International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Transport, access and home

Study Period 2017

Results:2858 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 808 ]  
 
Proposing HRM for fronthaul deployments with TAE = 260ns [G.8271.1]     Nokia Corporation , Nokia Corporation (Finland)   Q13/15   2018-09-20
[ 807 ]  
 
Draft new Recommendation ITU-T L.cci "Criteria for optical cable installation with minimal existing infrastructure"     Ministry of Communications (India)   Q16/15   2018-09-20
[ 806 ]  
 
Proposal to include new Appendix II to the Draft new Rec. L.fdb "Requirements for Passive Optical Nodes: Fibre Distribution Box" (latest draft April 2018)     Ministry of Communications (India)   Q16/15   2018-09-20
[ 805 ]  
 
Document withdrawn     N/A     2018-09-20
[ 804 ]  
 
Document withdrawn     N/A     2018-09-20
[ 803 ]  
 
SPN SCL OAM Overall Considerations     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 802 ]  
 
Possible 6466b Ordered set for SPN SCL Channel OAM&P     Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 801 ]  
 
SPN SCL Channel Use Case     Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 800 ]  
 
A Possible Implementation Details of SPN SCL     Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 799 ]  
 
SPN SCL Channel vs traditional per packet forwarding latency and PDV comparison     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 798 ]  
 
Possible Signal Format for SPN SCL     Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 797 ]  
 
The Relationship between SPN Slicing Channel Layer (SCL) and Its Adjacent Layers     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 796 ]  
 
Additional OAM Requirements for g.ctn5g     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 795 ]  
 
Text proposal for section 9 in G.ctn5g     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2018-09-20
[ 794 ]  
 
 
Document withdrawn
 
N/A     2018-09-20
[ 793 ]  
(Rev.1) 
OAM requirements to support 5G transport network     China Telecommunications Corporation , FiberHome Technologies Group (China)   Q11/15   2018-09-20
[ 792 ]  
 
This contribution describes the CBTXOP MAC scheme in using at smart grid network.     Integration Silicon Solution Israel ISSI   Q18/15   2018-09-20
[ 791 ]  
 
G.hn BPL - PLC authentication     Integration Silicon Solution Israel ISSI   Q18/15   2018-09-20
[ 790 ]  
 
A practical method of wander transfer measurement on cascaded media-converter equipment acting as synchronous equipment clocks     Ciena Canada   Q13/15   2018-09-19
[ 789 ]  
 
Fronthaul synchronization requirements in G.8271.1     Telefon AB - LM Ericsson (Sweden)   Q13/15   2018-09-19
[ 788 ]  
 
5G synchronization requirements in G.8271     Telefon AB - LM Ericsson (Sweden)   Q2/15, Q13/15, Q11/15   2018-09-19
[ 787 ]  
 
Message rate in G.8275.1     Telefon AB - LM Ericsson (Sweden)   Q13/15   2018-09-19
[ 786 ]  
 
PTP Security in G.8275.1 and G.8275.2     Telefon AB - LM Ericsson (Sweden)   Q13/15   2018-09-19
[ 785 ]  
 
Management and control of network slicing     Ciena Canada   Q14/15, Q12/15   2018-09-19
[ 784 ]  
 
Recommendation Relationships     Ciena Canada , FiberHome Technologies Group (China)   Q14/15, Q12/15   2018-09-19
[ 783 ]  
 
Baud rate and modulation considerations for FlexO 200G and above     Ciena Canada   Q6/15, Q11/15   2018-09-19
[ 782 ]  
 
Feasibility of using the DP-16QAM modulation format for 400G metro applications     Ciena Canada   Q6/15, Q11/15   2018-09-19
[ 781 ]  
 
Spectral excursion measurements using the DP-16QAM and DP-8QAM modulation formats     Ciena Canada   Q6/15   2018-09-19
[ 780 ]  
 
