International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Transport, access and home

Study Period 2017

Results:2858 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1209 ]  
 
Proposed new Recommendation for MTN Architecture     China Information Communication Technologies Group , Ciena Canada , Infinera Corporation (United States)   Q12/15, Q11/15   2019-06-14
[ 1208 ]  
 
Improved LDPC Design for 50G-PON Burst-Mode Upstream Transmission Improved LDPC Design for 50G-PON Burst-Mode Upstream Transmission     Futurewei Technologies US R&D Center (United States)   Q2/15   2019-06-14
[ 1207 ]  
 
Include channel asymmetric group delay as parameter in G.672     ADVA Optical Networking (United Kingdom) , Deutsche Telekom AG (Germany) , Hellenic Telecommunications Organization S.A. (OTE) (Greece) , Orange Polska S.A. (Poland)   Q7/15   2019-06-14
[ 1206 ]  
 
Accuracy of correlation OTDR for fibre delay measurement     ADVA Optical Networking (United Kingdom) , Deutsche Telekom AG (Germany) , Hellenic Telecommunications Organization S.A. (OTE) (Greece) , Orange Polska S.A. (Poland)   Q6/15   2019-06-14
[ 1205 ]  
 
Proposal to specify openFEC for FlexO-LR 450 km application     Acacia Communications, Inc (United States)   Q11/15   2019-06-14
[ 1204 ]  
 
Consideration for Encoded Ethernet packet type MTN client signal mapping     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1203 ]  
 
Text Proposal for MTN client signal Mapping of MAC frame type     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1202 ]  
 
Proposal for MTN equipment Recommendation draft skeleton     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1201 ]  
 
MTN functional model and characteristic information analysis     Huawei Technologies Co., Ltd. (China)   Q12/15, Q11/15   2019-06-14
[ 1200 ]  
 
MTN architecture requirement and need     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q12/15   2019-06-14
[ 1199 ]  
 
Path layer subnetwork considerations     Huawei Technologies Co., Ltd. (China)   Q12/15, Q11/15   2019-06-14
[ 1198 ]  
 
clarification on client signal integrity issue in G.mtn architecture     Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1197 ]  
 
discussion and comparison for different OAM mechanisms     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1196 ]  
 
proposal for G.mtn terminologies     Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1195 ]  
 
analysis for IPG based OAM insertion impact on PCS state machine     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1194 ]  
 
G.mtn path layer OAM information format solutions analysis     Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1193 ]  
 
G.mtn path layer sink OAM jitter analysis  
To be verified by TSB
 
Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1192 ]  
 
G.mtn fault condition analysis     Huawei Technologies Co., Ltd. (China)   Q11/15   2019-06-14
[ 1191 ]  
 
Increase the maximum number of burst allocation series per ONU in a BWmap for XG PON     Huawei Technologies Co., Ltd. (China)   Q2/15   2019-06-14
[ 1190 ]  
 
Coexistence between HSP and XG(S)-PON     Huawei Technologies Co., Ltd. (China)   Q2/15   2019-06-14
[ 1189 ]  
 
Considerations on management requirements of TAP component     ZTE Corporation (China)   Q14/15, Q12/15   2019-06-14
[ 1188 ]  
 
Considerations on fault reporting and configuration management     Beijing University of Posts and Telecommunications (China) , ZTE Corporation (China)   Q14/15, Q12/15   2019-06-14
[ 1187 ]  
 
Draft new Rec. L.font " Requirements for a combined Fibre Optical Network Termination Box: FONT "     Ministry of Communications (India)   Q16/15   2019-06-14
[ 1186 ]  
 
Draft new Recommendation ITU-T L.tifm "Telecommunication infrastructure facility management"     Ministry of Communications (India)   Q17/15   2019-06-14
[ 1185 ]  
 
Proposal to start a new recommendation for wavelength routed PON systems     Google Fiber (United States)   Q2/15   2019-06-13
[ 1184 ]  
 
Recommendation L.osp, draft 5     OFS Fitel, LLC (United States)   Q16/15   2019-06-13
[ 1183 ]  
 
openFEC 16-QAM Low BER Performance Simulation Results     Cisco Systems, Inc. (United States)   Q11/15   2019-06-13
[ 1182 ]  
 
