Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1596 ]
|
Further updates preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26GHz] - Guidelines to assist administrations to mitigate interference from FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz and 27-27.5 GHz
|
IAFI
|
|
2023-01-23 |
|
[ 1595 ]
|
Update of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] (Section 4.2)
|
Soonchunhyang University
,
KT Corporation
|
|
2023-01-23 |
|
[ 1594 ]
|
Update of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] (Section 2.2)
|
Soonchunhyang University
,
KT Corporation
|
|
2023-01-23 |
|
[ 1593 ]
|
Update of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] (Sections 1 & 2.1)
|
Soonchunhyang University
,
KT Corporation
|
|
2023-01-23 |
|
[ 1592 ]
|
Response to liaison statement on the "Revision after year 2021" of Recommendation ITU-R M.2150
|
European Telecommunications Standards Institute
|
|
2023-01-20 |
|
[ 1591 ]
|
Summary of results of sharing and compatibility studies for WRC-23 agenda item 1.4
|
United States of America
|
AI1.4
|
2023-01-20 |
|
[ 1590 ]
|
Text proposal for working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100GHz]
|
Beijing University of Posts and Telecommunications
,
Spark NZ Limited
|
|
2023-01-19 |
|
[ 1589 ]
|
Updated material on LTE-advanced toward revision 6 of Recommendation ITU-R M.2012
|
Alliance for Telecommunications Industry Solutions
|
|
2023-01-18 |
|
[ 1588 ]
|
Updated material on "3GPP 5G-SRIT" for updating Recommendation ITU-R M.2150 to Revision 2
|
Alliance for Telecommunications Industry Solutions
|
|
2023-01-18 |
|
[ 1587 ]
|
Updated material on "3GPP 5G-RIT" for updating Recommendation ITU-R M.2150 to Revision 2
|
Alliance for Telecommunications Industry Solutions
|
|
2023-01-18 |
|
[ 1586 ]
|
Draft note to the Director of the Radiocommunication Bureau
|
Egypt (Arab Republic of)
,
Korea (Republic of)
,
Nigeria (Federal Republic of)
,
South Africa (Republic of)
,
United Arab Emirates
,
United States of America
,
Zimbabwe (Republic of)
|
|
2023-01-19 |
|
[ 1585 ]
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R M.[HIBS-CHARACTERISTICS]
|
United States of America
|
AI1.4
|
2023-01-18 |
|
[ 1584 ]
|
Proposed revisions to sharing and compatibility studies of high-altitude platform stations as IMT base stations (HIBS) in the 1 710-1 885 MHz frequency range
|
United States of America
|
AI1.4
|
2023-01-18 |
|
[ 1583 ]
|
Update to Attachment 3 of the "Working document for sharing and compatibility studies of IMT systems in the frequency band 10-10.5 GHz in Region 2" - Sharing and compatibility of EESS (passive) operating in the band 10.6-10.7 GHz and IMT operating in the frequency band 10-10.5 GHz
|
United States of America
|
|
2023-01-18 |
|
[ 1582 ]
|
Recommendation on guidelines to assist administrations to mitigate interference from FSS earth stations into IMT stations
|
United States of America
|
|
2023-01-18 |
|
[ 1581 ]
|
Completion of the draft revision of Recommendation ITU-R M.1036-6
|
Canada
|
Q229/5
|
2023-01-18 |
|
[ 1580 ]
|
Proposals on working document towards a preliminary draft new Report ITU-R M.[IMT.APPLICATIONS]
|
Korea (Republic of)
|
|
2023-01-18 |
|
[ 1579 ]
|
Proposal to update the working document towards a preliminary draft new Report ITU-R [IMT.ABOVE 100 GHZ]
|
Korea (Republic of)
|
|
2023-01-18 |
|
[ 1578 ]
|
Proposal for update to a working document towards preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]
|
Korea (Republic of)
|
|
2023-01-18 |
|
[ 1577 ]
|
Update on activities in Region 2
|
Region 2 Rapporteur
|
|
2023-01-18 |
|
[ 1576 ]
|
Liaison statement on new work item Q.NCRP "Network coding protocol for network repeaters"
|
ITU-T SG 11
|
|
2023-01-12 |
|
[ 1575 ]
|
Liaison statement on new ITU-T Focus Group on Metaverse (FG-MV)
|
ITU-T TSAG
|
|
2023-01-11 |
|
[ 1574 ]
|
Outcome of the Correspondence Group (CG) on Vision Usage Scenarios
|
Convenor of CG on Vision Usage Scenarios
|
|
2023-01-10 |
|
[ 1573 ]
|
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-T Study Groups 3, 5, 13, 16, 17 and 20 and ITU-R Working Parties 5A and 5D on Enabling technologies for e-services and applications, including e-health and e-education
|
ITU-D SG 2
|
|
2022-12-22 |
