International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4C  C 

ITU-R WP4C

Efficient Orbit/Spectrum Utilization for MSS and RDSS

Results:450 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 200 ]  
 
Preliminary draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY]- Methodology to calculate aeronautical mobile-satellite(R) service spectrum requirements within the frequency bands 1 545- 1 555 MHz (space-to-Earth) and 1646.5-1656.5 MHz (Earth-to-space)     United Kingdom of Great Britain and Northern Ireland   83-6/4   2013-09-16
[ 199 ]  
 
Preliminary draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY] - Methodology to calculate aeronautical mobile-satellite (R) service spectrum requirements within the frequency bands 1 545-1 555 MHz (space-to-Earth) and 1 646.5-1 656.5 MHz (Earth-to-space)     Canada , United States of America   83-6/4   2013-09-16
[ 198 ]  
 
Agenda item 1.10 To consider spectrum requirements and possible additional spectrum allocations for the mobile-satellite service in the Earth-to-space and space-to-Earth directions, including the satellite component for broadband applications, including International Mobile Telecommunications (IMT), within the frequency range from 22 GHz to 26 GHz, in accordance with Res. 234     Thuraya Telecommunications Company     2013-09-16
[ 197 ]  
 
Proposed revisions to preliminary draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY] - Methodology to calculate aeronautical mobile-satellite (R) service spectrum requirements within the frequency bands 1 545-1 555 MHz (space-to-Earth) and 1 646.5-1 656.5 MHz (Earth-to-space)     Russian Federation     2013-09-13
[ 196 ]  
 
Proposals for WRC-15 agenda item 1.10     Russian Federation     2013-09-13
[ 195 ]  
 
Proposals to modification Annex 1 to the working document towards a preliminary draft new Report ITU-R M.[MSS SHARE] - Sharing between GSO MSS and other services in the allocations in the 22-26 GHz range     Russian Federation     2013-09-13
[ 194 ]  
 
Proposals to modify working document - Draft CPM text for WRC-15 agenda item 1.10     Russian Federation     2013-09-13
[ 193 ]  
 
Proposals on WRC-15 agenda item 9.1.1     Russian Federation     2013-09-13
[ 192 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-15     Chairman, CPM-15     2013-09-10
[ 191 ]  
 
Liaison statement to ITU-R Study Groups 4, 6 and 7 and to ITU-T Study Group 5 - The effect on Telecommunications of an extreme solar event     WP 3L     2013-07-25
[ 190 ]  
 
Liaison statement to Study Group 4, Working Party 5B, Study Group 7 and ICAO - Request for measured data in connection with Question ITU-R 233/3 and Recommendation ITU-R P.528     WP 3K   233/3   2013-07-05
[ 189 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities     WP 1B     2013-06-21
[ 188 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 Agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station     WP 1B     2013-06-21
[ 187 ]  
 
Liaison statement to Working Party 4C - Draft revision of Recommendation ITU-R SM.1051     WP 1C     2013-06-20
[ 186 ]  
 
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks     WP 1A     2013-06-14
[ 185 ]  
 
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast     WP 1A     2013-06-14
[ 184 ]  
 
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T     WP 1A     2013-06-14
[ 183 ]  
 
Liaison statement to ITU-T Study Group 9 (Copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)     WP 1A     2013-06-14
[ 182 ]  
 
Liaison statement to ITU-R Working Party 4C - Information about the use of MSS systems in disaster response and relief     ITU-T FG DR&NRR     2013-06-13
[ 181 ]  
 
Liaison statement to Working Party 4C (copy to Working Party 4A) - WRC-15 Agenda item 1.10     WP 5B     2013-06-12
[ 180 ]  
 
Liaison statement to Working Party 4C - Working document on a PDN Report ITU-R M.[ADS-B]     WP 5B     2013-06-05
[ 179 ]  
 
Liaison statement to COSPAS-SARSAT (copy to ITU-R Working Party 4C for information)     WP 5B     2013-06-05
[ 178 ]  
 
Liaison statement to Working Party 4C - Studies to assist coordination between RDSS or MSS and the fixed service in the 2 483.5-2 500 MHz band     WP 5C     2013-06-05
[ 177 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 Agenda item 1.1     WP 5A     2013-06-04
[ 176 ]  
 
Liaison statement to ITU-R Working Party 1A and ITU-T Study Group 9 (copied for information to ITU-T Study Groups 5 and 15, and ITU-R Working Parties 3L, 4C, 5D, 6A, 7C and 7D) - Impact from wired telecommunication (including PLT) on Radiocommunication systems     WPs 5A, 5B and 5C     2013-06-03
[ 175 ]  
 
Liaison statement to Working Parties 5A, 5C and 4C - (WRC-15 Agenda item 1.16)     WP 5B     2013-05-24
[ 174 ]  
 
