Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 424 ]
|
Comparing the extended linear protection mechanisms with the wrapping and steering in the T-MPLS ring
|
ZTE Corporation
|
Q9/15
|
2007-05-24 |
|
[ 423 ]
|
Applying the extended linear protection switching mechanisms in the T-MPLS ring
|
ZTE Corporation
|
Q9/15
|
2007-05-24 |
|
[ 422 ]
|
An extension of the bit rate agnostic mapping method for constant bit rate signals
|
ZTE
|
Q11/15
|
2007-05-24 |
|
[ 421 ]
|
Correcting the binding relationship between different control plane components in G.7716
|
ZTE Corporation
|
Q14/15
|
2007-05-24 |
|
[ 420 ]
|
A proposed description of Ethernet Virtual Private Rooted Multipoint (EVP-RMP) service
|
Alcatel Shanghai Bell, LSI Corp
|
Q11/15
|
2007-05-24 |
|
[ 419 ]
(Rev.1) |
Definition of rooted multipoint service
|
Alcatell Shanghai Bell, LSI Corp
|
Q11/15
|
2007-05-24 |
|
[ 418 ]
|
Proposed modification of accounting management to G.7718
|
China, Telecom
|
Q14/15
|
2007-05-24 |
|
[ 417 ]
|
Proposals for control plane performance monitoring parameters
|
China Academy of Telecommunications Research (MII)
|
Q14/15, Q12/15
|
2007-05-24 |
|
[ 416 ]
|
Timing Requirements for packet-based methods
|
Semtech
|
Q13/15
|
2007-05-24 |
|
[ 415 ]
|
Metrics related to QoS and QoE related to timing
|
Semtech
|
Q13/15
|
2007-05-24 |
|
[ 414 ]
|
Traffic Models in G.8261 - Part 2
|
Semtech
|
Q13/15
|
2007-05-24 |
|
[ 413 ]
|
Traffic Models in G.8261 - Part 1
|
Semtech
|
Q13/15
|
2007-05-24 |
|
[ 412 ]
|
Support of manageable multicast in G.984.4
|
Ministry of Information Industry of P.R. China
|
Q2/15
|
2007-05-24 |
|
[ 411 ]
|
Proposed text for section 6, 9.3 and 11.2.1 of G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 410 ]
|
Proposed text for section 5 of G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 409 ]
|
Proposals of new interface to LRM component in G.8080
|
Ministry of Information Industry of P.R. China
|
Q12/15
|
2007-05-24 |
|
[ 408 ]
|
Explanations to ASON directly support VCAT and LCAS (For Information)
|
Ministry of Information Industry of P.R. China
|
Q12/15
|
2007-05-24 |
|
[ 407 ]
|
Support point to multi point connection in G.8080
|
Ministry of Information Industry of P.R. China
|
Q12/15
|
2007-05-24 |
|
[ 406 ]
|
Proposed new section 14 in G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 405 ]
|
Proposed text for section 10.3 of G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 404 ]
|
Proposal to table 1 of section 8.1 of G.7716 v0.7 draft
|
Ministry of Information Industry of P.R. China
|
Q14/15
|
2007-05-24 |
|
[ 403 ]
|
WITHDRAWN - See C476
|
N/A
|
|
N/A |
|
[ 402 ]
|
G.paclock Synchronisation Selection
|
BT plc
|
Q13/15
|
2007-05-24 |
|
[ 401 ]
|
Synchronous Ethernet - Synchronisation Status Message (SSM) Transport Requirements
|
BT plc
|
Q13/15
|
2007-05-24 |
|
[ 400 ]
|
Framework for Extracting Timing Metrics from a Packet-Based Network
|
Symmetricom
|
Q13/15
|
2007-05-22 |
|
[ 399 ]
|
IEEE-1588v2 Telecom Profile for Constrained Networks
|
Semtech
,
Symmetricom
|
Q13/15
|
2007-05-22 |
|
[ 398 ]
|
