International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP4A  C 

ITU-R R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:837 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 637 ]  
 
Proposals for WRC-27 agenda item 7 topic on transparency measures and improvements to the application of RR No. 4.4 to space services     Brazil   AI7   2025-10-07
[ 636 ]  
 
Assessing the potential advantage to define coordination arc for some frequency bands above 3.4 GHz and services currently not subject to the application of the coordination arc concept, and to review the existing coordination arc thresholds     Brazil   AI7   2025-10-07
[ 635 ]  
 
Working document towards candidate topic under WRC-27 agenda item 7 - The use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time     Brazil   AI7   2025-10-09
[ 634 ]  
 
FSS deployment models for GSO and non-GSO systems to be used for WRC-27 agenda item 1.2 studies     Brazil   AI1.2   2025-10-07
[ 633 ]  
 
On the consideration of new definitions relating to satellite orbits for the space radiocommunication     Kazakhstan     2025-10-08
[ 632 ]  
 
Considerations of elements for working document on WRC-27 agenda item 1.5     Kazakhstan   AI1.5   2025-10-08
[ 631 ]  
 
Proposed revisions to working document towards draft CPM text for WRC-27 agenda item 1.5 - WRC-27 agenda item 1.5 (Working Parties 4A, 1B, 4C)     Kazakhstan   AI1.5   2025-10-08
[ 630 ]  
 
Issue proposed to be considered under other regulatory issues in preparation of WRC-27 - Difficulties and inconsistencies encountered in the application of RR No. 9.21 on RR Nos. 5.430A and 5.434A     Latvia , Lithuania , Montenegro     2025-10-06
[ 629 ]  
 
Proposed topic to be considered under WRC-27 agenda item 7 - Unrealistic gain contours of submissions under RR Appendices 30, 30A and 30B     Bosnia and Herzegovina , Croatia , Lithuania , Montenegro , North Macedonia , Serbia   AI7   2025-10-06
[ 628 ]  
 
Elements of working document towards draft CPM text for topic proposed under WRC-27 agenda item 7 - Improvements of coordination and notification procedures involving frequency assignments in space services in the context of application of RR No. 11.41     Bosnia and Herzegovina , Croatia , France , Montenegro , North Macedonia , Serbia   AI7   2025-10-06
[ 627 ]  
 
Elements of working document towards draft CPM text for topic proposed under WRC-27 agenda item 7 - Transparency measures and improvements to the application of RR No. 4.4 to space/satellite services     Bosnia and Herzegovina , Croatia , France , Montenegro , North Macedonia , Serbia   AI7   2025-10-06
[ 626 ]  
 
Coherent approach in consideration of RR Appendices 30, 30A and 30B fundamental and particular issues and long term protection of BSS and FSS planned frequency bands     Bosnia and Herzegovina , Croatia , France , Montenegro , North Macedonia , Serbia   AI7   2025-10-06
[ 625 ]  
 
Proposal to upgrade to draft revision the preliminary draft revision of Recommendation ITU-R BO.1504-0     European Broadcasting Union , Broadcast Networks Europe     2025-10-06
[ 624 ]  
 
Interference measurement campaign on epfd limits in Botswana     Space Exploration Technologies Corp. (SpaceX)     2025-10-02
[ 623 ]  
 
Proposal for the development of an ITU-R Handbook on Satellite Communications and Technologies     AST & Science SpaceMobile     2025-10-03
[ 622 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[PLANAR ARRAYS] - Reference FSS earth-station planar array radiation pattern for use in frequency bands between 10.7 GHz and 30 GHz     Australia     2025-10-03
[ 621 ]  
 
The use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time     Australia   AI7   2025-10-03
[ 620 ]  
 
Recording of frequency assignments in space services under RR No. 11.41     Australia   AI7   2025-10-03
[ 619 ]  
 
Exclusion of the territory of a country from the service area of a geostationary satellite network (GSO) in the fixed-satellite service (FSS) or mobile-satellite service (MSS) in a frequency band not subject to a plan     Australia   AI7   2025-10-03
[ 618 ]  
 
Considerations on the potential establishment of a topic addressing RR No. 4.4 and related aspects under WRC-27 agenda item 7     Australia   AI7   2025-10-03
[ 617 ]  
 
Proposed simplified approach to take into account sidelobe gain for antennas modelled in Recommendation ITU-R S.1428-1 for incorporation into Recommendation ITU-R S.1503     Australia     2025-10-03
[ 616 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.1428-1 - Reference FSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands between 10.7 GHz and 30 GHz     Australia     2025-10-03
[ 615 ]  
 
Liaison statement to ITU-R working parties 4A, 5A and 5D - Request for feedback on the term "mesh network" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation     CCT     2025-10-03
[ 614 ]  
 
