Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 560 ]
|
Proposal to define and describe wavelength management and control channel in G.multi
|
FiberHome Technologies Group
|
Q2/15
|
2014-03-10 |
|
[ 559 ]
|
Proposal on G.989.2 Amendment for dual-rate PMD implementation
|
FiberHome Technologies Group
|
Q2/15
|
2014-03-10 |
|
[ 558 ]
|
Proposal for revision of cable documents L.10, L. 26, L.43
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q16/15
|
2014-03-10 |
|
[ 557 ]
|
The possibility of CPRI signal transmission over TWDM-PON system in G.989.3
|
FiberHome Technologies Group
|
Q2/15
|
2014-03-10 |
|
[ 556 ]
|
Thermal Profiles for Telecom Equipment
|
Sprint Corporation
,
Rakon, UK
|
Q13/15
|
2014-03-10 |
|
[ 555 ]
|
Proposal for revision of L.53
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2014-03-10 |
|
[ 554 ]
|
G.8271.2: SOAM Assisted Partial Timing Support
|
Sprint Corporation
,
ADVA, Israel
|
Q13/15
|
2014-03-10 |
|
[ 553 ]
|
Proposal for new test methods of Hydrogen Aging
|
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
|
Q5/15
|
2014-03-10 |
|
[ 552 ]
|
G.8271.2: Budget proposal for Assisted Partial Timing Support
|
Sprint Corporation
,
Calnex, UK
|
Q13/15
|
2014-03-10 |
|
[ 551 ]
|
Proposal of draft revised L.25
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2014-03-10 |
|
[ 550 ]
|
Drafting proposal of new recommendation L.91
|
FiberHome Technologies Group
|
Q16/15
|
2014-03-10 |
|
[ 549 ]
|
Assisted Partial Timing Support Clock
|
Sprint Corporation
|
Q13/15
|
2014-03-10 |
|
[ 548 ]
|
Proposal of Appendix for L.omtl
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2014-03-10 |
|
[ 547 ]
|
Proposed Supplement for the guidance to performance measurement by ETH OAM
|
Fujitsu Limited
,
NEC Corporation
|
Q14/15, Q10/15
|
2014-03-10 |
|
[ 546 ]
|
Draft guidance to performance measurement by ETH OAM
|
Fujitsu Limited
,
NEC Corporation
|
Q14/15, Q10/15
|
2014-03-10 |
|
[ 545 ]
|
Proposed corrections to G.8121 series and G.8151 for alignment
|
Fujitsu Limited
|
Q14/15, Q10/15
|
2014-03-10 |
|
[ 544 ]
|
Proposed update items to G.8121 series in align with G.8151 and G.8152
|
Fujitsu Limited
|
Q14/15, Q10/15
|
2014-03-10 |
|
[ 543 ]
|
Proposed architecture for MPLS-TP linear protection
|
Fujitsu Limited
|
Q9/15
|
2014-03-10 |
|
[ 542 ]
|
2-stage ODU SMP protocol operation in beyond 100G networks
|
Coriant GmbH & Co. KG
|
Q9/15
|
2014-03-09 |
|
[ 541 ]
|
Performance analysis of OTUC4 and OTLC4.16 frame alignment
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 540 ]
|
Logical lane format of OTUCn without FEC
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 539 ]
|
FEC options of OTUCn
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 538 ]
|
Proposed mapping for new FC and IB client signals
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 537 ]
|
Proposal for OTUCn, ODUCn and OPUCn Payload bit rates
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 536 ]
|
B100G FEC and logical lane considerations
|
China Mobile Communications Corporation
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 535 ]
|
B100G extension of G.709 and G.798
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 534 ]
|
Proposed text for optical layer overhead clauses 15, 15.1, 15.4 and 15.5
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 533 ]
|
Optical layer overhead considerations and proposal for OTN B100G
|
Coriant GmbH & Co. KG
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q6/15, Q11/15
|
2014-03-09 |
|
[ 532 ]
|
Proposal to add multi-vendor IaDI section layer overhead
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 531 ]
|
Include support for OTM-1 mvIaDI in G.709
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 530 ]
|
Modifications to the text in clause 15.5.4 "OCh OH transport over OTM-1 multi-vendor IaDI"
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 529 ]
|
Proposal of Multi-failure processing for ODUsmp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2014-03-09 |
|
[ 528 ]
|
Proposal of APS signalling transmitting pattern for ODUsmp
|
ZTE Corporation
|
Q9/15
|
2014-03-09 |
|
[ 527 ]
|
Number of categories in Rec. ITU-T G.652
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2014-03-09 |
|
[ 526 ]
|
Information and comment on zero-dispersion wavelength of G.652 fibre
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2014-03-09 |
|
[ 525 ]
|
G.8261 Synchronous Ethernet Network Jitter Specification beyond 10GE
|
Deutsche Telekom AG
|
Q13/15
|
2014-03-08 |
|
[ 524 ]
|
G.8262 Synchronous Ethernet Equipment Jitter Specification beyond 10GE
|
Deutsche Telekom AG
|
Q13/15
|
2014-03-08 |
|
[ 523 ]
|
Withdrawn by submitter
Reposted as TD193/PLEN, "Draft revised Recommendation ITU-T G.976 (for Consent, 4 April 2014)"
|
N/A
|
|
2014-03-08 |
|
[ 522 ]
|
Proposal to discuss optical cables for low-cost sustainable telecommunication infrastructure for remote areas in developing countries
|
The ITU Association of Japan
|
Q16/15
|
2014-03-08 |
|
[ 521 ]
|
G.8152 v0.05 Data Dictionary clauses 1.7 - 1.11
|
Alcatel-Lucent USA Inc.
|
Q14/15
|
2014-03-08 |
|
[ 520 ]
|
Proposal Work Areas for updating G.8052
|
Alcatel-Lucent USA Inc.
|
Q14/15
|
2014-03-08 |
|
[ 519 ]
|
Updates in the G.8271.1
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-03-08 |
|
[ 518 ]
(Rev.1) |
Proposal for the Multiplexing of ODU clients into OTUCn
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 517 ]
|
Cyclically Interleaved BCH "Swizzle" FEC for B100G IrDI or MV-IaDI
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 516 ]
|
Timing Distribution with PTP-over-OTN Overhead Proposal
|
PMC-Sierra, Inc.
|
Q13/15, Q11/15
|
2014-03-08 |
|
[ 515 ]
|
OTUCn Overhead Byte proposal
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 514 ]
|
Proposal for a scalable OTUCn frame structure
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 513 ]
|
Overview summary of B100G frame format and 400GE client mapping proposals
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 512 ]
|
400GbE client mapping proposals
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 511 ]
|
G.inp: Comparison of L2.1 power reduction methods
|
TQ DELTA. LLC
|
Q4/15
|
2014-03-07 |
Resultats:2210 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):