Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:177 documents
Résultats :  Précédent -  1 - 2 - 3 - 4
Contributions  [ Source: Huawei Technologies Co. Ltd. ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 227 ]  
 
Enhancements of OTN hybrid equipment     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q11/15, Q10/15   2013-06-17
[ 226 ]  
 
Multilayer protocol stack of OTN interface     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 225 ]  
 
Comparison of OTU4Cn vs OTUCn     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 224 ]  
 
Beyond 100G use case and design considerations     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 223 ]  
 
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2013-06-17
[ 222 ]  
 
Multi-carrier OCh signal and connection behaviour under optical layer faults     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 220 ]  
 
OTM-1 multi vendor IaDI management capability requirements     Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 219 ]  
 
Proposal to add a description of a multi-carrier OCh for the transport of an OTUk     Huawei Technologies Co. Ltd.   Q14/15, Q11/15   2013-06-17
[ 218 ]  
 
The APS command exercise is not optional     Huawei Technologies Co. Ltd.   Q3/15   2013-06-17
[ 217 ]  
 
Use of BIP monitors behind a HD or SD FEC process     Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 216 ]  
 
Block diagram example of n x OTU4 and OTUCn framer     Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 215 ]  
 
Beyond 100G tributary slot structure considerations     Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 214 ]  
 
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function     Huawei Technologies Co. Ltd.   Q11/15, Q10/15   2013-06-17
[ 189 ]  
 
Multilayer protocol stack of OTN interface  
Withdrawn: Duplicate of C-0226
 
China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q11/15   2013-06-17
[ 145 ]  
 
ODU SMP Activation Time     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 144 ]  
 
Improved Encoding/processing of Messages for 1-Stage ODU SMP Protocol     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 143 ]  
 
Determining the Time Position of Upstream Probe Sequence     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 142 ]  
 
G.fast: On Discontinuous Operation     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 141 ]  
 
On Transition From L2.2 to Other States     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 140 ]  
 
Probe Sequence Modulation and Error Signal Feedback     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 139 ]  
 
On PSD Control in Vectoring     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 138 ]  
 
Asynchronous OLR for PSD Control     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 100 ]  
 
G.hn: Backup security controller mechanism     Huawei Technologies Co. Ltd.   Q18/15   2013-06-14
[ 99 ]  
 
G.hn: Improving the existing domain merging procedure     Huawei Technologies Co. Ltd.   Q18/15   2013-06-14
[ 53 ]  
 
Necessity to Support External Commands in ODU SMP Protocol     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15   2013-06-13
[ 41 ]  
 
Definition of serial data interface comunication ME in G.988     FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q2/15   2013-06-13
[ 15 ]  
(Rev.1) 
Some considerations for modelling Sub-lambda photonic switched networks (SLPSN)     France Télécom Orange , Huawei Technologies Co. Ltd. , Portugal Telecom, SGPS, S.A. , Swisscom SA , Telecom Italia S.p.A. , Telefónica, S.A. , Telstra Corporation Ltd. , Verizon Communication Corporation   Q12/15   2013-05-31
Resultats:177 documents
Résultats :  Précédent -  1 - 2 - 3 - 4  
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-7