Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : SG01 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R SG01  C 

UIT-R SG01

Gestión del Espectro

Resultados :233 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 33 ]  
 
List of documents issued (Documents 1/1 - 1/33)     BR Study Groups Department     2016-06-09
[ 32 ]  
 
Executive Report of the meeting of Working Party 1B (Geneva, 2-9 June 2016)     Acting Chairman, WP 1B     2016-06-09
[ 31 ]  
 
Executive Report of the meeting of Working Party 1A (Geneva, 2-9 June 2016)     Acting Chairman, WP 1A     2016-06-09
[ 30 ]  
(Rev.1) 
Draft editorial modification to Report ITU-R SM.2153-5 - Technical and operating parameters and spectrum requirements for short-range devices     WP 1B     2016-06-09
[ 29 ]  
 
Executive Report to Study Group 1     Chairman, WP 1C     2016-06-09
[ 28 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site accuracy measurements of a fixed DF system     WP 1C     2016-06-08
[ 27 ]  
 
Draft liaison statement from Study Group 1 to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO: fundamental safety principles for protection against non-ionizing radiation     WP 1B     2016-06-08
[ 26 ]  
(Rev.1) 
Report ITU-R SM.2351-0 - Smart grid utility management systems     WP 1A     2016-06-08
[ 25 ]  
(Rev.1) 
Draft new Report ITU-R SM.[WPT-BEAM-APPLICATIONS] - Applications of wireless power transmission via radio frequency beam - Report ITU-R SM.2392-0     WP 1A   210-3/1   2016-06-08
[ 24 ]  
(Rev.1) 
Draft editorial modifications of Recommendation ITU-R SM.326-7, Recommendation ITU-R SM.328-11, Recommendation ITU-R SM.1446, Recommendation ITU-R SM.1879-2 and Report ITU-R SM.2158-3     WP 1A     2016-06-08
[ 23 ]  
(Rev.1) 
Draft modification of Report ITU-R SM.2256-0 - Spectrum occupancy measurements and evaluation     WP 1C     2016-06-08
[ 22 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[INDOOR RADIO ENVIRONMENT] - Methods for measurements of indoor radio environment     WP 1C     2016-06-08
[ 21 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[DF_SENSITIVITY] - Test procedure for measuring direction finder sensitivity in the VHF/UHF frequency range     WP 1C     2016-06-08
[ 20 ]  
(Rev.1) 
Draft new Question ITU-R [EMF MEASUREMENTS]/1 - Electromagnetic field measurements to assess human exposure     WP 1C     2016-06-08
[ 19 ]  
(Rev.1) 
Draft new Report ITU-R SM.[WIND_FARMS] - Investigating the effects of wind turbines on fixed radio direction finders - Report ITU-R SM.2391-0     WP 1C     2016-06-08
[ 18 ]  
(Rev.1) 
Draft revision of Report ITU-R SM.2012-4 - Economic aspects of spectrum management     WP 1B     2016-06-08
[ 17 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Groups 1, 5, 6 and their relevant Working Parties on ongoing collaboration     ITU-D SG 2     2016-06-06
[ 16 ]  
 
Report on CISPR activities June 2015 to May 2016     Rapporteur, SG 1 RG on Liaison with CISPR     2016-06-01
[ 15 ]  
 
Liaison statement to ITU-R Study Groups 1 and 6 - Terminology relating to the transition from analogue to digital radio technologies     CCV and SCV     2016-05-31
[ 14 ]  
 
RF human exposure - WHO: Fundamental safety principles for protection against non-ionizing radiation     ATDI     2016-05-26
[ 13 ]  
 
Attendance Report of CISPR meeting     Liaison Rapporteur with CISPR on WPT     2016-05-12
[ 12 ]  
 
Liaison statement on the progress of ongoing work on WTDC Resolution 9 (Rev.Dubai, 2014) during the ITU-D study period 2014-2017     ITU-R/ITU-D JG on WTDC Res.9     2016-04-25
[ 11 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2016-04-01
[ 10 ]  
 
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) - Standards overview and workplans     ITU-T SG 15     2016-03-08
[ 9 ]  
 
Liaison statement on the latest versions of the Home Network Transport (HNT) - Standards overview and workplan     ITU-T SG 15     2016-03-08
[ 8 ]  
 
Liaison statement on the latest versions of the Access Network Transport (ANT) - Standards overview and workplan     ITU-T SG 15     2016-03-08
[ 7 ]  
 
Terminology in the field transition from analogue to digital radio technology     Russian Federation     2016-02-26
[ 6 ]  
 
Liaison statement on ITU inter-Sector coordination [to ISCT, TDAG, ITU-D SGs, RAG, ITU-R SGs, ITU-T SGs]     ITU-T TSAG     2016-02-09
[ 5 ]  
 
Liaison statement on new ITU-T SG 20     ITU-T SG 20     2015-12-15
[ 4 ]  
 
Liaison statement on comments to the ICNIRP documents     ITU-T SG 5     2015-12-15
[ 3 ]  
 
Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria", Chapter 2: "Sources, measurements and exposures" and Chapter 3: "Radiofrequency Electromagnetic Fields Inside The Body"     ITU-T SG 5     2015-12-15
[ 2 ]  
 
Documents to be carried over from the 2012-2015 study period     SG 1     2015-12-11
[ 1 ]  
(Rev.4) 
Assignment of texts to the Study Group 1 Sub-Groups     Chairman, SG 1     2015-11-26
Resultados :233 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2019-10-23