non -Geostationary satellite systems
|
United States of America
|
|
2018-01-26 |
|
[ 335 ]
|
Draft Note to the BR Director cost recovery for non-GSO satellite networks
|
Luxembourg
|
|
2018-01-15 |
|
[ 334 ]
|
Guidelines for reporting harmful interference for cases of GSO satellite services
|
World Broadcasting Unions - Technical Committee
|
|
2017-10-10 |
|
[ 333 ]
|
FSS technical parameters for sharing studies under WRC-19 agenda item 1.13 and 1.14
|
Inmarsat Plc.
|
AI1.14, AI1.13
|
2017-10-10 |
|
[ 332 ]
|
Working document toward a draft new Report - Technical feasibility of NGSO-to-GSO satellite links
|
United States of America
|
|
2017-10-10 |
|
[ 331 ]
|
Revisions to working document toward preliminary draft CPM text for WRC-19 agenda item 1.5
|
United States of America
|
AI1.5
|
2017-10-10 |
|
[ 330 ]
|
Revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
United States of America
|
AI1.5
|
2017-10-10 |
|
[ 329 ]
|
Working document towards a preliminary draft new Report ITU-R S.[ESIM] - Operation of earth stations in motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
|
United States of America
|
AI1.5
|
2017-10-10 |
|
[ 328 ]
|
Proposal for CPM text on WRC-19 agenda item 1.4 - Review of Annex 7 to Appendix 30 (Rev. WRC-12)
|
Papua New Guinea
|
AI1.4
|
2017-10-10 |
|
[ 327 ]
|
WRC-19 agenda item 7 issue A
|
Luxembourg
|
AI7
|
2017-10-10 |
|
[ 326 ]
|
Preliminary draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4
|
Luxembourg
|
AI1.4
|
2017-10-10 |
|
[ 325 ]
|
Preliminary draft new Report for WRC-19 agenda item 1.4 ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR - Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions - Agenda item 1.4
|
Luxembourg
|
AI1.4
|
2017-10-10 |
|
[ 324 ]
|
Alternative proposal regarding limitation A3 - Agenda item 1.4
|
Luxembourg
|
AI1.4
|
2017-10-10 |
|
[ 323 ]
|
Draft new Recommendation ITU-R S.[GUIDELINES_14.5-14.8 GHZ] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band 14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band 14.5-14.8 GHz, for Region 3 countries, in the fixed-satellite service (Earth-to-space) not for feeder links for the broadcasting-satellite service, ...
|
Luxembourg
|
|
2017-10-10 |
|
[ 322 ]
|
Sharing and compatibility between ESIM and terrestrial services
|
Austria
,
France
,
Germany (Federal Republic of)
,
Inmarsat Plc.
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
|
AI1.5
|
2017-10-10 |
|
[ 321 ]
|
Proposal for ammendments of CPM text - WRC-19 agenda item 1.4
|
Egypt (Arab Republic of)
,
Oman (Sultanate of)
,
Saudi Arabia (Kingdom of)
,
United Arab Emirates
|
AI1.4
|
2017-10-10 |
|
[ 320 ]
|
Technical characteristics of GSO FSS parameters WRC-19 agenda item 1.6
|
SES WORLD SKIES
|
|
2017-10-10 |
|
[ 319 ]
|
Proposed revisions to the working document towards preliminary draft CPM text for WRC-19 agenda item 1.6
|
SES WORLD SKIES
|
AI1.6
|
2017-10-10 |
|
[ 318 ]
|
Proposal to revise Recommendation ITU-R S.1782-0, possibilities for global broadband internet access by fixed satellite systems, along with the Recommendation ITU-R S.1783-0, technical and operational features characterizing high-density applications in the fixed-satellite service
|
France
|
|
2017-10-10 |
|
[ 317 ]
|
WRC-19 agenda item 7, issue A - Proposal for a milestone-based system to verify compliance of use of frequency assignments to non-Geostationary FSS systems with their associated notified characteristics
|
France
|
AI7
|
2017-10-10 |
|
[ 316 ]
|
WRC-19 agenda item 9.1, issue 9.1.3 - Possible regulatory option to address the needs of new non-Geostationary systems in the 3 700-4 200 MHz and 5 925-6 425 MHz frequency bands
|
France
|
AI9.1
|
2017-10-10 |
|
[ 315 ]
|
Proposed modifications to the preliminary draft new Report ITU-R S.[SPECTRUM_NEEDS] - WRC-19 agenda item 9.1 issue 9.1.9
|
France
|
AI9.1
|
2017-10-10 |
|
[ 314 ]
|
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - WRC-19 agenda item 9.1 issue 9.1.9
|
France
|
AI9.1
|
2017-10-10 |
|
[ 313 ]
|
Compatibility studies between a possible new allocation to the FSS in the 51.4 - 52.4 GHz band and the EESS (passive) in the 52.6 - 54.25 GHz band - WRC-19 agenda item 9.1, issue 9.1.9
|
France
|
AI9.1
|
2017-10-10 |
|
[ 312 ]
|
Draft CPM text on WRC-19 agenda item 9.1, issue 9.1.9
|
France
|
AI9.1
|
2017-10-10 |
|
[ 311 ]
|
Impact of the percentage of time in propagation between a time-invariant transmitter and a receiver
|
France
|
|
2017-10-10 |
|
[ 310 ]
|
Working document - Simplified regulatory regime for non-GSO satellites with short duration missions
|
South Africa (Republic of)
|
|
2017-10-10 |
|
[ 309 ]
|
Proposed changes to working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue G: Updating the reference situation for networks under RR Appendices 30 and 30A when provisional recording is used
|
Norway
|
AI7
|
2017-10-10 |
|
[ 308 ]
|
Studies on protection of FS links in EACO countries
|
Burundi (Republic of)
,
Kenya (Republic of)
,
Rwanda (Republic of)
,
South Sudan (Republic of)
,
Tanzania (United Republic of)
,
Uganda (Republic of)
|
AI1.5
|
2017-10-10 |
|
[ 307 ]
|
Justification statistics of RR Appendix 30B - On WRC-19, Issue E and New Issues X and Y
|
Iran (Islamic Republic of)
|
AI7
|
2017-10-10 |
|
[ 306 ]
|
Study of interference by a non-GSO system to a GSO system in Q/V frequency band
|
Iran (Islamic Republic of)
|
AI1.6
|
2017-10-10 |
|
[ 305 ]
|
Implementation of IMT sysem in frequency band 1 452-1 492 MHz Region 1
|
Iran (Islamic Republic of)
|
|
2017-10-10 |
|
[ 304 ]
|
Mobile Satellite-Service feeder link characteristics for studies regarding WRC-19 agenda item 1.16
|
Globalstar, Inc.
|
AI1.16
|
2017-10-10 |
|
[ 303 ]
|
Draft reply liaison statement to Working Party 1B - Studies on managing transmissions of terminals to be limited to authorised terminals
|
United States of America
|
|
2017-10-10 |
|
[ 302 ]
|
Agenda item 7, issue C - Issues for which consensus was readily achieved in ITU-R - Studies concerning the return of frequency notices under Radio Regulation (RR) no. 11.38 (C5)
|
United States of America
|
|
2017-10-10 |
Results:601 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):