Delayed Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 757 ]
|
VDSL: Proposal for the VDSL Line Code
|
Actelis
,
Audio Codes
,
ADC
|
Q4/15
|
2003-10-06 |
|
[ 756 ]
|
Line Code Selection for VDSL Recommendation
|
Ikanos
|
Q4/15
|
2003-10-06 |
|
[ 755 ]
|
Application codes with 16 wavelengths for G.695
|
OFS Fitel
|
Q16/15
|
2003-10-06 |
|
[ 754 ]
|
Considerations For Progressing G.fame
|
Telcordia
|
Q14/15
|
2003-10-03 |
|
[ 753 ]
|
VDSL: Proposal for compromise on the VDSL linecode
|
Belgium
|
Q4/15
|
2003-10-03 |
|
[ 752 ]
|
OTN Linear Protection - Alignment of OTN Recommendations
|
Marconi
|
Q12/15, Q9/15
|
2003-10-03 |
|
[ 751 ]
|
LCAS Parameters processes - LOPC and LOTC
|
Marconi
|
Q9/15
|
2003-10-03 |
|
[ 750 ]
|
Comments on G.ethserv
|
Marconi
|
Q12/15
|
2003-10-03 |
|
[ 749 ]
|
Changes to Recommendations G.992.5 and G.994.1 for ADSLplus from the cabinet
|
BT
|
Q4/15
|
2003-10-03 |
|
[ 748 ]
|
DCME Tandem Avoidance in case of VBR
|
Siemens
|
Q5/15
|
2003-10-02 |
|
[ 747 ]
|
TFO configurations with TIGIN
|
Siemens
|
Q7/15
|
2003-10-02 |
|
[ 746 ]
|
Supporting LCAS and Virtual Concatenation (VC) in the ASON
|
Huawei
|
Q14/15, Q12/15
|
2003-10-02 |
|
[ 745 ]
|
Requirements for Non-interrupted Interchangeability between PC and SPC/SC in ASON
|
Huawei
|
Q14/15, Q12/15
|
2003-10-02 |
|
[ 744 ]
|
New Function Proposed To G.slet
|
Huawei
|
Q14/15, Q4/15
|
2003-10-02 |
|
[ 743 ]
|
Proposed Method To Do ADSL Port self diagnostic in G.selt
|
Huawei
|
Q14/15, Q4/15
|
2003-10-02 |
|
[ 742 ]
|
Proposal for Routing in MSSPRing
|
Huawei
|
Q14/15, Q12/15
|
2003-10-02 |
|
[ 741 ]
|
Suggest that Q4 setup an new study on the remote and centralized management for xDSL CPEs
|
Huawei
|
Q14/15, Q4/15
|
2003-10-02 |
|
[ 740 ]
|
Requirement for supporting Virtual Concatenation and LCAS in the ASON
|
China Telecom
|
Q14/15, Q12/15
|
2003-10-02 |
|
[ 739 ]
|
Position of RPR within an Ethernet over Transport network
|
Alcatel Shanghai Bell
|
Q12/15
|
2003-10-02 |
|
[ 738 ]
|
A proposal on basic forms of algorithm for dynamic routing
|
ZTE China
|
Q14/15
|
2003-10-02 |
|
[ 737 ]
|
Take actions to deal with frequent operation of protection switch
|
ZTE China
|
Q9/15
|
2003-10-02 |
|
[ 736 ]
|
A proposed framework of recommendation for fibre Raman amplifiers
|
ZTE China
|
Q17/15
|
2003-10-02 |
|
[ 735 ]
|
A proposal on drafting a new ITU-T recommendation on Raman amplifiers
|
ZTE China
|
Q17/15
|
2003-10-02 |
|
[ 734 ]
|
Draft new Recommendation G.695 version 0.8 (for consent)
|
Editor Rec. G.695
|
Q16/15
|
2003-10-01 |
|
[ 733 ]
|
Application and parameter proposals for Recommendation G.695 V0.8
|
Editor Rec. G.695
|
Q16/15
|
2003-10-01 |
|
[ 732 ]
|
Draft revised Recommendation G.693 (for consent)
|
Editor Rec. G.693
|
Q16/15
|
2003-10-01 |
|
[ 731 ]
|
Coexistence of GFP alternatives at EOT NNI
|
Huawei
|
Q12/15, Q11/15
|
2003-10-01 |
|
[ 730 ]
|
