International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2025-10-13 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2025-10-13) 

ITU-T SG15

Transport, access and home

Study Period 2025

Meeting  from 2025-10-13 to 2025-10-24

held in Switzerland [Geneva]

Other Meetings : 2025-03-17 

Results:372 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 563 ]  
 
Proposal for STM-4 GMP mapping into fgMTN for inclusion in Rec G.8312     China Information Communication Technologies Group , Huawei Technologies Co., Ltd. (China)   Q11/15   2025-09-29
[ 562 ]  
 
Proposal on the hybrid call and connection creation in G.7713 Amd.1     China Information Communication Technologies Group   Q14/15   2025-09-29
[ 561 ]  
 
Proposal on the fgMTN network level requirements in G.8350 Amd.2     China Information Communication Technologies Group   Q14/15   2025-09-29
[ 560 ]  
 
Operator's View on ePTS     Türk Telekom A.S. (Türkiye)   Q13/15   2025-09-29
[ 559 ]  
 
Working text for G.9942 Corrigendum 1     ZTE Corporation (China)   Q3/15   2025-09-29
[ 558 ]  
 
Proposed text of G.Xfin DLL F-PLOAM message definitions     China Telecommunications Corporation , ZTE Corporation (China)   Q3/15   2025-09-29
[ 557 ]  
 
Appendix III updates [G.8273]  
To be verified by TSB
 
Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 556 ]  
(Rev.1) 
Proposed text for security concept of G.Xfin-DLL     ZTE Corporation (China)   Q3/15   2025-09-29
[ 555 ]  
 
Holdover-within-specification [G.8275.2]  
To be verified by TSB
 
Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 554 ]  
 
Proposal of wavelength division coexistence for G.sup.coexFIN     China Telecommunications Corporation , China Unicom , ZTE Corporation (China)   Q3/15   2025-09-29
[ 553 ]  
 
Considerations on Acquiring mode  
To be verified by TSB
 
Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 552 ]  
 
Proposal of time division coexistence for G.sup.coexFIN     China Unicom , ZTE Corporation (China)   Q3/15   2025-09-29
[ 551 ]  
(Rev.1) 
Appendix VIII to refer to G.781.1 [G.8275]     Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 550 ]  
 
timers reconfiguration [G.8275/.1/.2]  
To be verified by TSB
 
Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 549 ]  
 
OffsetScaledLogVariance update [G.8275/.1/.2]  
To be verified by TSB
 
Huawei Technologies Co., Ltd. (China) , Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 548 ]  
 
Datasets for Sync Service Availability performance metrics  
To be verified by TSB
 
Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 547 ]  
 
Proposal of Rb parameters for G.Xfin-PHY     ZTE Corporation (China)   Q3/15   2025-09-29
[ 546 ]  
 
Intelligent FIP maintenance use case for G.sup.ISAC4FIP     China Mobile Communications Co. Ltd. , China Unicom , ZTE Corporation (China)   Q3/15   2025-09-29
[ 545 ]  
 
Renaming acronyms for Availability metrics  
To be verified by TSB
 
Huawei Technologies Co., Ltd. (China) , Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 544 ]  
 
KEK text clarification in G.9804.2 and G.988     ZTE Corporation (China)   Q2/15   2025-09-29
[ 543 ]  
 
G.sup.VHSP proposed text for clause 8.2.4 and 8.2.5     ZTE Corporation (China)   Q2/15   2025-09-29
[ 542 ]  
 
Proposed updates to G.7710: Defining technology group classifications     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q14/15   2025-09-29
[ 541 ]  
 
Synchronous Ethernet interface jitter requirements in G.812     Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 540 ]  
 
Considerations of T-BC/T-TSC long-term transient [G.8273.2, G.8273]     Nokia Corporation (Finland)   Q13/15   2025-09-29
[ 539 ]  
 
Key fibre and cable attributes of HCF     Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)   Q6/15, Q5/15   2025-09-29
[ 538 ]  
 
Proposal of starting discussions on HCF     Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)   Q6/15, Q5/15   2025-09-29
[ 537 ]  
 
Taxonomy on Autonomous Networking, NMA and intelligence     China Academy of Information and Communications Technology , China Unicom , Huawei Technologies Co., Ltd. (China)   Q14/15, Q12/15   2025-09-29
[ 536 ]  
 
