International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP-7B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP-7B  C 

ITU-R WP-7B

Space Radiocommunication Applications

Results:278 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 78 ]  
 
Liaison statement to Working Party 7B - WRC-23 agenda item 1.18     WP 4C   AI1.18   2020-11-03
[ 77 ]  
 
Liaison statement to Working Party 5B (Copy for information to Working Parties 3M, 4A and 7B) - Information for studies on WRC-23 agenda item 1.6     WP 4C   AI1.6   2020-10-28
[ 76 ]  
 
Reply liaison statement to Working Party 7B - WRC-23 agenda item 1.2     WP 5D   AI1.2   2020-10-26
[ 75 ]  
(Rev.1) 
List of assignments that the Administration of Iran (Islamic Republic of) had notified to the Bureau and that are within the frequency bands subject to WRC-23 agenda items     Iran (Islamic Republic of)     2020-10-21
[ 74 ]  
 
Response liaison statement on 3GPP's activities related to WRC-19 Resolutions     Director, BR     2020-10-26
[ 73 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 WP 1/5 and ITU-R Working Parties 1A, 1C, 4A, 5A, 5B, 5C, 5D, 6A, 7A and 7B on strategies and policies concerning human exposure to EMF     ITU-D SG 2     2020-10-23
[ 72 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Task Group 6/1 for information) - WRC-23 agenda item 1.4     WP 5D   AI1.4   2020-10-21
[ 71 ]  
 
Reply liaison statement to ITU-R Working Parties 3K and 3M (copy to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C, and 7D for information) - Preparations for WRC-23 agenda items 1.1 and 1.2     WP 5D   AI1.2, AI1.1   2020-10-21
[ 70 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4C, 5A, 5B, 5C, and 7B - WRC-23 agenda item 1.16     WP 7C   AI1.16   2020-10-06
[ 69 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4B, 4C, 5A, 5B, 5C and 7B) - WRC-23 agenda item 1.17     WP 7C   AI1.17   2020-10-06
[ 68 ]  
 
Reply liaison statement to Working Party 7B - WRC-23 agenda item 1.13     WP 7C   AI1.13   2020-10-05
[ 67 ]  
(Rev.1) 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B 4C 6A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.2     WP 7C   AI1.2   2020-10-05
[ 66 ]  
+Ann.1-12 
Report of the meeting of Working Party 7B (e-Meeting, 21-25 September 2020)     Chairman, WP 7B     2020-09-25
[ 65 ]  
 
Final list of participants - Working Party 7B (e-Meeting, 21-25 September 2020)     Director, BR     2020-09-25
[ 64 ]  
 
List of Documents issued (Documents 7B/14 - 7B/64)     BR Study Groups Department     2020-09-21
[ 63 ]  
 
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range     WP 7D     2020-09-21
[ 62 ]  
 
Reply liaison statement to Working Party 7B - WRC-23 agenda item 1.13 - Characteristics and protection criteria of the radio astronomy service operating in the frequency band 15.35-15.4 GHz     WP 7D   AI1.13   2020-09-18
[ 61 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-23     Chairman, CPM-23     2020-09-18
[ 60 ]  
 
Comments on preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR]     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites     2020-09-14
[ 59 ]  
 
Proposal of draft reply liaison statement to Working Party 5D regarding agenda item 1.4     Brazil (Federative Republic of)   AI1.4   2020-09-14
[ 58 ]  
 
Organization of Working Party 7B and Terms of Reference of its Working Groups     Chairman, WP 7B     2020-09-14
[ 57 ]  
 
Proposed liaison statement to Working Party 5D on the studies related to RR No. 21.5 regarding AAS     France     2020-09-11
[ 56 ]  
 
Draft liaison statement to Working Party 5D - [Draft] new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION]     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites     2020-09-10
[ 55 ]  
 
Reply liaison statement to Working Parties 3K and 3M (copy to Working Party 5D for information) - [Draft] new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION]     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites     2020-09-10
[ 54 ]  
 
[Draft] new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION] - Methodologies for calculating coordination zones around Earth exploration satellite and space research earth stations to avoid harmful interference from IMT-2020 systems in the frequency bands 25.5-27 GHz and 37-38 GHz     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites     2020-09-10
[ 53 ]  
 
Draft liaison statement to Working Party 4A - Working document towards a revision of Report ITU-R SA.2307 - Protection of SRS and FSS systems sharing the 37.5-38 GHz band     European Space Agency     2020-09-10
[ 52 ]  
 
