Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 389 ]
|
Reply liaison statement to ITU-R Working Party 5D on revision of Report ITU-R M.2373 (copy to Working Parties 6A and 6C) - Audio-visual capabilities and applications supported by terrestrial IMT systems
|
WP 6B
|
|
2018-05-04 |
|
[ 388 ]
|
Reply liaison statement to ITU-R Working Party 7A on UTC (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems»
regarding broadcasting systems
|
WP 6B
|
|
2018-05-04 |
|
[ 387 ]
+Ann.1-13 |
Report of the meeting of Working Party 6A (Geneva, 17-25 April 2018)
|
Chairman, WP 6A
|
|
2018-04-26 |
|
[ 386 ]
|
Final list of participants Working Party 6A (Geneva, 17-25 April 2018)
|
Director, BR
|
|
2018-04-25 |
|
[ 385 ]
|
Liaison statement to ITU-R Working Parties 6B and 6A - Use of Artificial Intelligence (AI) for Broadcasting
|
WP 6C
|
|
2018-04-23 |
|
[ 384 ]
|
Liaison statement to ITU-R Working Party 6B (and Working Party 6A for information) - An element of reply liaison statement to ITU-R Working Party 5D
|
WP 6C
|
|
2018-04-23 |
|
[ 383 ]
|
Liaison statement on ITU Inter-Sector coordination on lead SG activities
|
ITU-T SG 15
|
|
2018-04-17 |
|
[ 382 ]
|
List of documents issued (Document 6A/316 (carried over from the last WP 6A meeting) and
Documents 6A/318 - 6A/382)
|
BR Study Groups Department
|
|
2018-04-16 |
|
[ 381 ]
|
Measurements of IMT base station activity
|
Broadcast Networks Europe
|
|
2018-04-10 |
|
[ 380 ]
|
Calculating the probability of interference to DTTB services when Monte-Carlo simulations do not include time
|
Broadcast Networks Europe
|
|
2018-04-10 |
|
[ 379 ]
|
Report on recent developments concerning PLT systems and general EMC-related interference issues (Question ITU-R 221/1)
|
Rapp. on PLT and general EMC-related
|
Q221/1
|
2018-04-10 |
|
[ 378 ]
|
Activity Report and draft liaison statement to Working Party 3K
|
Chairman, CG on MER
|
|
2018-04-09 |
|
[ 377 ]
|
Working document towards a new Report ITU-R BT.[BEYOND1stGEN] - Guidance for implementing beyond 1st generation DTTB systems and methods for evaluation of their quality of service performance requirements
|
Free TV Australia Ltd.
|
Q132/6
|
2018-04-10 |
|
[ 376 ]
|
Proposed revision to the working document towards a preliminary draft new Report ITU-R BT.[B3BCPARAM] - Characteristics of digital terrestrial broadcasting systems in the frequency band [174-230] MHz for frequency sharing/interference analyses
|
Brazil (Federative Republic of)
|
|
2018-04-09 |
|
[ 375 ]
|
Proposed revision to the working document towards a preliminary draft new Report ITU-R BT.[DTTPLANNINGCAC] - Technical criteria for DTT planning in Central American and Caribbean Region
|
Brazil (Federative Republic of)
|
|
2018-04-09 |
|
[ 374 ]
|
Revisions to the working document towards a preliminary draft revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting
|
Digital Radio Mondiale
|
|
2018-04-09 |
|
[ 373 ]
|
Laboratory test for RF synchronization based DTMB SFN
|
China (People's Republic of)
|
Q136/6
|
2018-04-09 |
|
[ 372 ]
|
Preliminary draft revision of Report ITU-R BT.2140-10 - Transition from analogue to digital terrestrial broadcasting
|
China (People's Republic of)
|
Q136/6
|
2018-04-09 |
|
[ 371 ]
|
Report to Working Party 6A - Guidance for implementing beyond 1st generation DTTB systems and methods for their quality of service performance requirements and evaluation
|
CG [BEYOND1stGEN]
|
|
2018-04-09 |
|
[ 370 ]
(Rev.1) |
Use of MER to assess impact of anomalous propagation on co-channel interference
|
Free TV Australia Ltd.
