Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1014 ]
|
Technical comments and proposed text updates on ITU-T G.709.1 Ed 4.0 draft
|
ADTRAN Holdings Inc. (United States)
,
China Information Communication Technologies Group
|
Q11/15
|
2026-06-15 |
|
[ 1013 ]
|
Efficient aggregation and transport of Sub-100G ODU clients over FlexOLy Path via sub-rated ODUCn multiplexing structure
|
Algérie Télécom SPA (Algeria)
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
|
Q11/15
|
2026-06-15 |
|
[ 1012 ]
|
Considerations and proposal on Sub-100G ODUk clients transport
|
China Information Communication Technologies Group
,
China Unicom
|
Q11/15
|
2026-06-15 |
|
[ 1011 ]
|
Draft text for ultra-long PRTC time holdover in GSTR-OCN
|
NTT, Inc. (Japan)
|
Q13/15
|
2026-06-15 |
|
[ 1010 ]
(Rev.1) |
Considerations on requirements and architecture for the draft Technical Report GSTR.ION-aiDC
|
Centre Tecnològic de Telecomunicacions de Catalunya (CTTC) (Spain)
,
China Telecommunications Corporation
|
Q6/15
|
2026-06-15 |
|
[ 1009 ]
(Rev.1) |
Text Proposal for Restructuring Phase 2 of ITU-T G.798.2
|
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-15 |
|
[ 1008 ]
|
FlexOLy to ODUCn adaptation function
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-15 |
|
[ 1007 ]
|
ODUC crunching for mapping into FlexOP
|
ZTE Corporation (China)
|
Q11/15
|
2026-06-15 |
|
[ 1006 ]
|
G.709.1 Enhancements on ODUCn client mapping
|
ZTE Corporation (China)
|
Q11/15
|
2026-06-15 |
|
[ 1005 ]
|
Discussion on FlexOP FAS and Frame Alignment
|
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-15 |
|
[ 1004 ]
|
Proposed new work item on G.sup51 revision-"Passive optical network protection considerations"
|
AT&T, Inc. (United States)
,
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
FIBERCOP S.P.A. (Italy)
,
Futurewei Technologies Inc. (United States)
,
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
,
Orange (France)
,
ZTE Corporation (China)
|
Q2/15
|
2026-06-15 |
|
[ 1003 ]
|
Proposed text to fix open issues in Section 8.1.2.8 and 8.3.3
|
AT&T, Inc. (United States)
,
China Telecommunications Corporation
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2026-06-15 |
|
[ 1002 ]
|
Proposed new work item on G.9805 amendment - Coexistence of passive optical network systems
|
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2026-06-15 |
|
[ 1001 ]
|
Proposal to new ITU-T Supplement G.sup.PONcoop "PON cooperation based on combo OLT and combo ONU"
|
AT&T, Inc. (United States)
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
Futurewei Technologies Inc. (United States)
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2026-06-15 |
|
[ 1000 ]
|
Architecture of FIP management and control interfaces in G.OMCC4FIP
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2026-06-15 |
|
[ 999 ]
|
Considerations on the FlexOLy over FlexOneM functional model
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 998 ]
|
G.798.b1t: B1T functional model
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 997 ]
|
G.798.b1t: outline for B1T equipment functions
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 996 ]
|
G.798.3: align Appendix I with media model
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 995 ]
|
G.798.3: align Annex A (CBRx/OSx) with media model
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 994 ]
|
G.798.x: managed versus unmanaged interfaces
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 993 ]
|
Work items for B1T equipment functions and G.798.x restructuring phase 2
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 992 ]
(Rev.1) |
G.798.4: merge Annex B (FlexO) into clauses 6 & 8
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 991 ]
(Rev.1) |
G.798.4: split "legacy" FlexO model into separate layers
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 990 ]
(Rev.1) |
G.798.4: comments against Ed.1.0
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 989 ]
(Rev.1) |
Enhanced QL values in G.8265.1
|
Ciena Canada
|
Q13/15
|
2026-06-15 |
|
[ 988 ]
|
G.798.3: comments against Ed.1.0
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q11/15
|
2026-06-15 |
|
[ 987 ]
(Rev.1) |
G.798.2: comments against Ed.1.0
|
Huawei Technologies Düsseldorf GmbH (Germany)
,
ZTE Corporation (China)
|
Q11/15
|
2026-06-15 |
|
[ 986 ]
|
Requirements for the mechanism on transport network capabilities invocation by NMAs
|
China Mobile Communications Co. Ltd.
