International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 85 ]  
 
Proposed changes to Recommendation G.977 for 40G and 100G systems     Ciena Canada   Q8/15   2013-06-13
[ 84 ]  
 
Proposal for Update to G.977 considering 40G and 100G Coherent Systems     Ciena Canada   Q8/15   2013-06-13
[ 83 ]  
 
How to handle unused PTP fields in BMCA/G.781 [G.8275.1]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 82 ]  
 
Noise Generation & Noise Transfer Text [G.8273.2]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 81 ]  
 
Adding Applicable Interfaces to PRTC [G.8272]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 80 ]  
 
Wander Generation Variable Temperature [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 79 ]  
 
Clarification of Holdover Requirements for PEC-S [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 78 ]  
 
Using G.781 for Time Profile [G.827x]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 77 ]  
 
Compliant & Non-Compliant Networks (Re-routes, Outage, Congestion) with FPP [G.8260, G.8261.1]     Microsemi Semiconductor Corporation   Q13/15   2013-06-13
[ 76 ]  
 
Proposal to change the approval process for G.8113.1 and G.8113.2 from TAP to AAP     Canada   Q10/15   2013-06-13
[ 75 ]  
 
Spectral excursion analysis for advanced modulation formats     Ciena Canada   Q6/15   2013-06-13
[ 74 ]  
 
Effective frequency slot characterisation     Ciena Canada   Q6/15, Q12/15   2013-06-13
[ 73 ]  
 
G.It: Discussion on accuracy of multi-component measurements     Microsemi Semiconductor Corporation   Q4/15   2013-06-13
[ 72 ]  
 
G.It: Request for revision of G.996.2 3-element capacitance measurement accuracies     Microsemi Semiconductor Corporation   Q4/15   2013-06-13
[ 71 ]  
 
G.8273.2 latest draft - editorial comments     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 70 ]  
 
G.8273 latest draft - editorial comments     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 69 ]  
 
G.8263 Holdover     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 68 ]  
(Rev.1-2) 
Proposal of SDN-based transport network standardization     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 67 ]  
(Rev.1-3) 
Proposal of research on NBI functionality of controller in SDN-based transport network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 66 ]  
(Rev.1-2) 
The research of the functions features of the transport network controller     China Unicom , FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 65 ]  
(Rev.1-2) 
Proposal of research on transport network resource virtualization or abstraction     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 64 ]  
(Rev.1-2) 
Proposal of research resource partitioning of SDN-based transport network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 63 ]  
(Rev.1-2) 
Proposal of research on coexistence and interworking between current transport network and SDN-based network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 62 ]  
(Rev.1-2) 
Proposal of research Secure Channel in SDN-based transport network     FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 61 ]  
(Rev.1-2) 
Proposal of research architecture for network management, controller and transport plane     China Unicom , FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 60 ]  
(Rev.1-3) 
Comments on CCCV mode in G.8121.2     FiberHome Technologies Group   Q10/15   2013-06-13
[ 59 ]  
 
G.8263 Wander Generation     Integrated Device Technology (IDT)   Q13/15   2013-06-13
[ 58 ]  
(Rev.1-3) 
Comments on Ring Protection Function in G.8052     FiberHome Technologies Group   Q14/15   2013-06-13
[ 57 ]  
 
Security in Optical Transport Networks     Altera Newfoundland Technology Centre (Altera NTC)   Q11/15   2013-06-13
[ 56 ]  
 
Getting a 'point to point modem proof' PON ranging process     Orange   Q2/15   2013-06-13
[ 55 ]  
 
PON-Id fuelled power saving capabilities     Orange   Q2/15   2013-06-13
[ 54 ]  
 
Detection of point to point modems on a PON     Orange   Q2/15   2013-06-13
[ 53 ]  
 
Necessity to Support External Commands in ODU SMP Protocol     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15   2013-06-13
[ 52 ]  
 
MPLS-TP shared ring protection(MSRP) implementation and test result     China Mobile Communications Corporation   Q9/15   2013-06-13
[ 51 ]  
 
PWE3 Dual-Homing Protection Requirements     China Mobile Communications Corporation   Q9/15   2013-06-13
[ 50 ]  
 
Proposal for PTP clockclasses     China Mobile Communications Corporation   Q13/15   2013-06-13
[ 49 ]  
 
Proposal for HRM hops and BC constant time error     China Mobile Communications Corporation   Q13/15   2013-06-13
[ 48 ]  
(Rev.1) 
Proposal to reserve Priority 1 in BMCA     China Mobile Communications Corporation   Q13/15   2013-06-13
[ 47 ]  
(Rev.1) 
ODU SMP with centralized control plane     China Mobile Communications Corporation   Q9/15   2013-06-13
[ 46 ]  
(Rev.1) 
Proposal for different correlation structures for SDN-based transport network controller and path computation element (PCE)     China Unicom   Q12/15   2013-06-13
[ 45 ]  
 
Optical transceiver performance for the new CWDM applications with multi sub-channel interface     Ericsson-LG , SK Telecom   Q6/15   2013-06-13
[ 44 ]  
(Rev.1) 
Proposal for revision of recommendation ITU-T L.60     FiberHome Technologies Group   Q16/15   2013-06-13
[ 43 ]  
 
Consideration for Interworking between Ethernet Linear Protection in G.MDSP     China Unicom   Q9/15   2013-06-13
[ 42 ]  
(Rev.1) 
Proposal to add related description of PMDQ in ITU-T Recommendation G.650.2(2007)     FiberHome Technologies Group , Ministry of Information and Industry of China   Q5/15   2013-06-13
[ 41 ]  
 
Definition of serial data interface comunication ME in G.988     FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q2/15   2013-06-13
[ 40 ]  
 
Comments and modifications to ODN reference architecture in G.multi     FiberHome Technologies Group   Q2/15   2013-06-13
[ 39 ]  
 
FEC NCG in G.Sup39     ZTE Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT)   Q6/15   2013-06-13
[ 38 ]  
 
The improvement of 8B10B line coding of CPRI in G.989.2 Annex A     FiberHome Technologies Group   Q2/15   2013-06-13
[ 37 ]  
 
The requirement of CPRI signal transmission over P2P WDM system in G.989.2 Annex A     FiberHome Technologies Group   Q2/15   2013-06-13
[ 36 ]  
 
Proposal for ONU Activation in dual rate NGPON2     FiberHome Technologies Group   Q2/15   2013-06-13
Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-09-28