Add QTag process attribute for Ethernet service in G.ethsrv
|
Huawei
|
Q12/15
|
2003-10-01 |
|
[ 729 ]
|
Discovery process after establishment of the server layer connection by the control plane
|
ZTE China
|
Q14/15
|
2003-10-01 |
|
[ 728 ]
|
A proposal on maintaining the layer adjacency association
|
ZTE China
|
Q14/15
|
2003-10-01 |
|
[ 727 ]
|
Adding more parameters in G.691 to improve interoperability on SDH/SONET equipments with optical amplifiers
|
ZTE China
|
Q16/15
|
2003-10-01 |
|
[ 726 ]
|
Proposal of maximum DGD value for RZ 10G based applications
|
Huawei
|
Q16/15
|
2003-10-01 |
|
[ 725 ]
|
parameter value specifications for 40-channel NRZ and RZ 10G based DWDM ULH applications on G.65 and G.655
|
Huawei
|
Q16/15
|
2003-10-01 |
|
[ 724 ]
|
Connectionless-Oriented 1+1 Packet Switch in SCN
|
ZTE China
|
Q14/15
|
2003-10-01 |
|
[ 723 ]
|
Proposal for Virtual Connection
|
ZTE China
|
Q14/15
|
2003-10-01 |
|
[ 722 ]
|
Link layer encapsulation type auto-negotiation
|
ZTE China
|
Q12/15
|
2003-10-01 |
|
[ 721 ]
|
LAPS attributes need to be defined in Recommendation G.etnni
|
Huawei Technologies
|
Q12/15, Q11/15
|
2003-10-01 |
|
[ 720 ]
|
Comments on Recommendation G.ethsrv
|
ZTE China
|
Q12/15
|
2003-10-01 |
|
[ 719 ]
|
Draft revised Recommendation G.799.1 version 10 (for consent)
|
Editor Rec. G.799.1
|
Q7/15
|
2003-10-01 |
|
[ 718 ]
|
Improved interferometric PMD test method - new exact analysis and RTM equivalent results for any mode coupling condition: Proposal to modify text in G.650.2
|
EXFO Electro-Optical Engineering
|
Q15/15
|
2003-09-22 |
|
[ 717 ]
|
Draft new Recommendation G.7715.1/Y.1706.1 (for consent)
|
Editors Rec. G.7715.1
|
Q14/15
|
2003-09-16 |
|
[ 716 ]
|
Proposed Corrigendum to Recommendation G.872 (for consent)
|
Editor Rec. G.872
|
Q12/15
|
2003-09-16 |
|
[ 715 ]
|
EPLAN characteristics
|
ZTE Corporation of China
|
Q12/15
|
2003-09-10 |
|
[ 714 ]
|
More on XYZ layer requirements
|
ZTE Cooperation of China
|
Q12/15
|
2003-09-10 |
|
[ 713 ]
|
Revised proposal to modify Sections 5 and 6 of G.694.1
|
MII China
|
Q16/15
|
2003-09-10 |
|
[ 712 ]
|
Proposal for CWDM system application code in G.695
|
Alcatel Shanghai Bell
|
Q16/15
|
2003-09-10 |
|
[ 711 ]
|
Transmission schemes of SS7 Signaling optimized for IP-CME
|
Editor Rec. G.ipcme
|
Q5/15
|
2003-01-11 |
|
[ 710 ]
|
Discussion on objective SNR measures for G.VED (G.162)
|
LM Ericsson
|
Q6/15
|
2003-01-10 |
|
[ 709 ]
|
Proposed Edits to the Example PSDs in Draft Appendix V for use in TCM ISDN Environment
|
Fujitsu
,
ACCA Networks
|
Q4/15
|
2003-01-10 |
|
[ 708 ]
|
ADSL: Proposed Amendment to G.992.2 Annex C for improved robustness and extended reach (for consent)
|
Sumitomo Electric Industries
,
Oki Electric Industry
,
NEC
,
Matsushita
,
Fujitsu
,
eAccess
,
Acca Networks
|
Q4/15
|
2003-01-10 |
Results:982 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):