Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 25 ]
|
WRC Resolutions and Recommendations related to the work of Study Group 7
|
Chairman, SG 7
|
|
2008-03-24 |
|
[ 24 ]
|
The operation and technical characteristics of the Meteor-M-1 mission
|
Russian Federation
|
235/7, 141/7, 139/7
|
2008-03-21 |
|
[ 23 ]
|
Preliminary draft new Recommendation ITU-R RS.[PATTERN EESS] - Reference antenna pattern for passive sensors operating in the Earth exploration-satellite service (passive) to be used in compatibility analsyses [in the frequency range 1.4-100 GHz]
|
France
|
232/7, 215/7, 233/7
|
2008-03-21 |
|
[ 22 ]
|
List and definition of parameters concerning the technicla and operational characteristics of passive sensors below 275 GHz
|
France
|
|
2008-03-21 |
|
[ 21 ]
|
Agenda item 1.6, WRC-11: Spectrum use by the passive services between 275 GHz and 3 000 GHz
|
France
|
235/7
|
2008-03-21 |
|
[ 20 ]
|
Beam efficiency of the proposed antenna pattern for passive sensors
|
France
|
|
2008-03-21 |
|
[ 19 ]
|
Draft reply liaison to ITU-D SG 2 RG Q22/2 - Proposed replacement annex for ITU-D Study Group 2 Document 138, Annex 4
|
United States of America
|
|
2008-03-20 |
|
[ 18 ]
|
Proposed modifications to Recommendation ITU-R RS.1166-3 - Performance and interference criteria for active spaceborne sensors
|
United States of America
|
|
2008-03-20 |
|
[ 17 ]
|
Working document towards a report or recommendation on the use of passive remote sensing spectrum between 275 and 3 000 GHz
|
United States of America
|
235/7
|
2008-03-20 |
|
[ 16 ]
|
Proposed preliminary draft revision to Recommendation ITU-R RS.577-5: Preferred frequencies and necessary bandwidths for spaceborne active remote sensors
|
United States of America
|
|
2008-03-20 |
|
[ 15 ]
|
Draft reply liaison statement to Working Party 3J (copy to Working Party 1A) - Typical bandwidths for radiocommunication systems under the purview of Working Party 7C
|
United States of America
|
|
2008-03-20 |
|
[ 14 ]
|
Working document - Planning for studies in support of WRC-11 Agenda item 1.16 - (Resolution 671[COM6/16] (WRC-11)) - Recognition of systems in the meteorological aids service in the frequency range below 20 kHz
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 13 ]
|
Draft liaison statement to Working Party 7A - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16] (WRC-07))
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 12 ]
|
Draft liaison statement to Working Party 5C - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 11 ]
|
Draft liaison statement to Working Party 5B - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 10 ]
|
Draft liaison statement to Working Parties 3J and 3L - Considerations relating to propagation models for studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))
|
United Kingdom of Great Britain and Northern Ireland
|
|
2008-03-20 |
|
[ 9 ]
(Rev.1) |
WRC-11 AI 1.6: Review No. 5.565 (Passive sensing 275-3 000 GHz) and optical links
|
European Space Agency
|
|
2008-03-18 |
|
[ 8 ]
|
Structure of Study Group 7 and its Working Parties
|
Chairman, SG 7
|
|
2008-03-13 |
|
[ 7 ]
|
Liaison statement to WP 4A (copied to WPs 3M, 5A, 5B, 7B and 7C) - Gateway links for high altitude platforms stations in the range from 5 850 to 7 075 MHz
|
WP 5C
|
|
2008-02-19 |
|
[ 6 ]
|
Liaison statement to Working Parties 1A, 4A, 7B, 7C and 7D - WRC-11 Agenda item 1.8 - consideration of technical and regulatory issues relative to the fixed service in the bands between 71 GHz and 238 GHz
|
WP 5C
|
|
2008-02-19 |
|
[ 5 ]
|
Preparation of the CPM Report to WRC-11 following the results of the first session of CPM-11
|
Chairman, CPM-11
|
|
2008-01-29 |
|
[ 4 ]
|
Recommendation to be brought to the attention of Study Groups 3, 4 and 7
|
BR, Study Group Department
|
|
2008-01-16 |
|
[ 3 ]
|
Recommendation to be brought to the attention of Study Group 7
|
BR Study Group Department
|
|
2008-01-16 |
|
[ 2 ]
|
Reply liaison statement to ITU-R Study Group 7 regarding a working document towards a ITU-D Study Group 2 Report on the use of remote sensing for disaster prediction, detection and mitigation
|
ITU-D Study Group 2
|
22/2
|
2007-11-20 |
|
[ 1 ]
|
Documents to be carried over from the 2003-2007 Study period
|
WP 7C
|
|
2007-11-19 |
Results:275 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
|
Multiple Document Download: Formats and Languages to be included (when available):