Delayed Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 648 ]
|
Characteristics of optical fibre submarine cable
|
MII China
|
Q8/15
|
2006-01-27 |
|
[ 647 ]
|
Draft Liaison Statement for Synchronous Ethernet OUI
|
BT
|
Q13/15
|
2006-01-27 |
|
[ 646 ]
|
Input to G.pactiming on DS1 network limits for CES
|
USA
|
Q13/15
|
2006-01-27 |
|
[ 645 ]
|
Missing words in G.707
|
Nortel Networks
|
Q11/15
|
2006-01-27 |
|
[ 644 ]
|
Client Service Management Methodology considerations
|
Nortel Networks
|
Q11/15
|
2006-01-27 |
|
[ 643 ]
|
Ethernet timing flows
|
Nortel Networks
|
Q13/15
|
2006-01-27 |
|
[ 642 ]
|
Comments on Transport MPLS SCN
|
Tellabs
|
Q12/15
|
2006-01-27 |
|
[ 641 ]
|
Synchronous Connection Points
|
Tellabs
|
Q12/15
|
2006-01-27 |
|
[ 640 ]
|
Comment on Appendix on PWE3 - MPLS Interworking
|
Tellabs
|
Q12/15
|
2006-01-27 |
|
[ 639 ]
|
Modelling Terminology Mapping
|
Tellabs
|
Q12/15
|
2006-01-27 |
|
[ 638 ]
|
G.shdsl, G.selt: SHDSL Test Parameters
|
Infineon
|
Q4/15
|
2006-01-27 |
|
[ 637 ]
|
ADSL: Working Text for India Annex
|
BSNL
|
Q4/15
|
2006-01-27 |
|
[ 636 ]
|
PLOAM: Proposal to change the definition of Severely errored second -line (SES-L) to accommodate for dual latency application
|
LM Ericsson AB
|
Q4/15
|
2006-01-27 |
|
[ 635 ]
|
Relation between ITU-T and other SDOs or consortia in the context of the "black link" approach
|
Deutsche Telekom
|
Q6/15
|
2006-01-27 |
|
[ 634 ]
|
Clash of SNC-P protection within TCM section and addendum to ITU-T G.803
|
MII India
|
Q12/15
|
2006-01-27 |
|
[ 633 ]
|
Reserved Labels for Transport MPLS
|
Alcatel
|
Q12/15, Q11/15, Q9/15
|
2006-01-27 |
|
[ 632 ]
|
Control of a T-MPLS packet transport network
|
Alcatel
|
Q14/15, Q12/15
|
2006-01-27 |
|
[ 631 ]
|
Issues with use of Slow protocol OAM PDUs for SSM in Ethernet networks
|
Lucent Technologies Germany
|
Q13/15
|
2006-01-27 |
|
[ 630 ]
|
Improvement of clause 10 of G.pactiming in respect to normative and informative content
|
Lucent Technologies Germany
|
Q13/15
|
2006-01-27 |
|
[ 629 ]
|
Requirements of 10GE LAN signal transport over OTN ODU connections
|
Lucent Technologies Germany
|
Q11/15, Q12/15
|
2006-01-27 |
|
[ 628 ]
|
WITHDRAWN (same as D596)
Same as D.596
|
N/A
|
Q12/15
|
2006-01-27 |
|
[ 627 ]
|
Line diagnostics functionality
|
BT
|
Q4/15
|
2006-01-27 |
|
[ 626 ]
|
G.VDSL Capacity Simulations using Band Plans for 7 MHz and above
|
BT
|
Q4/15
|
2006-01-27 |
|
[ 625 ]
|
Ethernet Clock extraction and insertion
|
BT
|
Q13/15, Q12/15, Q9/15
|
2006-01-27 |
|
[ 624 ]
|
Comments/additions to G.7714.1
|
BT
|
Q14/15
|
2006-01-27 |
|
[ 623 ]
|
Limiting jitter & wander production - SyncEth Network Clock
|
BT
|
Q13/15