EVMrms measurements using the 16QAM modulation format     Ciena Canada   Q6/15   2018-09-19
[ 779 ]  
(Rev.1) 
Proposal to include a new Appendix I to the Draft New Recommendation ITU-T L.oha "Optical fibre cables for in-home applications" (Latest draft)     Ministry of Communications (India)   Q16/15   2018-09-19
[ 778 ]  
 
M-OTN requirements and standardization considerations     China Telecommunications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Microsemi Corporation (United States) , ZTE Corporation (China)   Q6/15, Q11/15   2018-09-19
[ 777 ]  
 
New work item proposal for application of OTN to 5G transport     China Telecommunications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , KDDI Corporation (Japan) , Microsemi Corporation (United States) , Ministry of Industry and Information Technology (MIIT) (China) , SM Optics s.r.l. (Italy) , Viavi Solutions Deutschland GmbH (Germany) , ZTE Corporation (China)   Q11/15   2018-09-19
[ 776 ]  
(Rev.1) 
G.mgfast: P2MP FDMA Dynamics     British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)   Q4/15   2018-09-18
[ 775 ]  
 
G.mgfast initialisation goals and methods     British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)   Q4/15   2018-09-18
[ 774 ]  
 
G.fast: Comments on the Technical Paper on NT software upgrade for one image     Nokia Corporation (Finland)   Q4/15   2018-09-18
[ 773 ]  
(Rev.1-3) 
Enhance the Draft Rec. L.cci: Criteria for optical cable installation with minimal existing infrastructure     Rwanda Utilities Regulatory Authority (RURA)   Q16/15   2018-09-18
[ 772 ]  
 
Enhance the Draft Rec. L.cci: Criteria for optical cable installation with minimal existing infrastructure  
Duplicate of C773
 
Rwanda Utilities Regulatory Authority (RURA)   Q16/15   2018-09-18
[ 771 ]  
(Rev.1) 
OAM functions for 5G wireless fronthaul     Futurewei Technologies US R&D Center (United States) , ZTE Corporation (China)   Q2/15   2018-09-17
[ 770 ]  
 
G.8273.2: Test patterns for T-BC and T-TSC noise tolerance     Calnex Solutions Limited (United Kingdom)   Q13/15   2018-09-14
[ 769 ]  
 
G.8273.2: Max|TE| value for Class C and Class D clocks     Calnex Solutions Limited (United Kingdom)   Q13/15   2018-09-13
[ 768 ]  
 
G.8273.2: Noise Floor on Noise Transfer Measurements     Calnex Solutions Limited (United Kingdom)   Q13/15   2018-09-13
[ 767 ]  
 
G.8271.2 Editor's Notes     Calnex Solutions Limited (United Kingdom)   Q13/15   2018-09-13
[ 766 ]  
 
G.8272 Appendix I: Number of satellites     Calnex Solutions Limited (United Kingdom)   Q13/15   2018-09-13
[ 765 ]  
 
G.8272 Clause 6.1: Sample processing     Calnex Solutions Limited (United Kingdom)   Q13/15   2018-09-13
[ 764 ]  
 
G.8260 Editor's Note     Calnex Solutions Limited (United Kingdom) , Microsemi Corporation (United States)   Q13/15   2018-09-13
[ 763 ]  
 
Identify class for requirements in G.7718     FiberHome Technologies Group (China)   Q14/15   2018-09-13
[ 762 ]  
 
Update to G.7718 for accepted and new requirements.     FiberHome Technologies Group (China)   Q14/15   2018-09-13
[ 761 ]  
 
Liminality of the modulation/demodulation function in G.media     Ciena Canada   Q6/15, Q14/15, Q12/15, Q11/15   2018-09-12
[ 760 ]  
 
Signal with multiple information streams     Ciena Canada   Q6/15, Q14/15, Q12/15   2018-09-12
[ 759 ]  
 
Description of signals in G.media     Ciena Canada , ZTE Corporation (China)   Q6/15, Q14/15, Q12/15, Q11/15   2018-09-12
Results:2858 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2022-01-20