Proposals towards the preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO] - [Possible] Examples of methodologies to assess interference levels during coordination when non-geostationary FSS satellite systems for frequency ranges between 10.7 and 52.4 GHz are involved     Russian Federation     2025-10-02
[ 613 ]  
 
Proposals to the preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELLING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies     Russian Federation     2025-10-02
[ 612 ]  
 
Proposals to the working document of draft review of Recommendation ITU-R S.1529     Russian Federation     2025-10-02
[ 611 ]  
 
Proposals for reply liaison statement to Working Party 7B - Technical and operational characteristics of FSS systems for sharing and compatibility studies on WRC-27 agenda item 1.15     Russian Federation   AI1.15   2025-10-02
[ 610 ]  
 
Proposed topic to be considered under WRC-23 agenda item 7 - Enhancing the responsibility of the notifying administration of a satellite network or system in the context of global changes in the satellite industry     Russian Federation   AI7   2025-10-02
[ 609 ]  
 
Proposed topic to be included under WRC-27 agenda item 7, including proposed draft CPM text     Russian Federation   AI7   2025-10-02
[ 608 ]  
 
Sharing study between non-GSO FSS (Earth-to-space) and SRS (space-to-space) in the 13.77-13.78 GHz frequency band     Russian Federation     2025-10-02
[ 607 ]  
 
Sharing study between non-GSO FSS (Earth-to-space) and RLS in the 13.75-14 GHZ frequency band     Russian Federation   AI1.2   2025-10-02
[ 606 ]  
 
Sharing study of GSO FSS satellite networks with SRS systems operating in the 13.75-14 GHz frequency range under WRC-27 agenda item 1.2     Russian Federation   AI1.2   2025-10-02
[ 605 ]  
 
Proposed changes to working document related to a preliminary draft new recommendation ITU-R S.[ESIM-NCMC] and footnotes to Article 5 of the Radio Regulations     Russian Federation     2025-10-02
[ 604 ]  
 
Interference measurement campaign on epfd limits in Jordan     Jordan , Space Exploration Technologies Corp. (SpaceX)     2025-10-01
[ 603 ]  
 
Proposal for the ITU-R Handbook on Best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services     International Organization of Space Communications - INTERSPUTNIK     2025-10-01
[ 602 ]  
 
Liaison statement to Working Party 4A on WRC-27 agenda item 1.18     WP 7C   AI1.18   2025-09-29
[ 601 ]  
 
Liaison statement to Working Parties 4A and 5C regarding progress of work on WRC-27 agenda item 1.18     WP 7C   AI1.18   2025-09-29
[ 600 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C, 5D and 7B - EESS (passive) studies in the 6 425-7 250 MHz range     WP 7C     2025-09-26
[ 599 ]  
 
Liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Progress of activities relating to WRC-27 agenda item 1.15     WP 7B   AI1.15   2025-09-26
[ 598 ]  
 
Interference measurement campaign on epfd limits in Nigeria     Nigeria , Space X     2025-09-25
[ 597 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5B and 5C - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 7B     2025-09-26
[ 596 ]  
 
Contribution from the United Nations Office for Outer Space Affairs (UNOOSA) to the ITU-R Handbook on Best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services (copy to Study Group 4 for information)     Director, BR     2025-09-18
[ 595 ]  
 
Draft working document for the Handbook on Satellite Communications and Technologies     MEASAT Satellite Systems Sdn. Bhd.     2025-09-23
[ 594 ]  
 
Reply liaison statement to Working Party 4A - WRC-27 agenda item 1.2 - Characteristics of space research service systems operating in the 13.75-14.0 GHz band     WP 7B   AI1.2   2025-09-19
[ 593 ]  
 
Working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)   AI1.3   2025-09-11
[ 592 ]  
+Ch.1-16 
Draft working document for the Handbook on Satellite Communications and Technologies     MEASAT Satellite Systems Sdn. Bhd.     2025-09-04
[ 591 ]  
 
Handbook on Satellite Communications and Technologies     International Amateur Radio Union     2025-09-10
[ 590 ]  
 
Liaison statement on revising the structure and establishing assignment criteria for the assignment of E.164 numbering resources under the category of GMSS (Global Mobile Satellite Systems)     ITU-T SG2     2025-09-10
[ 589 ]  
 
Working document towards a preliminary draft new ITU-R Report WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)   AI1.1   2025-08-06
[ 588 ]  
 
Performance parameters for studies under WRC-27 agenda item 1.18, resolves 1) to Study Group 7, Working Parties 7C, 4A and 4C     Director, BR   AI1.18   2025-07-10
Results:837 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-12-19