Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 569 ]
(Rev.1) |
Results of the 21th RAG meeting
|
Chairman, SG 5
|
|
2014-08-27 |
|
[ 568 ]
|
Reply liaison statement informing about MEF 22.1 and MEF 22.1.1 - Mobile backhaul implementation agreement
|
Director, BR
|
|
2014-08-20 |
|
[ 567 ]
|
LS/r on Recommendation ITU-T K.60 - Coexistence of wired and wireless communication systems
|
ITU-T SG 5
|
|
2014-08-08 |
|
[ 566 ]
|
Liaison statement to Working Party 5A - Updating the integrated database of ITU terms and definitions
|
CCV
|
|
2014-07-30 |
|
[ 565 ]
|
Liaison statement on draft ITU-T F.ACC-Term
|
ITU-T SG 16
|
|
2014-07-28 |
|
[ 564 ]
|
Reply liaison statement to Working Party 5A - WRC-15 agenda item 1.10
|
WP 4C
|
|
2014-07-17 |
|
[ 563 ]
|
Reply liaison statement to Working Party 5A - WRC-15 agenda item 1.9.2
|
WP 4C
|
|
2014-07-17 |
|
[ 562 ]
|
Liaison statement ITU-R Working Party 5A on ITS technical parameters, Recommendation ITU-R M.[V2X]
|
European Telecommunications Standards Institute
|
|
2014-06-19 |
|
[ 561 ]
(Rev.1) |
[WORKING PARTY 5A AND] Working Party 5D - Proposal for draft reply liaison statement to Joint Coordination Activity on Accessibility and Human Factors (JCA-AHF)
|
WP 5D
|
|
2014-06-30 |
|
[ 560 ]
|
Reply liaison statement - IMT systems and broadband trunking communication (B-TRUNC) system for PPDR
|
WP 5D
|
|
2014-06-30 |
|
[ 559 ]
|
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems
|
WP 1A
|
|
2014-06-20 |
|
[ 558 ]
|
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations
|
WP 1A
|
|
2014-06-20 |
|
[ 557 ]
|
Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast
|
WP 1A
|
|
2014-06-20 |
|
[ 556 ]
|
Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D) - Considerations on the G.9700 power spectral density (PSD) limit mask
|
WP 1A
|
|
2014-06-20 |
|
[ 555 ]
|
Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment
|
WP 1A
|
|
2014-06-20 |
|
[ 554 ]
|
Liaison statement to ITU-T Study Group 15 and CENELEC (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference
|
WP 1A
|
|
2014-06-20 |
|
[ 553 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
|
WP 1B
|
|
2014-06-19 |
|
[ 552 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems
|
WP 1A
|
|
2014-06-19 |
|
[ 551 ]
|
Liaison statement to Working Party 5B (copy for information to Working Parties 5A and 5C) - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 1C
|
240/5
|
2014-06-17 |
|
[ 550 ]
|
Liaison statement on treatment about FG-DR&NRR deliverables
|
ITU-T SG 2
|
|
2014-06-12 |
|
[ 549 ]
|
Liaison statement on coexistence of wired telecommunications with radiocommunication systems (reply to COM5-LS45)
|
ITU-T SG 9
|
|
2014-06-02 |
|
[ 548 ]
|
Liaison statement on additional information on regional regulations related to coexistence of wired telecommunication with radiocommunication systems
|
ITU-T SG 9
|
|
2014-06-02 |
|
[ 547 ]
|
Liaison statement to Working Parties 1A, 5A, 5C and 5D regarding development of a Report on out-of-band emissions in the 2 700-2 900 MHz frequency band from service operating below 2 690 MHz
|
WP 5B
|
|
2014-05-30 |
|
[ 546 ]
|
Reply liaison statement to ITU-R Joint Task Group 4-5-6-7 (copy for information to Working Party 5A) - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency bands 5 350-5 470 and/or 5 725-5 850 MHz bay WAS/RLANS
|
WP 5B
|
|
2014-05-30 |
|
[ 545 ]
|
Liaison statement to ITU-T Study Groups 5, 9, 15 and ITU-R Working Party 1A (copied for information to ITU-R Working Parties 5A, 5C, 5D and 6A) - Liaison statement on coexistence of wired telecommunications with radiocommunication systems
|
WP 5B
|
|
2014-05-30 |
|
[ 544 ]
|
Liaison statement to Working Party 1B (copied for information to ITU-R Working Parties 5A, 5C and 5D) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
|
WP 5B
|
|
2014-05-30 |
|
[ 543 ]
+Ann.1-22 |
