Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Resultados :2390 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 890 ]  
 
Consideration of the proactive FD/FDV measurements in G.8021/Y.1731     NEC Corporation   Q9/15, Q14/15, Q10/15   2010-05-18
[ 889 ]  
 
Consideration of the enhancement of performance monitoring in G.8021/Y.1731     NEC Corporation   Q9/15, Q14/15, Q10/15   2010-05-18
[ 888 ]  
 
Proposal for OMCI transport in Ethernet PON     Mitsubishi , Ericsson , HItachi , NTT   Q2/15   2010-05-18
[ 887 ]  
 
Black-hole problem due to address mis-learning in G.8032     Korea (Republic of)   Q9/15   2010-05-18
[ 886 ]  
 
Proposal to modify failure of protocol conditions in G.8031 and G.873.1     Korea (Republic of)   Q9/15   2010-05-18
[ 885 ]  
 
MS-W (Manual Switch to Working) in revertive operation in G.8031     Korea (Republic of)   Q9/15   2010-05-18
[ 884 ]  
 
Proposal to comprehensively classify modulation/demodulation and multiplex/demultiplex schemes used in optical transmission systems     NTT   Q6/15   2010-05-18
[ 883 ]  
 
Applications of G.9960, G.9961 Transceivers for Smart Grid applications: Advanced Metering infrastructure, Energy Management in the home, and Electric Vehicles     Lantiq Beteiligungs , DS2   Q4/15   2010-05-18
[ 882 ]  
 
Consideration of jitter performance measurement method for XG-PON optical interfaces     CIAJ   Q2/15, Q15/15   2010-05-18
[ 881 ]  
 
Proposal for definition of COTDR     CIAJ   Q8/15, Q15/15   2010-05-18
[ 880 ]  
 
Proposal for correction of table1 parameters in O.174     CIAJ   Q15/15   2010-05-18
[ 879 ]  
 
Proposal for addition of jitter test parameters and text in O.174     CIAJ   Q15/15   2010-05-18
[ 878 ]  
 
Proposal for Title, Summary and Scope of O.xgponjitter     CIAJ   Q2/15, Q15/15   2010-05-18
[ 877 ]  
 
Comments on the protocol specifications in Y.1731     NEC Corporation   Q10/15   2010-05-18
[ 876 ]  
 
Issues with the Transparent Clock concept of PTPv2 in a telecom environment     France Télécom   Q4/15, Q2/15, Q13/15   2010-05-18
[ 875 ]  
 
Architecture for phase and time distribution     France Télécom   Q4/15, Q2/15, Q13/15   2010-05-18
[ 874 ]  
 
G.hn: 802.1Qat support in G.hn     Intel Corp.   Q4/15   2010-05-18
[ 873 ]  
 
G.8260: discussion on packet pre-selection criteria and comments on cluster and FWPR PDV metrics     France Télécomq   Q13/15   2010-05-18
[ 872 ]  
 
G.8260: technical comments regarding WD115 (PDV metrics) from San Jose interim meeting     France Télécom , Tellabs   Q13/15   2010-05-18
[ 871 ]  
 
G.8260: definition of floor delay, delay steps, and comments on Appendix I     France Télécom   Q13/15   2010-05-18
[ 870 ]  
 
G.8260: list of requirements for PDV metrics     France Télécom   Q13/15   2010-05-18
[ 869 ]  
 
G.cx: A concern regarding operation with non-standardized systems     CopperGate Communications   Q4/15   2010-05-18
[ 868 ]  
 
G.hn: IPR Statement of CopperGate Communications     CopperGate Communications   Q4/15   2010-05-18
[ 867 ]  
 
G3 Low Frequency Narrow Band OFDM PLC Proposal     Maxim Integrated Products, Inc.   Q4/15   2010-05-18
[ 866 ]  
 
Rogue ONU draft supplement     Verizon   Q2/15   2010-05-18
[ 865 ]  
 
G.8260: methodology to perform a PDV measurement     France Télécom, Ericsson   Q13/15   2010-05-18
[ 864 ]  
 
G.hnem: Report on informal ad-hoc - Performance of the FEC for G.hnem     Lantiq , DS2 , Yitran   Q4/15   2010-05-18
[ 863 ]  
 
G.hnem: Proposal to specify immediate acknowledgement     Lantiq   Q4/15   2010-05-18
[ 862 ]  
(Rev.1) 
The removal of Floor Delay steps in Network PDV metrics     Calnex Solutions   Q13/15   2010-05-18
[ 861 ]  
 
Development of a Wander requirement for 1588v2 Boundary Clocks     Calnex Solutions   Q13/15   2010-05-18
[ 860 ]  
 
Proposed addition of 'No APS Message Received' defect to G.8021     Tellabs   Q9/15   2010-05-18
[ 859 ]  
 
Further considerations for ODUk delay measurement processes     Tellabs   Q9/15   2010-05-18
[ 858 ]  
 
Adding administrative state to ODU multiplexing adaptation functions     Tellabs   Q9/15   2010-05-18
[ 857 ]  
 
G.hnem: Proposal for G.hnem encryption scheme     Lantiq   Q4/15   2010-05-18
[ 856 ]  
 
G.INP: SRA Proposal for G.998.4     Broadcom   Q4/15   2010-05-18
[ 855 ]  
 
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links     Broadcom   Q4/15   2010-05-18
[ 854 ]  
 
G.vdsl: G.adsl: Comments and way forward on INM accuracy     Broadcom   Q4/15   2010-05-18
[ 853 ]  
 
Proposed description of optical source for optical phase sensitive modulation/demodulation schemes used for high-speed large-capacity WDM transmission     NTT   Q7/15   2010-05-17
[ 852 ]  
 
Proposal for adding a new category, A3, to ITU-T Recommendation G.657 (Full Texts)     Corning   Q5/15   2010-05-17
[ 851 ]  
 
Number not used     SoftBank Telecom   Q5/15   2010-05-17
[ 850 ]  
 
VDSL2 issues for discussion at dedicated DSL meetings     Swisscom Ltd   Q4/15   2010-05-17
[ 849 ]  
 
Proposal for adding a new sub-category, A3, to ITU-T Recommendation G.657 (Explanation)     Corning   Q5/15   2010-05-17
[ 848 ]  
 
Draft supplement: 10-Gigabit-capable Passive Optical Networks (XG-PON): MAC/SERDES TO PMD interface     PMC-Sierra   Q2/15   2010-05-17
[ 847 ]  
 
Noise transfer on the same SyncE copper port     Cisco   Q13/15   2010-05-17
[ 846 ]  
 
Standardisation of DP-QPSK modulation format     Ciena Corporation   Q6/15   2010-05-17
[ 845 ]  
 
An Approach to Include OTN interfaces in Optical Fibre Submarine Cable Systems     China Unicom   Q8/15   2010-05-17
[ 844 ]  
 
G.8262 V.2 minor comments     Deutsche Telekom   Q13/15   2010-05-17
[ 843 ]  
 
Flush Logic for Non-virtual Channel     Nokia Siemens Networks   Q9/15   2010-05-17
[ 842 ]  
 
Time and Phase Sync noise budget in G.8271     Ericsson   Q13/15   2010-05-17
[ 841 ]  
 
Details on Time Sync Methods in G.8271     Ericsson   Q13/15   2010-05-17
Resultados :2390 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2021-01-29