International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2006-02-06 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2006-02-06) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2006-02-06 to 2006-02-17

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2007-06-04  2006-10-30  [ 2006-02-06 ]  2005-05-16  2004-11-29 

Results:217 total items.
Result page:   -  1 - 2 - 3 - 4 - 5  - Next Next
Delayed Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 648 ]  
 
Characteristics of optical fibre submarine cable     MII China   Q8/15   2006-01-27
[ 647 ]  
 
Draft Liaison Statement for Synchronous Ethernet OUI     BT   Q13/15   2006-01-27
[ 646 ]  
 
Input to G.pactiming on DS1 network limits for CES     USA   Q13/15   2006-01-27
[ 645 ]  
 
Missing words in G.707     Nortel Networks   Q11/15   2006-01-27
[ 644 ]  
 
Client Service Management Methodology considerations     Nortel Networks   Q11/15   2006-01-27
[ 643 ]  
 
Ethernet timing flows     Nortel Networks   Q13/15   2006-01-27
[ 642 ]  
 
Comments on Transport MPLS SCN     Tellabs   Q12/15   2006-01-27
[ 641 ]  
 
Synchronous Connection Points     Tellabs   Q12/15   2006-01-27
[ 640 ]  
 
Comment on Appendix on PWE3 - MPLS Interworking     Tellabs   Q12/15   2006-01-27
[ 639 ]  
 
Modelling Terminology Mapping     Tellabs   Q12/15   2006-01-27
[ 638 ]  
 
G.shdsl, G.selt: SHDSL Test Parameters     Infineon   Q4/15   2006-01-27
[ 637 ]  
 
ADSL: Working Text for India Annex     BSNL   Q4/15   2006-01-27
[ 636 ]  
 
PLOAM: Proposal to change the definition of Severely errored second -line (SES-L) to accommodate for dual latency application     LM Ericsson AB   Q4/15   2006-01-27
[ 635 ]  
 
Relation between ITU-T and other SDOs or consortia in the context of the "black link" approach     Deutsche Telekom   Q6/15   2006-01-27
[ 634 ]  
 
Clash of SNC-P protection within TCM section and addendum to ITU-T G.803     MII India   Q12/15   2006-01-27
[ 633 ]  
 
Reserved Labels for Transport MPLS     Alcatel   Q12/15, Q11/15, Q9/15   2006-01-27
[ 632 ]  
 
Control of a T-MPLS packet transport network     Alcatel   Q14/15, Q12/15   2006-01-27
[ 631 ]  
 
Issues with use of Slow protocol OAM PDUs for SSM in Ethernet networks     Lucent Technologies Germany   Q13/15   2006-01-27
[ 630 ]  
 
Improvement of clause 10 of G.pactiming in respect to normative and informative content     Lucent Technologies Germany   Q13/15   2006-01-27
[ 629 ]  
 
Requirements of 10GE LAN signal transport over OTN ODU connections     Lucent Technologies Germany   Q11/15, Q12/15   2006-01-27
[ 628 ]  
 
WITHDRAWN (same as D596)  
Same as D.596
 
N/A   Q12/15   2006-01-27
[ 627 ]  
 
Line diagnostics functionality     BT   Q4/15   2006-01-27
[ 626 ]  
 
G.VDSL Capacity Simulations using Band Plans for 7 MHz and above     BT   Q4/15   2006-01-27
[ 625 ]  
 
Ethernet Clock extraction and insertion     BT   Q13/15, Q12/15, Q9/15   2006-01-27
[ 624 ]  
 
Comments/additions to G.7714.1     BT   Q14/15   2006-01-27
[ 623 ]  
 
Limiting jitter & wander production - SyncEth Network Clock     BT   Q13/15   2006-01-27
[ 622 ]  
 
Enhancements to G.pactiming Appendix VIII     BT   Q13/15   2006-01-27
[ 621 ]  
 
Proposed New Draft Recommendation G.PBT     BT   Q12/15   2006-01-27
[ 620 ]  
 
Simulation and Test Configurations for Clock Synchronization over Packet Networks     Nortel Networks (Canada)   Q13/15   2006-01-27
[ 619 ]  
 
VDSL2: DPBO specifications of G.993.2 Annex C; the revised version of MG-031     NTT , SoftbankBB , NEC , Fujitsu , ACCA   Q4/15   2006-01-27
[ 618 ]  
 
Topics for a Liaison Statement to IEC on restart conditions after APR (G.664)     Deutsche Telekom   Q6/15   2006-01-27
[ 617 ]  
 
Unified Functional Model     Ciena   Q12/15   2006-01-27
[ 616 ]  
 
Comments on G.7718.1 UML     Ciena   Q14/15   2006-01-27
[ 615 ]  
 
Role of ITU-T work on Ethernet Equipment     Ciena   Q9/15   2006-01-27
[ 614 ]  
 
GFP MTU sizes for the GFP-F Payload     Deutsche Telekom   Q11/15   2006-01-27
[ 613 ]  
 
Incorporation of Provide Bridge issues in Recommendation G.8012     Deutsche Telekom   Q11/15   2006-01-27
[ 612 ]  
 
Deletion of length encapsulation from subclause 6.1.2/G.8012     Deutsche Telekom   Q11/15   2006-01-27
[ 611 ]  
 
Proposal for application codes using EDC for 80km 10 Gb/s applications in G.959.1 and supporting data     AMCC   Q6/15   2006-01-27
[ 610 ]  
 
Considerations on unified model     Siemens   Q12/15   2006-01-27
[ 609 ]  
 
Proposed extended definition of transport entity     Alcatel   Q12/15   2006-01-27
[ 608 ]  
 
Proposal for G.652 compliant G.smx fibres     Italy   Q5/15, Q10/15   2006-01-27
[ 607 ]  
 
Comments on the proposal for the new Recommendation G.650.3     Telecom Italia   Q5/15   2006-01-27
[ 606 ]  
 
Values of PXC transfer parameters for G.otf     Telecom Italia   Q7/15, Q6/15   2006-01-27
[ 605 ]  
 
Values of OADM transfer parameters for G.otf     Telecom Italia   Q7/15, Q6/15   2006-01-27
[ 604 ]  
 
Proposals for the new Recommendation G.dapp.2     Telecom Italia   Q6/15   2006-01-27
[ 603 ]  
(Rev.1) 
Support for consenting Transport MPLS Recommendations     Italy , France   Q12/15, Q11/15, Q9/15   2006-01-27
[ 602 ]  
 
Improvements proposals for the G.pactiming     Ericsson   Q13/15   2006-01-27
[ 601 ]  
 
Proposals for improvements of Figure 2 in G.pactiming     Ericsson   Q13/15   2006-01-27
[ 600 ]  
 
Proposals on Study Point 20 in G.pactiming Living List     Ericsson   Q13/15   2006-01-27
[ 599 ]  
 
Proposals on Network Limits (clause 7) in G.pactiming     Ericsson   Q13/15   2006-01-27
Results:217 total items.
Result page:   -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2006-02-02