International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 135 ]  
 
Raman OPP for PtP WDM     ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2013-06-16
[ 134 ]  
 
PMD values for PtP WDM     ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2013-06-16
[ 133 ]  
 
Eye mask parameters for PtP WDM     ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2013-06-16
[ 132 ]  
 
G.bond: Shutting down some lines in a bonded group     AT&T, Inc.   Q4/15   2013-06-15
[ 131 ]  
 
Full capacity in NG-PON2 using line coding     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 130 ]  
 
Proposal to study AWG based WDM PON proposal in mobile front-haul application     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 129 ]  
 
On the editorial placement of NG-PON2 (TWDM) TC-layer specifications     Alcatel-Lucent USA Inc. , Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 128 ]  
 
On the concept of out-of-band ranging in TWDM PONs     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 127 ]  
 
Impacts of line code change on G.989.2     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 126 ]  
 
Proposed approach for work on OTN beyond 100G     ZTE Corporation   Q6/15, Q14/15, Q12/15, Q11/15   2013-06-15
[ 125 ]  
 
Proposed model for the OTUCn and OCh layer for OTN beyond 100G     China Telecommunications Corporation , China Unicom , ZTE Corporation   Q6/15, Q14/15, Q12/15, Q11/15   2013-06-15
[ 124 ]  
 
G.8275.1: Title     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 123 ]  
 
G.8275.1: Default Parameter Values     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 122 ]  
 
G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 121 ]  
 
G.8263: Modification to Proposed Testing Appendix     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 120 ]  
 
G.8260: The Use of Exceptions for Network Limits using FPP     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 119 ]  
 
Percentile Average Clarification in G.8260     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 118 ]  
 
FPP and Percentile of Live Network PDV     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 117 ]  
 
G.poc draft proposal     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 116 ]  
 
Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft     ADVA Optical Networking , Futurewei Technologies US R&D Center , Gemfire Europe Limited   Q2/15   2013-06-15
[ 115 ]  
 
Multiple rate TC extension for TWDM     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 114 ]  
 
OFS Proposal for revisions to 657     OFS Fitel, LLC   Q5/15   2013-06-14
[ 113 ]  
 
OFS Proposal for revisions to 652.D     OFS Fitel, LLC   Q5/15   2013-06-14
[ 112 ]  
(Rev.1) 
OFS Proposal for a new G.654 Category     OFS Fitel, LLC   Q5/15   2013-06-14
[ 111 ]  
 
Criteria for evaluating ODU SMP protocol proposals     Tellabs Oy   Q9/15   2013-06-14
[ 110 ]  
 
OTN Sec : Security for OTN beyond 100 Gbit/s     Applied Micro Circuits Corporation (AMCC)   Q11/15   2013-06-14
[ 109 ]  
 
G.975.1 Appendix I.4 corrections     Applied Micro Circuits Corporation (AMCC)   Q8/15   2013-06-14
[ 108 ]  
 
G.fast: SOS-like Scheme as Fast OLR     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 107 ]  
 
G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 106 ]  
 
G.fast: Configuration of Gap Time Parameter Tg2     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 105 ]  
 
G.vdsl: Low Power Mode proposal and working text     TQ DELTA. LLC   Q4/15   2013-06-14
[ 104 ]  
(Rev.1) 
G.vector, G.hs: Potential Ghost Start Issue in G.vector     Ikanos Communications   Q4/15   2013-06-14
[ 103 ]  
 
Proposed Revisions to the Current G.mdsp Draft     Fujitsu Network Communications, Inc.   Q9/15   2013-06-14
[ 102 ]  
 
G.fast: Maximum aggregate transmit power     Deutsche Telekom AG , Swisscom SA   Q4/15   2013-06-14
[ 101 ]  
 
G.metro scope proposal     ADVA Optical Networking , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG , Italy , Nokia Siemens Networks GmbH & Co. KG , Telefon AB - LM Ericsson   Q6/15   2013-06-14
[ 100 ]  
 
G.hn: Backup security controller mechanism     Huawei Technologies Co. Ltd.   Q18/15   2013-06-14
[ 99 ]  
 
G.hn: Improving the existing domain merging procedure     Huawei Technologies Co. Ltd.   Q18/15   2013-06-14
[ 98 ]  
 
Considerations on flexible ODU and OTU overhead [SP7]     Fujitsu Limited   Q11/15   2013-06-14
[ 97 ]  
 
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5]     Fujitsu Limited   Q11/15   2013-06-14
[ 96 ]  
 
Considerations on B100G OTN multiplexing hierarchy [SP23]     Fujitsu Limited   Q11/15   2013-06-14
[ 95 ]  
(Rev.1) 
Consideration on B100G OTN multiplexing     Fujitsu Limited   Q11/15   2013-06-14
[ 94 ]  
 
Comments and proposal on the restructuring of G.652 & G.657 categories     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q5/15   2013-06-14
[ 93 ]  
 
Consideration on 400GE signal transmission over B100G OTN     Fujitsu Limited   Q11/15   2013-06-14
[ 92 ]  
 
Proposal for starting the procedure of the new Recommendation about micro-ducts technology and its application in the access network.     Italy   Q16/15   2013-06-14
[ 91 ]  
 
Beginning Of Life ("BOL") versus End-Of-Life ("EOL") approach in the specification of passive optical components.     Italy   Q7/15, Q2/15, Q16/15   2013-06-14
[ 90 ]  
 
Application scenarios for low-cost DWDM metro systems     Italy   Q6/15   2013-06-14
[ 89 ]  
 
Requirements for low-cost DWDM metro systems     Italy   Q6/15   2013-06-14
[ 88 ]  
 
Proposal about compatibility issues for the revision of G.65x Recommendations on optical fibres     Italy   Q5/15   2013-06-14
[ 87 ]  
 
Operational examples of 2-stage ODU SMP APS protocol     Tellabs Oy   Q9/15   2013-06-13
[ 86 ]  
 
Resource availability notifications in ODU shared mesh protection     Tellabs Oy   Q9/15   2013-06-13
Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-09-28