Liaison statement on nomination of JCA-AHF representatives     ITU-T JCA-AHF     2013-05-14
[ 173 ]  
+Ann.1-20 
Report on the eleventh meeting of Working Party 4C (Geneva, 25 April - 1 May 2013)     Chairman, WP 4C     2013-05-01
[ 172 ]  
 
Final list of participants - Working Party 4C (Geneva, 25 April - 1 May 2013)     Director, BR     2013-05-01
[ 171 ]  
 
List of documents issued (Documents 4C/91 - 4C/171)     BR Study Groups Department     2013-04-26
[ 170 ]  
 
ICT sectorial consultation on the role of ICTS to promote the inclusion of persons with disabilities - Request for inputs from relevant ITU-R Study Groups     Note by the Secretary-General     2013-04-19
[ 169 ]  
 
Question ITU-R 136-1/6     SG 6     2013-04-19
[ 168 ]  
 
Agenda item 1.10 - To consider spectrum requirements and possible additional spectrum allocations for the mobile-satellite service in the Earth-to-space and space-to-Earth directions, including the satellite component for broadband applications, including International Mobile Telecommunications (IMT), within the frequency range from 22 GHz to 26 GHz, ...     United Arab Emirates     2013-04-18
[ 167 ]  
 
Proposed preliminary draft new Recommendation ITU-R M.[AMS(R)S.METHODOLOGY] in response to Resolution 422 (WRC-12)     Japan   83-6/4   2013-04-18
[ 166 ]  
 
Proposed modifications to preliminary draft revision of Recommendation ITU-R M.1831 - A coordination methodology for RNSS inter-system interference estimation     Japan   217-2/4   2013-04-18
[ 165 ]  
 
Preliminary draft revision of Recommendation ITU-R M.1787-1 - Description of systems and networks in the radionavigation-satellite service (space-to-Earth and space-to-space) and technical characteristics of transmitting space stations operating in the bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz     Japan   288/4, 217-2/4   2013-04-18
[ 164 ]  
 
Information document to Working Party 4C - Space-based ADS-B     United States of America     2013-04-17
[ 163 ]  
 
Preliminary draft new Recommendation ITU-R M.[MSS 400 MHz] - Characteristics and protection criteria for non-GSO MSS operation in the band 399.9-400.05 MHz     France     2013-04-17
[ 162 ]  
 
Proposed revision of Recommendation ITU-R M.1478-2 concerning GALILEO MEOSAR space segment - Protection criteria for Cospas-Sarsat search and rescue instruments in the band 406-406.1 MHz     France , European Space Agency     2013-04-17
[ 161 ]  
 
Proposed revisions to working document towards a preliminary draft new Report ITU-R M.[AI_9.1.1] - WRC-15 Agenda item 9.1.1 - Protection of the 406-406.1 MHz band     France , European Space Agency     2013-04-17
[ 160 ]  
 
Proposal of CPM text concerning Agenda item 9.1.1     France     2013-04-17
[ 159 ]  
 
Proposed revisions to a preliminary draft new Report ITU-R M.[AI_9.1.1] - WRC-15 Agenda item 9.1.1 - Protection of the 406-406.1 MHz band     France     2013-04-17
[ 158 ]  
 
Working document towards a draft CPM text for protection of the systems operating in the mobile-satellite service in the band 406 - 406.1 MHz - WRC-15 Agenda item 9.1.1 - Protection of the 406-406.1 MHz band     Canada     2013-04-17
[ 157 ]  
 
Working document in response to Resolution 422 (WRC-12) - General principles, guidelines and example methodology to calculate spectrum requirements to satisfy AMS(R)S access within the bands 1 545-1 555 MHz (space-to-Earth) and 1 646.5-1 656.5 MHz (Earth-to-space)     Canada , United States of America   83-6/4   2013-04-17
[ 156 ]  
 
Spectrum requirements for future maritime mobile satellite service in the band 7/8 GHz     France     2013-04-17
[ 155 ]  
 
Sharing between the fixed service and the maritime-mobile satellite service (space-to-Earth) - WRC-15 Agenda item 1.9.2     France     2013-04-17
[ 154 ]  
 
Sharing study between the EESS (space-to-Earth) and the MMSS (Earth-to-space) in the band 8 025-8 400 MHz     France     2013-04-17
[ 153 ]  
 
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)     ITU-T FG-DR&NRR     2013-04-17
[ 152 ]  
 
Working document towards preliminary draft new Report ITU-R M.[RNSS_MULTI_EESS] - Consideration of aggregate RFI event potentials from multiple EESS systems on RNSS receivers in the 1 215-1 300 MHz frequency band     United States of America     2013-04-16
[ 151 ]  
 
Draft liaison statement to the International Civil Aviation Organization (copy to ITU-R Working Party 5B) - Request for information on current and planned AM(R)S systems operating in the 5 030-5 091 MHz band     United States of America     2013-04-16
Results:450 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-19