|
[ 1572 ]
|
Liaison statement from ITU-D Study Group 2 Question 4/2 to ITU-T Study Group 11, ITU-T FG TBFXG and ITU-R Working Party 5D on Telecommunication /ICT equipment
|
ITU-D SG 2
|
|
2022-12-21 |
|
[ 1571 ]
|
Liaison statement from ITU-D Study Group 2 Question 1/2 to ITU-T Study Groups 3, 5, 12, 13, 15, 16, 17, 20 FG-AI4A, ITU-R Study Groups 3, 4, 6, ITU-R Working Parties 1B, 5A, 5C, and 5D on new Question 1/2 and collaboration
|
ITU-D SG 2
|
|
2022-12-20 |
|
[ 1570 ]
|
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-R Working Parties 5A and 5D on disaster risk reduction and management
|
ITU-D SG 1
|
|
2022-12-20 |
|
[ 1569 ]
|
Liaison statement from ITU-D Study Group 1 Question 5/1 to ITU-R Working Party 5D on terrestrial IMT for remote sparsely populated areas providing high data rate coverage
|
ITU-D SG 1
|
|
2022-12-20 |
|
[ 1568 ]
|
Liaison statement from ITU-D Study Group 1 Question 1/1 to ITU-R Working Party 5D on a new Report Terrestrial IMT for remote sparsely populated areas providing high data rate coverage
|
ITU-D SG 1
|
|
2022-12-20 |
|
[ 1567 ]
|
Reply liaison statement to Working Party 5D - WRC-23 agenda item 1.1
|
WP 5B
|
AI1.1
|
2022-12-09 |
|
[ 1566 ]
|
Liaison statement on invitation to update the information in the IMT-2020 and beyond roadmap [to ITU Study Groups and External IMT-2020 liaison partners]
|
Chairman, JCA-IMT-2020
|
|
2022-12-05 |
|
[ 1565 ]
(Rev.1) |
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5D, 6A, 7B, and 7D for information) - Future development of P-series recommendations to address frequencies above 100 GHz
|
WP 5C
|
|
2022-12-01 |
|
[ 1564 ]
|
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol THF
|
WP 5C
|
|
2022-11-30 |
|
[ 1563 ]
|
Reply liaison statement to Working Party 5A (copy to Working Parties 5D and 6A) - Resolution ITU-R 59-2
|
WP 5C
|
|
2022-11-30 |
|
[ 1562 ]
|
Reply liaison statement to Working Party 5C (copy to Working Party 5D and ITU-T Study Group 15 for information) - Working document towards a preliminary draft new Report ITU-R M.[UTILITIES] on Utility Radiocommunication Systems Operating in the Land Mobile Service
|
WP 5A
|
|
2022-11-28 |
|
[ 1561 ]
|
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
|
WP 5A
|
|
2022-11-28 |
|
[ 1560 ]
|
Liaison statement to Working Parties 5C, 5D and 6A regarding a definition of PMSE
|
WP 5A
|
|
2022-11-25 |
|
[ 1559 ]
|
Revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Terametric waves
|
ATDI
|
Q228/3
|
2022-11-21 |
|
[ 1558 ]
|
Liaison statement on collaboration matters related to EMF
|
ITU-T SG 5
|
|
2022-11-10 |
|
[ 1557 ]
|
Reply liaison statement on invitation to update the information in the IMT-2020 roadmap
|
ITU-T SG 5
|
|
2022-11-09 |
|
[ 1556 ]
|
Liaison statement on invitation to provide inputs to the roadmap of AI and IoT activities for digital agriculture
|
FG-AI4A
|
|
2022-10-25 |
|
[ 1555 ]
+Ch.1-7 |
Report on the 42nd meeting of Working Party 5D (Geneva, 10-21 October 2022)
|
Chairman, WP 5D
|
|
2022-10-18 |
|
[ 1554 ]
|
Final list of participants - Working Party 5D (Geneva, 10-21 October 2022)
|
Director, BR
|
|
2022-10-18 |
|
[ 1553 ]
|
Liaison statement on proposed draft new Recommendation ITU-T Y.FMSC-ABC-REQ: "Fixed, mobile and satellite convergence - Requirements of supporting airborne broadband communication in IMT-2020 networks and beyond"
|
ITU-T SG 13
|
|
2022-10-14 |
|
[ 1552 ]
|
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan
|
ITU-T SG 15
|
|
2022-10-14 |
|
[ 1551 ]
|
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan
|
ITU-T SG 15
|
|
2022-10-14 |
|
[ 1550 ]
|
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 5 and 6) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
|
SG 7
|
|
2022-10-10 |
|
[ 1549 ]
|
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Future development of P-series Recommendations to address frequencies above 100 GHz
|
WP 7C
|
|
2022-10-07 |
|
[ 1548 ]
|
Liaison statement to Working Party 5D - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
|
WP 4A
|
|
2022-10-06 |
|
[ 1547 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D, 7C) - Beam Wireless Power Transmission (WPT)
|
WP 7D
|
|
2022-10-06 |
Resultats:1796 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):