|
2006-01-27 |
|
[ 622 ]
|
Enhancements to G.pactiming Appendix VIII
|
BT
|
Q13/15
|
2006-01-27 |
|
[ 621 ]
|
Proposed New Draft Recommendation G.PBT
|
BT
|
Q12/15
|
2006-01-27 |
|
[ 620 ]
|
Simulation and Test Configurations for Clock Synchronization over Packet Networks
|
Nortel Networks (Canada)
|
Q13/15
|
2006-01-27 |
|
[ 619 ]
|
VDSL2: DPBO specifications of G.993.2 Annex C; the revised version of MG-031
|
NTT
,
SoftbankBB
,
NEC
,
Fujitsu
,
ACCA
|
Q4/15
|
2006-01-27 |
|
[ 618 ]
|
Topics for a Liaison Statement to IEC on restart conditions after APR (G.664)
|
Deutsche Telekom
|
Q6/15
|
2006-01-27 |
|
[ 617 ]
|
Unified Functional Model
|
Ciena
|
Q12/15
|
2006-01-27 |
|
[ 616 ]
|
Comments on G.7718.1 UML
|
Ciena
|
Q14/15
|
2006-01-27 |
|
[ 615 ]
|
Role of ITU-T work on Ethernet Equipment
|
Ciena
|
Q9/15
|
2006-01-27 |
|
[ 614 ]
|
GFP MTU sizes for the GFP-F Payload
|
Deutsche Telekom
|
Q11/15
|
2006-01-27 |
|
[ 613 ]
|
Incorporation of Provide Bridge issues in Recommendation G.8012
|
Deutsche Telekom
|
Q11/15
|
2006-01-27 |
|
[ 612 ]
|
Deletion of length encapsulation from subclause 6.1.2/G.8012
|
Deutsche Telekom
|
Q11/15
|
2006-01-27 |
|
[ 611 ]
|
Proposal for application codes using EDC for 80km 10 Gb/s applications in G.959.1 and supporting data
|
AMCC
|
Q6/15
|
2006-01-27 |
|
[ 610 ]
|
Considerations on unified model
|
Siemens
|
Q12/15
|
2006-01-27 |
|
[ 609 ]
|
Proposed extended definition of transport entity
|
Alcatel
|
Q12/15
|
2006-01-27 |
|
[ 608 ]
|
Proposal for G.652 compliant G.smx fibres
|
Italy
|
Q5/15, Q10/15
|
2006-01-27 |
|
[ 607 ]
|
Comments on the proposal for the new Recommendation G.650.3
|
Telecom Italia
|
Q5/15
|
2006-01-27 |
|
[ 606 ]
|
Values of PXC transfer parameters for G.otf
|
Telecom Italia
|
Q7/15, Q6/15
|
2006-01-27 |
|
[ 605 ]
|
Values of OADM transfer parameters for G.otf
|
Telecom Italia
|
Q7/15, Q6/15
|
2006-01-27 |
|
[ 604 ]
|
Proposals for the new Recommendation G.dapp.2
|
Telecom Italia
|
Q6/15
|
2006-01-27 |
|
[ 603 ]
(Rev.1) |
Support for consenting Transport MPLS Recommendations
|
Italy
,
France
|
Q12/15, Q11/15, Q9/15
|
2006-01-27 |
|
[ 602 ]
|
Improvements proposals for the G.pactiming
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 601 ]
|
Proposals for improvements of Figure 2 in G.pactiming
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 600 ]
|
Proposals on Study Point 20 in G.pactiming Living List
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 599 ]
|
Proposals on Network Limits (clause 7) in G.pactiming
|
Ericsson
|
Q13/15
|
2006-01-27 |
Results:217 total items. Result page:
-
1 -
2 -
3 -
4 -
5
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):