Report on the thirteenth meeting of Working Party 5A (Geneva, 19 - 29 May 2014)
|
Chairman, WP 5A
|
|
2014-05-29 |
|
[ 542 ]
(Rev.1) |
Final list of participants - Working Party 5A (Geneva, 19-29 May 2014)
|
Director, BR
|
|
2014-05-29 |
|
[ 541 ]
|
Report on relevant activities in certain countries in Region 2
|
Liaison Rapporteur
|
|
2014-05-29 |
|
[ 540 ]
|
Collaboration on ITS communication standards
|
Liaison Rapporteur
|
|
2014-05-29 |
|
[ 539 ]
|
Liaison statement to ITU-R Working Parties 5A and 5D ITU-T Study Groups 13 and 15 (copy for information to ITU-D Study Group 2, BBF, MEF] - Working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed service for backhaul for IMT and other terrestrial mobile broadband systems
|
WP 5C
|
|
2014-05-28 |
|
[ 538 ]
|
Liaison statement to Working Parties 5A and 5D - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
|
WP 5C
|
|
2014-05-28 |
|
[ 537 ]
|
Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
|
WP 5C
|
|
2014-05-28 |
|
[ 536 ]
|
Liaison statement to Working Party 4C (copy to Working Parties 3M, 4A, 4B, 5A, 5B and 7B for information) - WRC-15 agenda item 1.9.2
|
WP 5C
|
|
2014-05-28 |
|
[ 535 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1
|
WP 5C
|
|
2014-05-28 |
|
[ 534 ]
|
Liaison statement to Working Party 1B (copied for information to Working Parties 5A and 5B) - Development of a draft new Report ITU-R SM.[WHITE-SPACE] spectrum management principles and spectrum engineering techniques for the use of "White spaces" by radio systems employing cognitive capabilities
|
WP 5C
|
|
2014-05-28 |
|
[ 533 ]
|
Liaison statement on Recommendation ITU-R F.1105-3 (Fixed wireless systems for disaster mitigation and relief operations)
|
ITU-T FG DR&NRR
|
|
2014-05-26 |
|
[ 532 ]
(Rev.1) |
Liaison statement on Assistive Listening Devices (ALD) and the allocation of Mobile Phone Services in the 2.3-2.4 GHz band
|
ITU-T JCA-AHF
|
|
2014-05-26 |
|
[ 531 ]
|
Liaison statement to Working Party 5A (copy for information to Working Parties 5B and 3L) - WRC-15 agenda item 1.4 - Status of studies and draft CPM text for WRC-15 agenda item 1.4
|
WP 5C
|
|
2014-05-23 |
|
[ 530 ]
|
Report on relevant activities in certain countries in Region 1
|
Liaison Rapporteur
|
|
2014-05-19 |
|
[ 529 ]
|
Report on relevant activities in IRG-AVA Intersector Rapporteur Group Audio Visual Media Accessibility - Joint coordination activity on accessibility and human factors (JCA-AHF)
|
Liaison Rapporteur
|
|
2014-05-19 |
|
[ 528 ]
(Rev.1) |
List of documents issued (Documents 5A/421 - 5A/542)
|
BR Study Groups Department
|
|
2014-05-16 |
|
[ 527 ]
|
Liaison statement to Working Party 5B (copy to Working Party 5A) - Agenda item 1.18 - Systems characteristics and compatibility of automotive radars operating in the frequency band 77.5-78 GHz for sharing studies
|
WP 7D
|
|
2014-05-15 |
|
[ 526 ]
|
Liaison statement to Joint Task Group 4-5-6-7 (copy Working Party 5A) - Reply to the Joint Task Group 4-5-6-7 liaison statement on potential mitigation techniques for RLAN interference to EESS (active) in the band 5 350-5 470 MHz
|
WP 7C
|
|
2014-05-15 |
|
[ 525 ]
|
Report on the recent activities of Wireless World Research Forum (WWRF)
|
WWRF Liaison Rapporteur
|
|
2014-05-15 |
|
[ 524 ]
|
Report on relevant activities in certain countries in Region 3
|
Liaison Rapporteur
|
|
2014-05-14 |
|
[ 523 ]
|
DFS minimum requirement to ensure an adequate protection to frequency hopping radars in the 5 GHz band
|
France
|
|
2014-05-11 |
|
[ 522 ]
|
Report on disaster relief
|
Disaster Relief Liaison Rapporteur
|
|
2014-05-13 |
|
[ 521 ]
|
Proposed modifications to the preliminary draft new Report ITU-R [LMS.CRS2]
|
Orange
,
Telecom Italia S.p.A.
|
|
2014-05-12 |
|
[ 520 ]
|
Satellite component of the VDES for agenda item 1.16 (WRC-15)
|
France
,
European Space Agency
|
|
2014-05-12 |
Results:744 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):