International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient orbit/spectrum utilization for FSS and BSS

Results:609 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 384 ]  
 
Preliminary draft revision of Recommendation ITU-R BO.1659 - Mitigation techniques for rain attenuation for broadcasting-satellite service systems in frequency bands between 17.3 GHz and 42.5 GHz     Korea (Republic of)   104/6, 21/6, 22-1/6   2010-06-21
[ 383 ]  
 
Draft CPM text on WRC-12 Agenda item 1.13     Korea (Republic of)     2010-06-21
[ 382 ]  
 
Liaison statement to Working Party 4A on potential candidate bands for BSS feeder links     WP 7B     2010-06-21
[ 381 ]  
 
Liaison statement to Working Party 4A - WRC-12 Agenda item 1.13     WP 7D     2010-06-21
[ 380 ]  
 
Liaison statement to Working Party 4A - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz     WP 5C     2010-06-04
[ 379 ]  
 
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.3 - Use of FSS for unmanned aircraft contorl links     WP 5B     2010-06-02
[ 378 ]  
 
Liaison statement to Working Pary 4A - Revision of Recommendation ITU-R SF.675-3 "Calculation of the maximum power density (averaged over 4 kHz) of an angle modulated carrier"     WP 5C     2010-05-28
[ 377 ]  
 
Liaison statement to Working Party 4A - Review of certain SF-series Recommendations     WP 5C     2010-05-28
[ 376 ]  
 
Liaison statement to Working Party 4A - WRC-12 Agenda item 1.13 (Resolution 551 (WRC-07))     WP 5C     2010-05-28
[ 375 ]  
 
Liaison statement to Working Party 4A on a methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz     WP 5C     2010-05-28
[ 374 ]  
 
Liaison statement to WP 4A regarding potential candidate bands for BSS feeder links under WRC-12 Agenda item 1.13     WP 5A     2010-05-26
[ 373 ]  
 
Liaison statement to WP 4A - Compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band     WP 5A     2010-05-26
[ 372 ]  
 
Liaison statement to Working Party 4B on the treatment of BO Series Recommendations (copy to Working Party 4A for information) - Response to comments on the proposed treatment of Recommendation of former Working Party 6S     WP 6B     2010-05-20
[ 371 ]  
 
Liaison statement to Working Party 4B on the PDRR ITU-R BO.789-2 (copy to Working Party 4A for information) - Proposed revisions to the working document towards a preliminary draft revision of Recommendation ITU-R BO.789-2 - Service requirements for digital sound broadcasting to vehicular portable and fixed receivers for broadcasting-satellite service (sound) in the frequency...     WP 6B   23/6   2010-05-20
[ 370 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5C, 6B, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of tuning ranges for use by terrestrial electronic news gathering     WP 6A     2010-05-04
[ 369 ]  
 
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.13 (copy to Working Parties 3M, 4B, 5A, 5C, 6A and 7D for information)     WP 6B     2010-05-04
[ 368 ]  
+Ann.1-18 
Report on the meeting of Working Party 4A (Bangalore, 24 March - 1 April 2010)     Chairman, WP 4A     2010-04-07
[ 367 ]  
 
List of documents issued     BR Study Group Department     2010-03-26
[ 366 ]  
 
Final list of participants (Working Party 4A, Bangalore, India, 24 March - 1 April 2010)     Director, BR     2010-03-26
[ 365 ]  
 
Liaison statement to Study Group 6 and Working Party 4A - Response to comments on the proposed treatment of Recommendations of former Working Party 6S     WP 4B     2010-03-25
[ 364 ]  
 
Liaison statement to Working Parties 4A, 5A and 7C - Information for studies related to WRC-12 Agenda item 1.25     WP 4C     2010-03-23
[ 363 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 4A for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems (WRC-12 Agenda item 1.5)     WP 4C     2010-03-23
[ 362 ]  
 
Report of activities of the Correspondence Group on the efficient use of the spectrum/orbit resource to Working Party 4A     Chairman, Corresp. Gp spectrum/orbit resource     2010-03-23
[ 361 ]  
 
Update of the proposed set of definitions for the basic principles ruling the orbit/spectrum utilization, and identification of associated variables - Stages 1 and 2 of the WP 4A draft workplan for implementing resolves 1 of Resolution 80 (Rev.WRC-07)     Colombia (Republic of)     2010-03-17
[ 360 ]  
 
Proposal for a draft revision of Annex 15 to Working Party 4A Chairman's Report - Working document towards draft CPM text on WRC-12 Agenda item 1.13     Sweden     2010-03-17
[ 359 ]  
 