Proposals for Clause 8.2, Reference Timing Signal over Packet Networks in G.8261
|
Ericsson
,
Symmetricom
|
Q13/15
|
2007-05-22 |
|
[ 397 ]
|
Synchronous Ethernet Equipment - External Synchronisation (non Traffic carrying) Interface Requirements
|
BT
|
Q13/15
|
2007-05-24 |
|
[ 396 ]
|
Accessible Regions of ARQ and Interleaved RS
|
BT plc
|
Q4/15
|
2007-05-24 |
|
[ 395 ]
|
Component and protocol for Management of Control Channels in G.8080
|
ETRI
|
Q14/15, Q12/15
|
2007-05-24 |
|
[ 394 ]
|
Configuration, Liveliness Check and Resilience of Control Channels in ASON
|
ETRI
|
Q14/15, Q12/15
|
2007-05-24 |
|
[ 393 ]
|
Completion of jitter specifications in G.783 and G.825 for 10 Gb/s and 40 Gb/s
|
Lucent Technologies Germany
|
Q9/15, Q13/15
|
2007-05-24 |
|
[ 392 ]
|
Continuation of jitter specifications in G.783 and G.825 for and 40 Gb/s rates
|
Alcatel-Lucent Germany
|
Q6/15, Q9/15, Q13/15
|
2007-05-24 |
|
[ 391 ]
|
Frame Delay Measurement Considerations for G.8021
|
Nortel Networks (Europe)
|
Q9/15
|
2007-05-24 |
|
[ 390 ]
|
A proposal for EXER operation in G.8031v2
|
Korea (Republic of)
|
Q9/15
|
2007-05-24 |
|
[ 389 ]
|
A proposed modification to criteria for dFOP in G.8021v2 and G.8031v2
|
Korea (Republic of)
|
Q9/15
|
2007-05-24 |
|
[ 388 ]
(Rev.1) |
OTU4/ODU4 rates spreadsheet for proposed OTU4/ODU4 frame format in G.709
|
Korea (Republic of)
|
Q11/15
|
2007-05-24 |
|
[ 387 ]
(Rev.1) |
Proposal for new OTU4/ODU4 frame format in G.709
|
Korea (Republic of)
|
Q11/15
|
2007-05-24 |
|
[ 386 ]
|
G.hn: Proposed modifications to "Draft text for G.hn - version 1.0"
|
CopperGate Communications
|
Q4/15
|
2007-05-24 |
|
[ 385 ]
|
G.hn: Powerline communications channel characterization up to 100 MHz
|
France Telecom
|
Q4/15
|
2007-05-24 |
|
[ 384 ]
|
G.8261 - Clarification of the two main aspects CES / PNT in the document
|
Ericsson
,
France Telecom
|
Q13/15
|
2007-05-24 |
|
[ 383 ]
|
Proposal to include additional text for characterization of various PXC output power change patterns and configurations in G.otf
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15
|
2007-05-24 |
|
[ 382 ]
|
Specification of an ODU4 in Recommendation G.709 and consequences for optical interface Recommendations
|
Nokia Siemens Networks
,
Deutsche Telekom
|
Q11/15, Q6/15
|
2007-05-23 |
|
[ 381 ]
|
Information on relationship of terms between submarine system and the other recommendations
|
NTT
|
Q8/15
|
2007-05-23 |
|
[ 380 ]
|
Proposal on new definitions and terms for Rec. G.972
|
NTT
|
Q8/15
|
2007-05-23 |
|
[ 379 ]
|
Proposal on additional measurement technique in Rec. G.976
|
NTT
|
Q8/15
|
2007-05-23 |
|
[ 378 ]
|
Proposal on a new Supplement regarding with the general characteristics of an optical fibre under actual use conditions
|
NTT
|
Q5/15
|
2007-05-23 |
|
[ 377 ]
|
Proposed update to G.Sup42 and its agreement
|
NTT
,
Mitsubishi Electric
|
Q1/15
|
2007-05-23 |
|
[ 376 ]
|
Mapping of 100 GBE into ODU2-11v and ODU3-3v
|
Deutsche Telekom
|
Q11/15
|
2007-05-23 |
|
[ 375 ]
|
OTN and 40 GbE
|
Deutsche Telekom
|
Q11/15
|
2007-05-23 |
Results:332 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):