Proposal for including in the scope of G.9806 systems with transmission distances up to 2 km, at 10 and 25 Gbit/s bit rate     Telefon AB - LM Ericsson (Sweden)   Q2/15   2019-06-13
[ 1181 ]  
 
MTN Path Overhead Proposal - Overhead Method and Frame Structure     Microsemi Corporation (United States)   Q12/15, Q11/15   2019-06-13
[ 1179 ]  
(Rev.1) 
Analysis of the G.mtn A.1 Scope Relative to IEEE 802.3 Clause 82 State Diagrams     Microsemi Corporation (United States)   Q12/15, Q11/15   2019-06-13
[ 1178 ]  
 
Proposed draft amendment to G.7041-Y1303 for consent     Microsemi Corporation (United States)   Q11/15   2019-06-13
[ 1177 ]  
 
IEEE 1588 Precision Time Protocol Time Stamp Authority Concept  
Not yet uploaded
 
IBM (United States)   Q13/15   2019-06-12
[ 1176 ]  
 
Secure Enterprise Data Center Profile for IEEE 1588 Precision Time Protocol     IBM (United States)   Q13/15   2019-06-12
[ 1175 ]  
 
G.9806 power budget     ZTE Corporation (China)   Q2/15   2019-06-12
[ 1174 ]  
 
G.8260 Figure 10 Correction     Microsemi Corporation (United States)   Q13/15   2019-06-12
[ 1173 ]  
 
G.9806 wavelength plan     ZTE Corporation (China)   Q2/15   2019-06-12
[ 1172 ]  
 
Proposal for defining SREC for VDSL     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. (United States)   Q4/15   2019-06-11
[ 1171 ]  
 
Proposed working text for SREC for G.mgfast     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. (United States)   Q4/15   2019-06-11
[ 1170 ]  
 
FDXMASK for G.mgfast     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. (United States)   Q4/15   2019-06-11
[ 1169 ]  
 
DSM for Upstream G.mgfast NEXT     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. (United States)   Q4/15   2019-06-11
[ 1168 ]  
 
Draft New Rec. ITU-T L.fdb "Requirements for Passive Optical Nodes: Fibre Distribution Box"     Ministry of Communications (India)   Q16/15   2019-06-11
[ 1167 ]  
 
Time Aligment Error (TAE) between different PRTC Class A: Measurement results     Deutsche Telekom AG (Germany)   Q13/15   2019-06-07
[ 1166 ]  
 
Burst error tolerance for 200G/400G FlexO FEC     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q6/15, Q11/15   2019-06-06
[ 1165 ]  
(Rev.1) 
Proposed new work item on the specification of the coexistence element for Higher Speed PON and an amendment 2 to ITU G.984.5Amd1     AT&T, Inc. (United States) , China Telecommunications Corporation , Futurewei Technologies US R&D Center (United States)   Q2/15   2019-06-01
[ 1164 ]  
 
25G NRZ measurements in C band     Sumitomo Electric Industries, Ltd. (Japan) , Telefon AB - LM Ericsson (Sweden)   Q6/15   2019-05-31
[ 1163 ]  
 
Optical Physical Infrastructures     Ministère des Postes, des Télécommunications et de l'Economie Numérique (Guinea)   Q16/15   2019-05-31
[ 1162 ]  
 
Proposed new work item on a WDM- PON recommendation project     China Information Communication Technologies Group , China Information Communication Technologies Group , China Telecommunications Corporation , Futurewei Technologies US R&D Center (United States) , Orange (France) , ZTE Corporation (China)   Q2/15   2019-05-29
[ 1161 ]  
 
Relative time error to be considered when the GNSS receive used to measure timing error of network     Ciena Canada   Q13/15   2019-05-27
[ 1160 ]  
 
Optical systems for fibre access networks in the Democratic Republic of the Congo     Dem. Rep. of the Congo   Q2/15   2019-05-23
[ 1159 ]  
 
HS-PON Wavelength Plan & Co-existence Filter     British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)   Q2/15   2019-05-23
Results:2858 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48 - 49 - 50 - 51 - 52 - 53 - 54 - 55 - 56 - 57 - 58  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2022-01-20