This document has been withdrawn.     BR Study Groups Department     2020-09-28
[ 51 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[15 GHZ SRS SHARING] - Sharing and compatibility studies for the SRS in the band 14.8-15.35 GHz     United States of America   AI1.13   2020-09-10
[ 50 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R SA.[15 GHZ SRS CHARACTERISTICS] - Characteristics of SRS systems in the frequency range 14.8-15.35 GHz     United States of America   AI1.13   2020-09-10
[ 49 ]  
 
Proposed Working Party 7B work plan for WRC-23 agenda item 1.13 - Possible upgrade of the SRS allocation in the 14.8-15.35 GHz band     United States of America   AI1.13   2020-09-10
[ 48 ]  
 
Preliminary draft new Recommendations ITU-R SA.[S-BAND DL USE OPT] and ITU-R SA.[S-BAND UL USE OPT] - Guidelines on the use of the 2 025-2 110 MHz and 2 200-2 290 MHz frequency bands by SRS/EESS/SOS satellites     United States of America     2020-09-10
[ 47 ]  
 
Preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR] - Characteristics to be used for conducting sharing studies and assessing interference to systems operating in the Earth Exploration-Satellite Service (EESS) and Meteorological-Satellite (MetSat) service     United States of America     2020-09-10
[ 46 ]  
 
Update to methodologies for calculating coordination zones around Earth exploration-satellite and space research Earth stations to avoid harmful interference from IMT-2020 systems in the frequency bands 25.5-27 GHz and 37-38 GHz     United States of America     2020-09-10
[ 45 ]  
 
Proposed liaison statement from Working Party 7B to Working Party 5D regarding WRC-23 agenda item 1.2     United States of America   AI1.2   2020-09-10
[ 44 ]  
 
Use of the space research service allocation in the frequency band 14.5-14.8 GHz     Director, BR     2020-09-08
[ 43 ]  
 
Proposed revisions to the working document on the draft work plan of Working Party 7B for WRC-23 agenda item 1.13     China (People's Republic of)   AI1.13   2020-09-07
[ 42 ]  
 
Proposal for reply liaison statement to Working Party 5D on WRC-23 agenda item 1.2     Russian Federation   AI1.2   2020-09-03
[ 41 ]  
 
Proposals for modification of draft new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION]     Russian Federation     2020-09-03
[ 40 ]  
 
Initial reply liaison statement to Working Party 4C (copied to Working Parties 4A, 4B, 5A, 5B, 5C, 5D and 7B for information) - WRC-23 agenda item 1.18     WP 3M   AI1.18   2020-08-31
[ 39 ]  
 
Initial reply liaison statement to Working Party 5D (copied for information to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - WRC-23 agenda items 1.1 and 1.2     WPs 3K and 3M   AI1.2, AI1.1   2020-08-28
[ 38 ]  
 
Initial reply liaison statement to Working Party 7B (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-23 agenda item 1.13     WP 3M   AI1.13   2020-08-28
[ 37 ]  
(Rev.1) 
Reply liaison statement to Working Party 7B (copy to Working Party 5D for information) - [Draft] new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION]     WPs 3K and 3M     2020-08-27
[ 36 ]  
 
Initial reply liaison statement to Working Party 5D (copied to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4     WPs 3J, 3K and 3M   AI1.4   2020-08-27
[ 35 ]  
 
Reply liaison statement to Working Party 5B (copied to Working Parties 3M, 4C and 7B for information) - WRC-23 agenda item 1.7 - Propagation considerations of a new aeronautical mobile-satellite (R) service allocation in the frequency band 117.975-137 MHz     WP 3L   AI1.7   2020-08-27
[ 34 ]  
 
Reply liaison statement to Working Party 5D (copied for information to Working Parties 4A, 4C, 5A, 5B, 6A, 7B, 7C and 7D) - WRC-23 agenda item 1.4     WP 5C   AI1.4   2020-08-07
[ 33 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2     WP 5C   AI1.2   2020-08-07
[ 32 ]  
 
Reply liaison statement to Working Party 4C (copied for information to Working Parties 4A, 4B, 5A, 5B, 5D, 7B, 7C and 3M) - WRC-23 agenda item 1.18     WP 5C   AI1.18   2020-09-08
[ 31 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 3M, 5A, 7C and 7D for information) - WRC-23 agenda item 1.13     WP 5C   AI1.13   2020-08-06
[ 30 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 7B and 7C) - WRC-23 agenda item 1.17     WP 5C   AI1.17   2020-08-06
[ 29 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M, 5A, 7B and 7D for information) - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency range 275-450 GHz     WP 5C     2020-08-06
Results:278 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-11-10