|
Q14/15, Q12/15
|
2026-06-15 |
|
[ 985 ]
(Rev.1) |
Data sets related to wait-to-restore in G.8265.1
|
Ciena Canada
|
Q13/15
|
2026-06-15 |
|
[ 984 ]
|
Clarification on NMA's "orchestration capability" and addition of the capability of network capabilities invocation to be ones owned by NMAs
|
China Mobile Communications Co. Ltd.
|
Q14/15, Q12/15
|
2026-06-15 |
|
[ 983 ]
|
Proposed new work item on G.698.6 revision - "Multichannel WDM applications with single-channel optical interfaces in the O-band"
|
China Academy of Information and Communications Technology (CAICT)
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2026-06-15 |
|
[ 982 ]
(Rev.1) |
Signal Fail data set in G.8265.1
|
Ciena Canada
|
Q13/15
|
2026-06-15 |
|
[ 981 ]
(Rev.1) |
Time error requirements In-band Network Telemetry (INT/IOAM) Deployments in Data Centres
|
Ciena Canada
|
Q13/15
|
2026-06-15 |
|
[ 980 ]
|
Duplicate of C981
|
N/A
|
|
2026-06-15 |
|
[ 979 ]
|
Simulation analysis on MPI penalty of the O-band 50G CWDM system
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2026-06-15 |
|
[ 978 ]
|
Alternate BTCA using the enhanced accuracy metrics TLV info
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2026-06-15 |
|
[ 977 ]
|
Revision Proposal for ITU-T G.Sup59 "Guidance on Optical Fibre and Cable Reliability"
|
Beijing University of Posts and Telecommunications (China)
,
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2026-06-15 |
|
[ 976 ]
(Rev.1) |
Timing asymmetry compensation with Coherent optical pluggable in data centres
|
Ciena Canada
|
Q13/15
|
2026-06-15 |
|
[ 975 ]
|
Proposed draft of clause 7.3, 7.4 and 8 to L.ocwp.2
|
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2026-06-15 |
|
[ 974 ]
|
Chromatic dispersion test results of the O-band 50G CWDM
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2026-06-15 |
|
[ 973 ]
|
Proposal for defining B1T application scenarios and key parameters
|
China Telecommunications Corporation
|
Q6/15
|
2026-06-15 |
|
[ 972 ]
(Rev.1) |
Deployment considerations for Coherent pluggable with asymmetry compensation
|
Ciena Canada
|
Q13/15
|
2026-06-15 |
|
[ 971 ]
|
Duplicate of C972
|
N/A
|
|
2026-06-15 |
|
[ 970 ]
|
Proposed draft for clause 8 of L.nis
|
Centre d'Etudes et de Recherches des Télécommunications (CERT) (Tunisia)
,
China Academy of Information and Communications Technology (CAICT)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q7/15
|
2026-06-15 |
|
[ 969 ]
|
Proposal for revision of Recommendation ITU-T L.203 "Electric power supply for equipment installed as outside plant"
|
China Academy of Information and Communications Technology (CAICT)
,
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q7/15
|
2026-06-15 |
|
[ 968 ]
|
Consideration about WD13-11 under the Study Point 6 of G.Sup.65 living list
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-15 |
|
[ 967 ]
|
Consideration about the Study Point 2 of G.Sup.65 living list
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-15 |
|
[ 966 ]
|
Follow-up discussion on the system architecture document of G.fin & G.Xfin
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q3/15
|
2026-06-15 |
|
[ 965 ]
|
G.sup.65 restructure
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2026-06-15 |
Resultats:1211 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):