Contribuciones
[ Origen: Huawei Technologies ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 686 ]
|
Discussion of G.8264.1 Message Forwarding Behaviour
|
Huawei Technologies
|
Q13/15
|
2009-09-20 |
|
[ 685 ]
|
Packet Master Traffic Load Analysis based on ITU-T PTP profile message rates
|
Huawei Technologies
,
CATR
,
MII
|
Q13/15
|
2009-09-20 |
|
[ 684 ]
(Rev.1) |
Proposal on adding bandwidth notification function in G.808.1 and G.8031
|
Huawei Technologies
|
Q9/15
|
2009-09-20 |
|
[ 683 ]
|
G.800 Transport Entities
|
Huawei Technologies
|
Q12/15
|
2009-09-20 |
|
[ 572 ]
|
ODUflex hitless resizing method
|
Huawei Technologies
,
China Mobile Communications Corp
|
Q9/15, Q11/15
|
2009-09-18 |
|
[ 569 ]
|
Proposal of re-using equipment protection profile for supporting N:1 protection in G.984.4
|
Huawei Technologies
|
Q2/15
|
2009-09-18 |
|
[ 568 ]
|
Proposal for supporting related BM-CM RE and WC-enabled RE configuration in G.984.4
|
Huawei Technologies
|
Q2/15
|
2009-09-18 |
|
[ 533 ]
|
HO and LO ODUk Shared Ring Protection (SRP)
|
Huawei Technologies
,
China Academy of Telecommunication Research, MII
,
China Mobile Communications Corporation
|
Q9/15
|
2009-09-18 |
|
[ 505 ]
|
Initial Analysis of STM-1 Client Jitter and Wander Accumulation over OTN Islands
|
Huawei Technologies
|
Q13/15, Q11/15
|
2009-09-17 |
|
[ 504 ]
|
Initial Analysis of CPRI Client Jitter and Wander Accumulation over OTN islands
|
Huawei Technologies
|
Q13/15, Q11/15
|
2009-09-17 |
|
[ 502 ]
|
1 Gbit/s Ethernet Client Wander Accumulation in the Presence of Input Noise and Wide-band Jitter Accumulation, over OTN Islands
|
Huawei Technologies
|
Q13/15, Q11/15
|
2009-09-17 |
|
[ 501 ]
|
Initial Development of Ethernet and SDH Input Noise Models for OTN Transport Jitter and Wander Accumulation Analyses
|
Huawei Technologies
|
Q13/15, Q11/15
|
2009-09-17 |
|
[ 454 ]
|
Proposal to study Shared Mesh Protection
|
Huawei Technologies
,
CATR
,
MII
|
Q9/15
|
2009-09-16 |
|
[ 453 ]
|
Considerations on the description of the ODU layer network in G.872 and G.8080
|
Huawei Technologies
|
Q14/15, Q12/15
|
2009-09-16 |
|
[ 452 ]
|
Transfer delay for FC over OTN
|
Huawei Technologies
|
Q11/15
|
2009-09-16 |
|
[ 445 ]
|
Management of high capacity connections in the OTN
|
Huawei Technologies
|
Q12/15
|
2009-09-16 |
|
[ 443 ]
|
Text proposal to align clause 9/G.872 with draft revised G.709
|
Huawei Technologies
|
Q12/15
|
2009-09-16 |
|
[ 441 ]
|
GPON over OTN mapping
|
Huawei Technologies
,
China Mobile Communications Corporation
,
PMC-Sierra
|
Q2/15, Q11/15
|
2009-09-16 |
|
[ 440 ]
|
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 439 ]
|
Text proposal for clause 8/G.798.1
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 438 ]
|
Proposal to specify OCh/OTUkV_A with OTUk_CP
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 437 ]
|
Multi-vendor demarcation in the OTN
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 436 ]
|
LO and HO ODU view points and NNIs
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 434 ]
|
First models of OTN equipment proposal
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 336 ]
|
G.984.4 Implementer's Guide
|
Huawei Technologies Co.,Ltd.
|
Q2/15
|
2008-11-26 |
|
[ 335 ]
|
Signal Degrade (SD) triggered protection switching
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 334 ]
|
Proposal on the link recovery in case of multiple failures in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 333 ]
|
Proposal on the ring node initialization in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 332 ]
|
Proposal on flush optimization support in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 331 ]
|
Proposal on non-revertive mode in G.80323
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 330 ]
|
Parameters in G.lcasub
|
Huawei Technologies Co., Ltd.
|
Q8/15
|
2008-11-26 |
|
[ 329 ]
|
Supplement on repeaterless optical fibre submarine cable system (G.973)
|
Huawei Technologies Co., Ltd
|
Q8/15
|
2008-11-26 |
|
[ 328 ]
|
The influence of COTDR to optical signals
|
Huawei Technologies Co., Ltd
|
Q8/15
|
2008-11-26 |
|
[ 327 ]
|
Comments on P-DPSK according to the test data
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2008-11-26 |
|
[ 326 ]
|
Proposal for Optical Interface Diagnostic Monitoring for Optical Transmission System
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2008-11-26 |
|
[ 325 ]
|
Optically identified wavelength in performance monitoring
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2008-11-26 |
|
[ 324 ]
|
About P-DPSK receiver performance dependence on optical filter characteristics
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2008-11-26 |
|
[ 323 ]
|
DCC and GCC usage for DCN
|
Huawei Technologies Co., Ltd.
|
Q14/15
|
2008-11-26 |
|
[ 322 ]
|
DCC and GCC usage for DCN (different version)
|
Huawei Technologies Co., Ltd.
|
Q14/15
|
2008-11-26 |
|
[ 321 ]
|
Additional Call attributes for VCAT/LCAS
|
Huawei Technologies Co., Ltd., China
|
Q14/15
|
2008-11-26 |
|
[ 320 ]
|
G.800 Terminology and Backward Compatibility with G.805
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 319 ]
|
G.800 Description of Media Networks
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 318 ]
|
G.800 Interconnect Entities
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 317 ]
|
Proposal to extend G.8012
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2008-11-26 |
|
[ 251 ]
|
Proposal on Continuous Mode of LR-PON
|
Huawei Technologies Co., Ltd. RAD Data communicati
|
Q2/15
|
2008-11-21 |
|
[ 233 ]
|
Text proposal for clause 9.1.4/G.8021 ETH Split Horizon Flow Forwarding Function
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-21 |
|
[ 146 ]
|
Analysis of TTT+GMP vs GFP-T as 1GE into OPU0 mapping method
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2008-11-20 |
|
[ 131 ]
|
Proposal on Continuous Mode of LR-PON
|
Huawei Technologies Co., Ltd. RAD Data communication Ltd.
|
Q2/15
|
2008-11-20 |
|
[ 107 ]
|
Proposals to extend G.709
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2008-11-20 |
|
[ 95 ]
|
OPUk GMP proposal
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2008-11-20 |
Resultados :209 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):