Architectural and Management gap analysis for task-driven DCI network resource scheduling for distributed AI computing     China Academy of Information and Communications Technology , China Mobile Communications Co. Ltd. , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q14/15, Q12/15   2025-09-29
[ 535 ]  
 
Consideration, progress and scope for passive resource management     China Mobile Communications Co. Ltd. , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q14/15   2025-09-29
[ 534 ]  
(Rev.1) 
Proposal to new ITU-T Recommendation G.OMCI4FTTR "Management and control interface of FTTR using enhanced OMCI"     Calix Networks, Inc. (United States) , China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China) , Orange   Q2/15   2025-09-29
[ 533 ]  
 
Proposal of new Recommendation on Multichannel free space optics for terrestrial short reach interfaces     China Academy of Information and Communications Technology , China Information Communication Technologies Group , China Unicom , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q6/15   2025-09-29
[ 532 ]  
 
Link G.994x and G.sup.CoexFIN     China Unicom , Huawei Technologies Co., Ltd. (China)   Q3/15   2025-09-29
[ 531 ]  
 
Proposal of G.698.4 revision to include the self-tuning functions     China Unicom , ZTE Corporation (China)   Q6/15   2025-09-29
[ 530 ]  
 
Time synchronization discussion of G.FIN     China Academy of Information and Communications Technology , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q3/15   2025-09-29
[ 529 ]  
 
Consideration on reducing SFU response time     China Academy of Information and Communications Technology , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q3/15   2025-09-29
[ 528 ]  
(Rev.1) 
Consideration on dynamic power saving of M-FTR     China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China)   Q3/15   2025-09-29
[ 527 ]  
 
Considerations of naming for G.fso interfaces Ss and Rs     China Unicom , Huawei Technologies Co., Ltd. (China)   Q6/15   2025-09-29
[ 526 ]  
 
Considerations on standardization of optical monitoring technology for management of optical modules     ADTRAN Holdings Inc. (United States) , China Unicom , Huawei Technologies Co., Ltd. (China)   Q6/15   2025-09-29
[ 525 ]  
 
The self tuning procedure for the revised G.698.4     China Unicom , ZTE Corporation (China)   Q6/15   2025-09-29
[ 524 ]  
 
Supplementary text for sensing use cases in G.suppl.VHSP draft     China Telecommunications Corporation   Q2/15   2025-09-29
[ 523 ]  
(Rev.1) 
Proposal to start a new supplement on use cases and requirements of AI enhanced optical networks for access and home     Algerie Telecom SPA (Algeria) , AT&T, Inc. (United States) , China Academy of Information and Communications Technology , China Information Communication Technologies Group , China Telecommunications Corporation , Fraunhofer HHI & IIS (Germany) , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q3/15, Q2/15   2025-09-29
[ 522 ]  
 
Proposal for the future standardization direction of feed-forward sensing     China Unicom , Huawei Technologies Co., Ltd. (China)   Q6/15, Q12/15   2025-09-29
[ 521 ]  
 
Phase-based sensing-communication integration scheme     Beijing Institute of Technology (China) , China Unicom   Q6/15   2025-09-29
[ 520 ]  
 
The general capabilities supplement of NMA in the GSTR.ENO     China Unicom   Q14/15, Q12/15   2025-09-29
[ 519 ]  
 
The supplement of use cases for GSTR.ENO     China Unicom   Q14/15, Q12/15   2025-09-29
[ 518 ]  
 
Discussion of implication of fibre optical sensing on the standards of management and control of optical networks  
To be verified by TSB
 
China Mobile Communications Co. Ltd. , China Telecommunications Corporation , ZTE Corporation (China)   Q14/15, Q12/15   2025-09-29
[ 517 ]  
 
Proposals of updating some contents of draft TR ION-2030  
To be verified by TSB
 
ZTE Corporation (China)   Q12/15   2025-09-29
[ 516 ]  
 
Proposals of updating the ENO reference architecture and enhancing the contents of NMA capabilities alignment  
To be verified by TSB
 
China Telecommunications Corporation , ZTE Corporation (China)   Q12/15   2025-09-29
[ 515 ]  
 
Proposed revised text for clause 5 of CoexFIN supplement     China Telecommunications Corporation , China Unicom   Q3/15   2025-09-29
[ 514 ]  
 
Proposals on Light-Source Selection for Far-End ICXT Measurement in G.650.2     China Information Communication Technologies Group , China Telecommunications Corporation , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)   Q5/15   2025-09-29
Results:372 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-10-6