Preliminary draft revision of Recommendation ITU-R BO.1776 - Reference power flux-density for the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3     Luxembourg   22-1/6, 21/6, 104/6   2010-03-17
[ 358 ]  
 
Compatibility studies between non-GSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11     Indonesia (Republic of)     2010-03-17
[ 357 ]  
 
Proposal for WRC-12 Agenda item 1.13 - Coordination arc between geostationary BSS networks in the frequency band 21.4-22 GHz     France     2010-03-17
[ 356 ]  
 
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13 on the topic of feederlink capacity     Telenor ASA     2010-03-17
[ 355 ]  
 
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13     Telenor ASA     2010-03-17
[ 354 ]  
 
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13     India (Republic of)     2010-03-17
[ 353 ]  
 
Protection requirements for inter-satellite service (ISS) systems and impact on other sharing services     Access Partnership Limited     2010-03-17
[ 352 ]  
 
Draft new Question - Inter-satellite service (ISS) links used in non-GSO satellite systems     Access Partnership Limited     2010-03-17
[ 351 ]  
 
Working document on further development of the analytical methodology to evaluate interference into NGSO-to-NGSO ISS from the emissions of SRS earth stations     Access Partnership Limited     2010-03-17
[ 350 ]  
 
Feeder link bands for the 21.4-22 GHz BSS band in Regions 1 and 3 (WRC-12 Agenda item 1.13)     Luxembourg     2010-03-17
[ 349 ]  
 
Preliminary draft revision of Recommendation ITU-R BO.1785 - Intra-sharing criteria for GSO BSS systems in the band 21.4-22.0 GHz in Regions 1 and 3     Luxembourg     2010-03-17
[ 348 ]  
 
Draft revision of Recommendation ITU-R BO.1659 - Mitigation techniques for rain attenuation for broadcasting-satellite service systems in frequency bands between 17.3 GHz and 42.5 GHz     Luxembourg   22-1/6, 21/6, 104/6   2010-03-17
[ 347 ]  
 
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13     Luxembourg     2010-03-17
[ 346 ]  
 
Balance the existing FSS spectrum allocations in ITU Region 2 and Region 3 in the 10-15 GHz band     Asia Satellite Telecommunications Co. Ltd.     2010-03-17
[ 345 ]  
 
Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz (WRC-12 Agenda item 1.20)     Asia Satellite Telecommunications Co. Ltd.     2010-03-17
[ 344 ]  
 
Addressing the insufficiency of FSS spectrum (in the Earth-to-space direction) for Regions 2 and 3 in the unplanned 10-15 GHz band     Malaysia     2010-03-16
[ 343 ]  
 
Preliminary views on WRC-12 Agenda item 7 relating to the "averaging bandwidth" issue     China (People's Republic of)     2010-03-16
[ 342 ]  
 
Compatibility of integrated MSS systems operating in the 1 525-1 559 (S-to-E) and 1 626.5-1 660.5 MHz (E-to-S) bands with other inband and adjacent band allocated services     United Arab Emirates     2010-03-17
[ 341 ]  
 
Protection requirements claimed for ISS systems and conditions for compatibility studies under WRC-12 Agenda item 1.11     Japan     2010-03-17
[ 340 ]  
 
Impact of protection requirement for HIBLEO systems in consideration of sharing with data relay satellite systems in the 22.55-23.55 GHz band     Japan     2010-03-17
[ 339 ]  
 
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13     Japan     2010-03-17
[ 338 ]  
 
Working document towards a preliminary draft new Recommendation - Reference receiving earth station antenna pattern for the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3     Japan   21/6, 104/6, 22-1/6   2010-03-17
[ 337 ]  
 
Working document towards a preliminary draft revision of Report ITU-R BO.2071 System parameters of BSS between 17.3 GHz and 42.5 GHz and associated feeder links     Japan   21/6, 104/6, 22-1/6   2010-03-17
[ 336 ]  
 
Draft revision of Recommendation ITU-R BO.1659 - Mitigation techniques for rain attenuation for broadcasting-satellite service systems in frequency bands between 17.3 GHz and 42.5 GHz     Japan   104/6, 22-1/6, 21/6   2010-03-17
[ 335 ]  
 
Preliminary draft revision of Recommendation ITU-R BO.1776 - Reference power flux-density for the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3     Japan   22-1/6, 21/6, 104/6   2010-03-17
Results:609 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-04-12