|
|
2018-04-09 |
|
[ 369 ]
|
Rapporteur's Report on new terms and definitions
|
Rapporteur on Terminology, SG 6
|
|
2018-04-09 |
|
[ 368 ]
(Rev.1) |
Progress Report WRC-19 agenda items 1.1, 1.3, 1.6, 1.7, 1.10, 1.11, 1.12, 1.13, 1.15 and 9.1, issues 9.1.2 and 9.1.6
|
RG for WRC-19 related studies
|
AI9.1, AI1.7, AI1.6, AI1.3, AI1.15, AI1.13, AI1.12, AI1.11, AI1.10, AI1.1
|
2018-04-09 |
|
[ 367 ]
|
Request for new Rapporteur Group - Modifications and additions to the 2016 edition of the "Handbook on digital television broadcasting networks and system implementation"
|
United States of America
|
|
2018-04-06 |
|
[ 366 ]
|
Proposed revision of Recommendation ITU-R BS.1660 - Technical basis for planning of terrestrial digital sound broadcasting in the VHF band
|
United States of America
|
|
2018-04-06 |
|
[ 365 ]
|
Proposed revision of Report ITU-R BS.2214 - Planning parameters for terrestrial digital sound broadcasting systems in VHF bands
|
United States of America
|
|
2018-04-06 |
|
[ 364 ]
|
For information - The ATSC 3.0 digital transmission standard
|
United States of America
|
|
2018-04-06 |
|
[ 363 ]
|
Studies in response to Resolution ITU-R 59-1 on frequency bands and tuning ranges for ENG use
|
United States of America
|
|
2018-04-06 |
|
[ 362 ]
|
Information on LF and MF broadcasting transmitters subject to impact for WPT
|
European Broadcasting Union
|
|
2018-04-06 |
|
[ 361 ]
|
Proposed reply liaison statement to Working Party 1A on consideration of working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]
|
European Broadcasting Union
|
|
2018-04-06 |
|
[ 360 ]
|
Proposed reply liaison statement to ITU-R Working Party 5D on revision of Report ITU-R M.2373 - Audio-visual capabilities and applications supported by terrestrial IMT systems
|
Japan
|
|
2018-04-05 |
|
[ 359 ]
|
Proposed draft new Question ITU-R [AI4BC]/6 - Use of Artificial Intelligence (AI) for Broadcasting
|
Iran (Islamic Republic of)
,
Japan
,
United Kingdom of Great Britain and Northern Ireland
|
|
2018-04-05 |
|
[ 358 ]
|
Proposed revision of working document towards a preliminary draft new Report ITU-R BT.[ADVBROADCAST]
|
Japan
|
Q133/6
|
2018-04-05 |
|
[ 357 ]
|
Proposed revision of Report ITU-R BT.2344-1 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting
|
Japan
|
|
2018-04-05 |
|
[ 356 ]
|
Field tests of digital terrestrial sound and multimedia broadcasting system RAVIS
|
Russian Federation
|
Q56/6, Q45/6
|
2018-04-05 |
|
[ 355 ]
+Add.1 |
Report on recent developments on WPT under issue 9.1.6 of WRC-19 - Urgent considerations regarding development of the CPM text on issue 9.1.6 of WRC-19
|
Rapp. on WPT Issues
|
AI9.1
|
2018-04-05 |
|
[ 354 ]
|
Proposed revision of Report ITU-R BT.2343-2 - Collection of field trials of UHDTV over DTT networks
|
Korea (Republic of)
|
Q133/6
|
2018-04-04 |
|
[ 353 ]
|
Revision of Resolution 641 (Rev.HFBC-87) and Resolution 647(Rev.WRC-15) proposed by Study Group 6
|
Director, BR
|
|
2018-04-04 |
|
[ 352 ]
|
Use of MER to assess impact of anomalous propagations on co-channel interferences
|
Rai Way S.p.A.
|
|
2018-03-27 |
|
[ 351 ]
|
Liaison statement on request for information on ITU-D and ITU-R activities on deployment of digital (terrestrial) television in developing countries
|
ITU-T SG 9
|
|
2018-03-23 |
|
[ 350 ]
|
Liaison statement to Working Party 5B (copy for information to Working Parties 4B, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and 3M) - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)
|
WP 4A
|
AI1.10
|
2018-03-21 |
|
[ 349 ]
|
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2
|
WP 4A
|
AI9.1
|
2018-03-21 |
|
[ 348 ]
|
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Draft documents including draft CPM text related to WRC-19 agenda item 1.6, Resolution 159 (WRC-15)
|
WP 4A
|
AI1.6
|
2018-03-21 |
|
[ 347 ]
|
Report of the eighth meeting of IR-IBB (Geneva, 26 January 2018)
|
Co-Chair, IRG-IBB
|
|
2018-03-13 |
|
[ 346 ]
|
Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz
|
SG 5
|
|
2018-03-06 |
|
[ 345 ]
|
Liaison statement on ITU inter-Sector coordination
|
ITU-T (TSAG)
|
|
2018-03-05 |
|
[ 344 ]
|
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS
|
WP 4B
|
|
2018-02-23 |
|
[ 343 ]
|
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS
|
WP 4A
|
|
2018-02-20 |
|
[ 342 ]
|
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems
|
WP 4C
|
|
2018-02-20 |
|
[ 341 ]
|
Liaison statement to Working Parties 6A, 6B, 6C - Draft revision of Report ITU-R M.2373
|
WP 5D
|
|
2018-02-13 |
|
[ 340 ]
|
Reply liaison statement to Working Party 4A (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2
|
WP 5D
|
AI9.1
|
2018-02-13 |
Results:589 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):